Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Bench Face and Quarry Fragmentation Analysis: 3D Imaging vs. Scaling References

    By Daniel Ko, Ian Bell, Shahram Tafazoli, Bahram Sameti, Aylin Azmin

    Image-based remote sensing of rock fragmentation in mining and quarry applications essentially treats each rock in the image as a data object in order to determine the rock size distribution. An obvio

    Jan 1, 2015

  • ISEE
    Large Arena Test Simulator Using Small High Explosive Charges.

    By Paul Worsey, Larry Frost, Braden Lusk, Seok Bin Lim

    For certification of blast resistant windows, current tests consist of arena tests or large air gun tests. Arena tests involve the detonation of more than 1000 pounds of explosives with windows placed

    Jan 1, 2006

  • ISEE
    A Methodology to Control Peak Particle Velocity Levels at Multiple Locations by use of Electronic Detonators

    By W. J. Birch, D. Leckenby, R. Farnfield

    The use of electronic detonators to improve fragmentation is becoming universally accepted. However their use in limiting peak particle vibrations levels is still in its infancy. Most of which is anec

    Jan 1, 2007

  • ISEE
    The Effect of Calculated Explosive Energy Output on Blast Design

    By P D. Kasbanis, Lyall Workman

    "The energy output of an explosive is typically calculated using an equation of state and computerapplications. Results are reported as weight and bulk strength, either in absolute terms or relative t

    Jan 1, 1996

  • ISEE
    Increasing Productivity Through Field Control and High-Speed Photography

    By David G. Borg

    "Although researchers have realized varying degrees of success in numerics modeling, computer blast simulations and small scale in-situ testing, most will agree that the greatest uncertainty in total

    Jan 1, 1989

  • ISEE
    A Classic Experiment with Air Overpressure and Windows

    By Charlie Adcock, Rob Farnfield, Andy Wetherelt

    The ISEE Blasters Handbook gives guidance on the level of air overpressure likely to cause occasional window breakage (151dB) and general window breakage (171dB). A long-term safe level of 140dB is al

    Jan 1, 2006

  • ISEE
    Explosive Operations and its Regulation in the Gulf of Mexico

    By D. J. Leidel

    The offshore production of oil and gas resources has been active in the Gulf of Mexico since Kerr- McGee drilled the first commercial well out of the sight of land in 1947. Since then, approximately 6

    Jan 1, 2002

  • ISEE
    Changing the Landscape of Surface Mining through Fully Wireless Initiation Systems

    By Nolan Eckroade, Nigel Pereira

    Wireless electronic blasting systems are a new technology that enable truly wireless initiation through rock, air and water. This is achieved using low frequency magnetic induction waves to wirelessly

  • ISEE
    The Journal of Explosives Engineering - Vol 21 No 2 - Dynamite Daze

    I had the opportunity recently to visit a magazine site of a major explosives company. It was fun to see the storage areas again and it was really interesting to see one of the old magazines that prob

    Jan 1, 2004

  • ISEE
    Elimination of Ground Vibrations and Fly Rock: A Case Study of an Opencast Mine

    By V. Sastry

    Signgareni Collieries Company Ltd. is operating the JK Opencast Project, at Yellandu, with a rated annual capacity of 1.6 Mt of coal with an average stripping ratio of 4.3. This opencast coal project

    Jan 1, 2001

  • ISEE
    Presplitting Techniques and Field Controls

    The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlled

    Jan 1, 1992

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    Drilling and Blasting are core operations in a mine. They impact all the downstream operations and their costs. Digital technologies exist for optimizing both drilling and blasting for many years. How

  • ISEE
    Blasting and Groundwater Contamination – Case Study

    By James Tarr, Matthew Eichler, Brent Tardif

    ANFO was being used as one of the blasting agents on a construction site in New England. Groundwater was encountered in numerous blast holes. The blasting contractor was employing typical explosives l

    Jan 1, 2003

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine. Montana Technological University (Montana Tech

  • ISEE
    Blast Performance Analysis – Wavelet Transforms of Blast Seismograms

    By Doug Anderson

    Blast vibration seismograms are generally collected strictly for compliance with regulations. The peak levels (including dominant frequency) are typically all that are looked at. However, these record

    Jan 1, 2013

  • ISEE
    Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan India

    By H. Venkatesh, Balachander R.

    This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near

    Jan 1, 2006

  • ISEE
    Applying the Concept of Difficulty of Tunnelling to Brazilian Cases

    By Luiz Guilherme Isfer Maciel, Marilena Cardu, Fernando Golin, Jacopo Seccatore

    "This study applies the concept of the difficulty of tunnelling by drilling an blasting (D&B) to selectedcases from the Brazilian tunnelling industry. The difficulty of tunnelling has been defined in

    Jan 1, 2017

  • ISEE
    Partnering in Blasthole Drilling

    By Ron Lutz

    In today’s world, production is the name of the game. We are all in business to make money. In the Quarrying and Mining industry the same holds true. The primary goal is to develop the best drilling a

    Jan 1, 2000

  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994