Jet Grouting Underpinning Of A Building In The US
By Gustavo E. Armijo
This job was done in Morristown, NJ, with mono fluid system jet grouting for the construction of a new bank building. After the demolition of the existing two story structures, an excavation in loose
Jan 1, 2002
-
Statnamic Load Testing Of High Capacity Marine Foundations
By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2005
-
Seattle Shored Excavation - Design, Construction, Monitoring
By David Winter
The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of
Jan 1, 1987
-
Special Foundation Technique For The Intersection Of Two Canals Near Magdeburg, Germany - Summary:
By Wolfgang G. Brunner
The closing of the gap in the European waterway- net is one of the big and challenging traffic projects following the German reunification. The water canals in the North German plain connect the Rhine
Jan 1, 2000
-
Mathematical Background For The Design Of Rotating Machinery Foundations With Deep Piles ? Summary
By Marius B. Wechsler
There are considered deep piles which are fixed in blocks of rotating machinery foundations. A mathematical background is developed for determining the behavior of this kind of piles for motions cause
Jan 1, 1987
-
Interface Testing For The Design Of Micropiles In Expansive Soils
By Robert W. Schaut
The use of micropiles is increasing for new construction and to retrofit distressed foundations in expansive soils. Typical micropiles in expansive soils have a lower section where the micropile grou
Jan 1, 2011
-
Drilled Pile Design and Installation Challenges in an Urban Environment
By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran
This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment
Jan 1, 2018
-
Site Management Towards Pile Execution At Qurashiya Bridge
By Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000
By Jean-Pierre Hamelin
Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper
Jan 1, 2000
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General Approach
By L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
DFI Collaborates on Risk-Based Panels
By Derrick Dasenbrock
Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co
Sep 1, 2023
-
Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? Introduction
By Geoffrey C. Hebner
Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr
Jan 1, 2003
-
A Study Of Three Test Sites Comparing Theoretical Ultimate Pile Capacities, Static Pile Load Tests, And Psuedo Static Pile Load Test Results
By Richard D. Short
The Pseudo Static Pile Load Test, PLT, is a rapid method for determining pile capacity. Pile design is usually based on theoretical calculations of ultimate load capacity using soil data from a field
Jan 1, 2000
-
Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies
By Dan Mahrt
"In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti
Jan 1, 2016
-
3 Recent Developments In Pile Design - Developments In Pile Design
By W. F. Van Impe
The design of piles and of pile groups has remarkably progressed over the past two decades. The increasing complexity of the building concept implements a more rational approach of the deep foundatio
Jan 1, 1994
-
Resonant Driving of Sheet Piles: High Production Sheet Pile Driving With Zero Ground Vibration
By Mathew Janes
"Sheet piles remain an economic solution to many shoring problems. However, installation of sheet piling suffers high noise and vibration with conventional impact or vibratory methods or low productio
Jan 1, 2014
-
Jet Grouting For Deep Excavation Support For Re-Entrant Corners
By Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
Auger Pressure Grouted Displacement Piles Installed & Tested On The Margins Of The San Francisco Bay ? Part One
By Christian Divis
[ ]
Jan 1, 2002
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983
By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
The Effect Of Overburden On Pile Capacity In A Calcareous Marl
By William M. Camp
An extensive design phase testing program in which 10 piles and 2 drilled shafts were instrumented and statically load tested to failure, was undertaken to establish relevant foundation design paramet
Jan 1, 1993