Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    MTEC Mining Engineering Education Initiatives In Australia

    By Bruce Hebblewhite

    This paper focuses on the recent achievements and practices developed through the Minerals Tertiary Education Council (MTEC) initiative of the Minerals Council of Australia (MCA), in conjunction with

    Jan 1, 2005

  • SME
    Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 m

    By L. Mukka

    The existing main mine ventilation system for the production areas to the Kiruna mine was constructed during the period 1994-1996 and extended with 4 more shafts, including fan stations, for the sea o

    Jan 1, 2009

  • SME
    Geotechnical Investigation For Soft Ground Tunnel In Alexandria, Egypt

    By G. Avolio, M. Gilbert

    INTRODUCTION The city of Alexandria, Egypt is located on the Mediterranean Sea at the northwestern edge of the Nile River delta. The city is approximately 26 km long and 3 km wide bounded by the se

    Jan 1, 1987

  • SME
    Ways To Deal With Mine/Plant Effluent Residues: A Roadmap Process

    By K. Tabra

    In a mine operation, the proper strategy to handle residues is one of the main concerns, in particular when dealing with mine/plant liquid effluents. Most active water treatment systems at metal mines

    Feb 27, 2013

  • SME
    Automatic Creation Of Ore-Selection And Blast Polygons Using Clustering Algorithms

    There are multiple stages in a mining operation that a mining engineer has to draw polygons to be used as operation guidelines. These polygons are drawn by hand and based on engineer?s experience. How

    Feb 27, 2013

  • SME
    Preparing A Feasibility Study Request For Proposal In The 21st Century

    By G. Wahl, H. Danilkewich, T. Mann

    Developers of advanced mining projects face the challenge of how to craft a “Request for Proposal for a Feasibility Study” that will result in bids that are comparable and will lead to a successful ex

    Jan 1, 2002

  • SME
    Sinking A Freeze Shaft With Installation Of A Water-Tight, Flexible Lining

    By Klaus Stoss, Bernd Braun

    The sinking and lining of a large mine shaft with 8.0 m i.d. and 1,133 m total depth is described in detail. The ground freezing method was applied to safely sink the shaft through unstable, waterbear

    Jan 1, 1983

  • SME
    Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of Design

    By Jimmy Thompson

    The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const

    Jan 1, 2008

  • SME
    Felsic Volcanics And Tungsten In Neoarchaean Hutti Schist Belt, India.

    By P. Sangurmath, C. Gundewar, M. Riyazulla, V. Vasudev, N. Shadaksharswami

    Dharwar craton in the southern Indian shield, comprises the Neoarchaean foreland in the west and a relatively younger accretionary complex composed of granitoids and intervening gold-bearing volcano-s

    Jan 1, 2007

  • SME
    Automatic Determination Of Dig Limits Subject To Geostatistical, Economic, And Equipment Constraints

    By K. Norrena

    Grade control in open pit mining requires the specification of dig limits that account for mineral grades, economic costs, and selectivity of mining equipment. Visual identification of ore rock types

    Jan 1, 2001

  • SME
    Mine Production Scheduling Optimization At Newmont?s Twin Creeks Mine

    Newmont?s Twin Creeks Mine, located in northern Nevada, is producing gold ore from surface mining operations. The ore is currently processed at three different on site facilities depending on the ore

    Feb 27, 2013

  • SME
    Exploratory Shafts For The Nuclear Waste Repository In Basalt

    By Birger Schmidt

    INTRODUCTION Conceptual design of the first Exploratory Shaft (ES-I) for the Nuclear Waste Repository in Basalt (NWRB) began in July 1981; detailed design began in February 1982, and was largely co

    Jan 1, 1987

  • SME
    Coal Dust Wettability: It?s Role In Dust Control And Its Determination

    By K. Mondal

    A macroscopic approach integrated with microscopic analyses for wettability characterization is presented. Wetting depends on 1) Contact between the dust and the fluid droplets, 2) Wettability of the

    Jan 1, 2012

  • SME
    Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses

    By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw

    An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac

    Jan 1, 1979

  • SME
    Alignment Of Short-Term And Operational Plans Using Discrete Event Simulation

    The fundamental objective of mine plans are usually to maximize the mine profit by extracting ore at the lowest possible cost over the mine life while some technical constraints are satisfied. Since t

    Jan 1, 2012

  • SME
    Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone Technology

    By R. Bokotko, J. D. Miller, J. Hupka

    Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption

    Jan 1, 2002

  • SME
    The Application Of Geotechnical Monitoring To Stability Evaluation And Mine Design

    By H. Maleki

    In this paper, long-term measurements in five underground mines are presented to demonstrate how these measurements can be applied to stability evaluations and design of underground excavations. These

    Jan 1, 2002

  • SME
    Record Attendance Turns Out For 2008 Fox Conference

    The state of the tunneling and underground construction industry and the advancements of the industry?s biggest machines were the main topics at the 2008 edition of the UCA of SME?s annual George A. F

    Jan 1, 2008

  • SME
    The Optimum Production Equipment Scale For Open Pit Coal Mining

    The trend for using larger equipment in open pit mining to achieve cost effectiveness raises the question about the optimum economic point of scale in the current world of globalization. The present p

    Jan 1, 2004

  • SME
    Determination Of The Practical Spacing Between Holes For The Expansive Mortars Utilization In Dimension Stone Quarries

    By E. Bakhtavar

    Finding a ?practical spacing between the holes? for use of the expansive mortars is an important problem in dimension stone quarries. Objective has been to first introduce a relationship between this

    Jan 1, 2011