A Proposed Model For Soil/Auger Interaction During Installation Of Screw Piling Augers - SynopsisBy J. W. Slatter
Cast in situ screw piling techniques (both displacement and non displacement) have seen considerable growth in recent years due to competitive production rates, low noise and vibration free installati
Jan 1, 2000
-
Pile Driving Hammers In Centrifuge Modelling - SynopsisBy Daniel Levacher
Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install
Jan 1, 1996
-
Innovation In South East Asia - SynopsisBy Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
Application Of Several Soil Improvement Methods In ChinaBy J. H. Qian
China is one of the countries with comparatively wide distribution of soft soil. In the wake of the rapid developement in the national economy and construction, the improvement technique of soft soil
Jan 1, 2010
-
A Numerical Study On The Lateral Resistance Of Steel-Concrete Composite Drilled Shafts For Long-Span BridgesBy Juhyung Lee
Recently, large diameter drilled shafts are often used for foundations of large-scale marine bridges with high capacity and required to resist lateral loads. Steel casings are essential in supporting
Jan 1, 2008
-
Transverse Isotropy Effects On P-Y Curves For RockBy Ehab S. Shatnawi
It is common in practice to design laterally loaded rock-socketed drilled shafts using the p-y curve methods. However, the existing p-y curve criteria for rock were derived either semi-empirically or
Jan 1, 2007
-
Large Diameter Pile Driving, Acceptance And Soil-Pile Setup New East Span San Francisco-Oakland Bay BridgeBy Saba Mohan
This study presents results based on the Pile Installation Demonstration Project (PIDP) that was conducted as a part of the East Span San Francisco-Oakland Bay Bridge Seismic Safety Project. For the t
Jan 1, 2002
-
Unknown Bridge Foundation Investigation With Nondestructive Methods ?The Combined Parallel Seismic/Seismic Cone Penetrometer MethodBy Larry D. Olson
Research, hardware development, and field testing have been conducted on systems to allow easy and accurate determination of both foundation tip depth as well as the properties of the soils at and abo
Jan 1, 2007
-
Experimental And Numerical Assessment Of Osterberg Load Tests On Large Bored Piles In SandBy Roberto Nova
The selection of the Osterberg Cell (O-Cell) technology as the standard testing method for deep foundations of the Railways Po Viaduct in Northern Italy offered a relevant number of field measures on
Jan 1, 2008
-
JFKIA - Post Grouted Drilled Shafts And Driven Piles - Update - SynopsisBy Walter G. Brusey
This paper describes a comprehensive pile test program conducted at John F. Kennedy International Airport (JFKIA) to evaluate pile types and design capacities ranging from 890 to 4450 KN (100 to 500 t
Jan 1, 2000
-
Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC BerkeleyBy Pirooz Barar
The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne
Jan 1, 2004
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And ConstructionBy Aly M. Mohammad
The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent
Jan 1, 2003
-
Settlement Monitoring Of A Building Underpinned With Micropiles And Soil NailsBy Bill Zietlow
A micropile and soil nail underpinning system was installed to support a building immediately adjacent to a 25-ft deep excavation in downtown Salt Lake City, Utah. Both the building and the underpinn
Jan 1, 2008
-
Port Orange Drilled Shaft Load Tests - IntroductionBy David K. Crapps
The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load
Jan 1, 1989
-
Underwater Sound Attenuation In Construction Projects: Applying Science To Pile Driving PermitsBy Alan Christopherson
Nearshore construction projects often require installation of steel piles and specific methodologies of installing piles may adversely affect nearby species of concern. Water is an uncompressible med
Jan 1, 2013
-
Session 10 Deep Mixing Method IBy Peter Cali
There is one organization in Sweden, The Swedish Deep Stabilization Research Centre, which has been working with these questions and there is also a project, Eurosoilstab, within European Union to tak
Feb 10, 2003
-
Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a
-
Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge ProjectBy David White
"When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau
Jan 1, 2017
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016