Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Accumulated Rotations of Bucket Foundations under Long-Term Cyclic Loads in Sandy GroundBy Sung-Ryul Kim, Woong-Jong Park, Juhyung Lee, Si-Hoon Lee
"A bucket foundation has been considered to be a potential foundation technology for offshore wind turbines. In this study, a series of 1-g model tests were performed to analyze the accumulated rotati
Jan 1, 2016
-
Dcp Investigation Of Strength Increases In Polyurethane And Acrylate Treated SoilsBy Andreu J. Ferrero
Polyurethane and acrylate resins are routinely injected into soils to gain strength and control water flow. However, most published data regarding strength gain is derived from laboratory samples crea
-
3D Analysis Of The Seismic Behavior Of Inclined MicropilesBy Seyyed Mehdi Radeghi Mehrjou
It is important to study structures and their retrofitting techniques in order to avoid earthquake-induced seismic damage within countries that are prone to earthquakes. Todays, micro piles are employ
Sep 1, 2022
-
Experiences Using A Leader System For Long Cfa(Acip) Piles In HawaiiBy Damien Enright, Franz-Werner Gerressen
CFA/ACIP pile is the most used single pass drilling method for deep foundation installations. It is constructed by rotating and driving a Continuous Flight Auger (CFA) into the ground at a controlled
Oct 1, 2022
-
Studies On The Use Of Dcis Piles For Mitigating Liquefaction Of SoilsBy Viswanadham B. V. S., Babu K. V
Many refineries are in the process of revamping and expanding their existing facilities. Most of the refineries are located in coastal areas due to ease of transportation and storage of crude oil. Con
Sep 1, 2022
-
PMF Remediation of Oxford DamBy Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Brickworks Marketplace Ground Improvement, AdelaideBy Andrew Middleton, Mark Wyatt
"The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with
Jan 1, 1900
-
Analysis of Panel and Pile Verticality and Overlap in a Project Information Management SystemBy Jamey Rosen, Georgette Hlepas
Verticality data collected from panel and pile elements of seepage barrier walls describe the shape and position of those elements in three dimensions. These data are used to determine if a barrier wa
Sep 8, 2021
-
Digitalization in Reverse Circulation Drill RigsBy N. Schmitz
This paper explains how new digital solutions improve reverse circulation drilling operations. Upgrading field-proven reverse circulation drilling (RCD) rigs with new digital technologies enables sem
Sep 8, 2021
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Determination Of Pile Spring In Stratified LayersBy Sandeep Pattnaik
Spring stiffness of soil and rock at different depth is often required for a pile structural model. If the pile is rested in multiple layers of soil, then it is rather more complex to simulate the soi
Nov 1, 2022
-
Deep Excavation By Controlled Rock Blasting Considering Ground Condition And Nearby Structures In Ug Metro Station – A Case StudyBy P. K. Ray, Sudip Kumar Koley, Sainath M. Reddy, Devulapalli L. S Rasagna
Bangalore Metro Rail Project- phase II is one of the technological challenging project, particularly construction of underground metro rail system. The Bengaluru city is very congested area and connec
Sep 1, 2022
-
Seismic Stability Analysis of Seepage Control Measures for Levees in Central Valley, CaliforniaBy Zia Zafir
"Levees in the central valley of California are primarily for flood control purposes and thus are subjected to infrequent hydraulic loading. The primary concern for these levees is their instability d
Jan 1, 2016
-
Dynamic Pile Testing for the Five Mates BridgeBy Jonathan G. Cannon
"This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and henc
Jan 1, 1900
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
New Developments of Jacked PilesBy Victor Li, Joley Lam
"INTRODUCTIONJacked piles are piles that are pressed into the ground, usually by hydraulic jacks. For this reason, jacked piles are also known as pressed in piles. Jacked piles are mainly used for the
Jan 1, 2004
-
Inference in the Detection of Pile Integrity Defects Using Current Quality Control MethodsBy T. Wulleman, M. Ansriou
Integrity testing is a primary quality control check on a product that is for the most part not accessible to visual examination. Their cost can be expensive when using direct methods of inspection (l
Jan 1, 2019
-
Finite Element Aided Design Method for Frozen Earth Shaft SupportBy Joseph A. Sopko
The first documented procedures for designing frozen earth structures are over 50 years old, implemented long before the introduction of the Finite Element Method (FEM). Since that time, the developme
Jan 1, 2019
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of