Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Advance Blasting using Drone Mapping and AI for Comprehensive Blast Performance Analysis

    By Dr. Anurag Agrawal, Fathur Rozaq, Nella Lubis, Relinda Sanistya, Herry Saputra, Rudolf Sitorus

    In mining operations, basic drone applications such as pre- and post-blast photo comparisons, blast video recordings, and sample-based fragmentation analysis are often used to assess blast performance

    Jan 21, 2025

  • ISEE
    Using New Technologies to Achieve Customer Tailored Fragmentation

    By Felix Degold, Mark Ganster

    Achieving a customer optimized fragmentation by using robust data from new technologies e.g. GPS positions of boreholes, fragmentation analysis to calibrate the geology and fragmentation prediction mo

    Feb 1, 2020

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Median and Mean in the Kuz-Ram Model

    By CVB Cunningham

    "The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion

    Jan 1, 2016

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Vibration Analysis for Blasting on a 16th Century Environment in Toledo - Spain

    By Jesus Pascual, Benjamin Cebrian

    A new Convention Center is going to be built in the millenary city of Toledo, right in the old city limits. The workings will need to excavate some 80.000 cubic meters of granite, which has, a trench-

    Jan 1, 2004

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, Nevada

    By Donald Wagstaff, D. Scott Scovire

    The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,

    Jan 1, 2004

  • ISEE
    Super Accurate Detonators - A Rockblaster's Dream

    By Jan Westberg, Roger Holmberg, Bernt Larsson

    Over the last couple of decades there has been an increased demand from the market for precision detonators, partly because of a need for better blasting results and partly because of a need for bette

    Jan 1, 1988

  • ISEE
    Detection of Geological Features using Aerial Image Analysis and Machine Learning

    By Ravi Sahu, Ankit Jha, Sudarshan Rajagopal, Purushotham Tukkaraja

    Geologic structures are one of the crucial parameters in blast design. Structural geology and rock properties influence drilling patterns, blast layout, and initiation systems. A comprehensive underst

    Feb 1, 2020

  • ISEE
    Utilization of Detonation Cord to Pre-split Pennsylvanian Aged Sandstone and Shale, Grundy, Virginia

    By Calvin Konya, Steven S. Spagna, Ed Smith

    During Summer 2001, the U.S Army Corps of Engineers awarded a contract to the construction firm of Bush and Burchett of Allen, Kentucky, for the purpose of developing a 13 acre redevelopment site by r

    Jan 1, 2005

  • ISEE
    Blasting Improvements by Using Most Active Rock Variations on Blast

    By Alain Blanchier, Anne Charline Sauvage

    Rock mass variations have a huge influence on explosives efficiency and on blasting results. Numerous blasting improvements could be gained by taking into account rock mass and its variations. However

    Jan 1, 2004

  • ISEE
    Productive Partnership – Advanced Blasting Technology at Newlands Coal Mine

    By Les Willan, Chris Batten, Matt Sparkes

    In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss

    Jan 1, 2010

  • ISEE
    Review and Learnings from a Surface Quarry Rockfall Incident

    By Andrew Moore

    It has long been common practice to conduct drilling and blasting operations at surface quarries in the Midwest in close proximity to near-vertical highwalls. The main reasons for such an approach, an

    Feb 6, 2023

  • ISEE
    Study of Ultrafines Control in Blasting

    By A. Andrades, E. Arias, Y. Pizarro, J. Alarcón

    Division Ministro Hales - Codelco (DMH) is located at 2600 meters above sea level, 10 km north of the city of Calama, Antofagasta region, Chile. In operation since 2010, it corresponds to a porphyry

    Jan 1, 2024

  • ISEE
    Mountain Mass Surrenders to Man's Initiative & Daring

    By Yogesh Narula

    Nevis Bluff Landslide - On September 17” 2000, a rockfall measuring lO,OOOm3 at Nevis Bluff, New Zealand, triggered a loday emergency. It ended when a hazardous column of rock that towered over State

    Jan 1, 2002

  • ISEE
    Application of Differential Blasting for Value Chain Optimisation

    By Stephen Mansfield, Saran Sankar

    The Sentinel open pit copper mine, operated by First Quantum Minerals Ltd, is located in the North West province of Zambia. The Sentinel orebody is a sediment-hosted, structurally modified deposit in

    Jan 21, 2025

  • ISEE
    Digital Signal Processign Applied to Seismology

    By Thad M. Jones

    This paper considers the sampling, digitizing and reconstruction of seismic signals. A sampling frequency range is proposed and a minimum limit is suggested. Digitizing precision criteria for both pea

    Jan 1, 1985

  • ISEE
    Dual Delay Detonators: a Practical Solution to Blasting Problems

    By John T. Watson, Jim Bailey

    Increasing public awareness is probably the single most important challenge faced by any blasting contractor today. This increased awareness usually results in an outcry for tighter regulations and r

    Jan 1, 1990

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014