Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Speedwave - A New, Multichannel, High Resolution, High-Speed Blast Monitor for Near and Far Field Monitoring Applications

    By Christopher Cloete Uys, Luis Manuel Poinha Valentim

    The purpose of this workshop is to describe and demonstrate the use of SPEEDWAVE, a high speed data recorder, its VOD enhancements, and the software which binds the system together. The system was des

    Jan 1, 1995

  • ISEE
    Blasting in The New Millennium - Misfires The Basics Never Change

    By Steve Dillingham

    Whenever misfired holes or portions of misfired holes remain after a blast is fired, a hazardous situation exists until the unfired explosive materials have been disposed of properly. Yet, there are s

    Jan 1, 2004

  • ISEE
    Engineering Field Controls and Hole Deviation

    By Mick Fritz, Tom Treleaven

    The success of any blast is dependent on the accuracy of the blast design and field controls placed at the shot location. The procedure by which the data is collected and analyzed is paramount to acco

    Jan 1, 1998

  • ISEE
    Environmental Blasting: Rehabilitiation of Surface Mining Sites Using Blasting

    By Richard E. Danell

    "Blasting is a principal step in the surface mining process for breaking and, in the case of overburdencasting, moving rocks and minerals. As many surface mines are coming to the end of theiroperation

    Jan 1, 1994

  • ISEE
    Recent Developments Relating to the Certification of Explosives for Sale in European Union Countries

    By D. Pickering, R. Wharton

    The deadline for meeting legal requirements relating to the sale of explosives in the European Union was 1 January 2003. The paper examines the range of materials that have already been certified by t

    Jan 1, 2003

  • ISEE
    Numerical Modeling of the Circular-Cut using Particle Flow Code

    By Young-Dong Cho, Yonghun Jong, Dong-See Shim, Seokwon Jeon, Chung-In Lee

    The most important operation in the tunnel blasting procedure is to create an opening in the face in order to develop more free surface in the rock mass. This operation is highly dependent on the cut

    Jan 1, 2005

  • ISEE
    Evaluation and Selection of Blasthole Drilling Equipment Based on Application and Overall Cost

    By George D. Raitt

    Anyone who has spent any time in and around the drilling and blasting profession knows that probably the most critical part is the drilling portion. A blasthole is nothing more than a cylindrical vehi

    Jan 1, 1990

  • ISEE
    Large Hole Rotary Drill Performance

    By J Lyall Workman, Peter N. Calder

    "Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac

    Jan 1, 1996

  • ISEE
    A Study on Post Blast Generation of Nitrogen Dioxide

    By : D. Lawrence

    Certain blasting applications are more prone to the generation of significant levels of nitrogen dioxide post blast fumes, more commonly referred to as after blast smoke, generally ranging in color fr

    Jan 1, 1996

  • ISEE
    Study on Safe Criterion of Blasting Excavating Oil-Gas Pipeline Ditches

    By Qi Shifu, Guo Tao, Liu Haoquan, Yao Chaogui, Zheng Li

    Abstract: To excavate oil-gas pipeline ditches in a rocky region or area the explosive method is needed. When a parallel ditch is to be dug by blasting near or in the vicinity of an existing pipeline,

    Jan 1, 2014

  • ISEE
    Current Blasting Practices for Open Pit Gold Operations in Nevada

    By Ed Coulter

    Nevada has a population of 1.2 million people of which only 21% or 312,rIXl are native born Nevadans. he population between 1980-1990 grew a record of 389%. and ls the fastest growing state in the uni

    Jan 1, 1991

  • ISEE
    Is that Normal? Fundamental Observations for Best Practive Blast Vibration Anaysis

    By W. J. Birch, A. Wetherelt

    The scaled-distance model for blast vibration analysis is the standard method employed throughout the surface mining and quarrying industries to model Peak Particle Velocity (PPV) data. Although empir

    Jan 1, 2005

  • ISEE
    Professional Steps in the Blasting Process

    By Mark William Withey

    "Blasting safety in surface mining is a necessary industrial goal. Proper techniques and disciplinesexercised during the blasting process enhance the probability of achieving that goal.The blasting pr

    Jan 1, 1995

  • ISEE
    More Efficient Use of Your GPS

    By Wes Bender

    Considering the current interest in Global Positioning System (GPS) usage, it might be timely to look at a more efficient means of utilizing these instruments. The GPS system currently utilizes 28 sat

    Jan 1, 2002

  • ISEE
    The Efficiency of Blasting Versus Crushing and Grinding

    By Jack Eloranta

    "This paper compares energy requirements for blasting, crushing and grinding. By tracking electricalconsumption for various powder factors, a general trend has appeared. This study involved over 100mi

    Jan 1, 1998

  • ISEE
    Controlled Demolition of a Reinforced Concrete Building in Seoul, Korea

    By Kwang-Tae Kim, Yong-Kun Choi, Jeong-Soo Chong, Yun-Jae Lee

    An annex building at the former Agency for National Security Planning(NSP) complex located in downtown Seoul was demolished by progressive collapse method. This work was done as a part of efforts to r

    Jan 1, 1998

  • ISEE
    Demolition of a Storehouse by the Blasting and the Simulation of the Demolition by DDA Method

    By Kunihisa Katsuyama, Yuji Ogata, Yuji Wada

    The one free surface blasting of a concrete block was simulated by Discontinuous Deformation Analysis(DDA) method. Comparing the simulated results with the concrete block blasting experiment, the crac

    Jan 1, 1996

  • ISEE
    Economic Optimization of the Blasting-Crushing-Grinding Comminution Process

    By Kai Nielsen

    The paper presents the results of several industrial and laboratory blasting, crushing and grinding tests and experiments investigating how blasting can influence the subsequent crushing and grinding

    Jan 1, 1998

  • ISEE
    The Importance of Saving the Full Wave Form and Frequency Analysis

    By Randy Wheeler

    The importance of having full wave form information for recorded blast events cannot be overstated. Knowing the peak particle velocity and the frequency at the peak are the tip of the iceberg. This pr

    Jan 1, 2005

  • ISEE
    A Spark-Generating, Non-Shock Tube, As Alternative to Conventional Shock Tube

    By Marco Antonio Falquete

    A novel spark-generating tube, containing no explosive in its composition, is evaluated and compared with conventional shock tube. The product overcomes a series of problems found in conventional shoc

    Jan 1, 2005