Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
[Halliburton / Brown & Root Report] - Brown & Root Civil - GeoJet Foundation System - I. Introduction
By Gordon] [Reavis
Halliburton Services and Brown & Root have developed a unique foundation system that blends oilfield and construction technologies to construct deep foundations which offer significant advantages acro
Jan 1, 1993
-
Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California
By Lawrence P. Goldfarb
This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg
Jan 1, 1993
-
The Influence Of RC Nonlinearity On P-Y Curves For CIDH Bridge Piers
By Leonardo Massone
The p-y method is one of the most popular methods in pile design and has been calibrated for various boundary conditions using numerical and experimental studies during recent years. Most studies on r
Jan 1, 2012
-
Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless Soils
By Mohammed Sakr
The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing
Jan 1, 2011
-
Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes
By Mathew Avery, Colby Barrett
In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou
Jan 1, 2018
-
Slope Stabilisation Of A Section Of The Thirlmere Aqueduct By The Use Of Spaced Micropiles And Permeation Grouting
By David Preece
The Thirlmere aqueduct was constructed over 110 years ago to provide water from the Lake District (in the north-west of England) to the city of Manchester some 60 miles (100 km) away. The aqueduct rem
Jan 1, 2011
-
A Case History of Intrinsic Remediation of Reactive Tailings Seepage for Questa Mine, New Mexico
By SungJe Chi
Intrinsic remediation is the effect of natural attenuation mechanisms - dilution, dispersion, sorption/precipitation and biodegradation - reducing contaminant concentrations in ground water to specifi
Jan 1, 2017
-
Foundations For The M25 Motorway Near To Heathrow Airport
By John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Foundation Design And Construction In Variable Rock
By Joel Moskowitz
A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be
Jan 1, 2002
-
Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation
By Michael Arnold, Bob Faulhaber, Joe Nichols
"Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam
Jan 1, 2017
-
Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)
By David B. Paul
"ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class
Jan 1, 2014
-
Comparative Analysis Between Traditional and EC7 Criteria Applied to the Design of Diaphragm Walls Concerning the Ultimate Limit States
By J. Matos e Silva
"Abstract The paper refers five examples of executed diaphragm walls with one to five levels of anchorages. For each example a comparison is made between the results of the design using the traditiona
Jan 1, 2014
-
World Financial Center Foundations, New York
By G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Value Engineering of Reinforcement used in Large Diameter Drilled Shafts
By Shahid Islam, Lucian Bogdan
Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu
Jan 1, 2018
-
In-Situ Permeability Testing For Cement-Bentonite Cutoff Wall ? Lessons Learned
By François G. Bernardeau
Cement-bentonite (C-B) slurry walls have been used for ground water cutoff in deep excavations, contamination containment, and other applications. Hydraulic conductivity is of great concern for cement
Jan 1, 2008
-
Construction And Instrumentation Of A Deep Foundation ? Synopsis
By Y. K. Wong
This paper describes in detail various problems concerning the construction of a pile-raft foundation supporting a 42-storey tower block. The subsurface generally consists of highly weathered sediment
Jan 1, 2010
-
Influence of Pile Geometry on the Dynamic Response of an Under-Reamed Pile
By M Muzammil, S. Mukerjee, S. Saran, M. Bharathi
"This paper presents the results of in-situ tests conducted on a set of under-reamed piles in a silty sand deposit. Three piles (i.e. vertical, vertical with one bulb and vertical with two bulbs) of d
Jan 1, 2015
-
Liquefaction Mitigation Synthesis Report
By Timothy C. Siegel
This report presents the results of a synthesis on the design and analysis of ground improvement for liquefaction mitigation. The synthesis included an industry survey concerning the practice of groun
Aug 1, 2013
-
Micropiles below Groundwater at the South Auditorium Block Site, Buffalo, NY
By Mary C. Nodine, Michael P. Walker, Paul Eggers, Donald E. Aubrecht
The CANALSIDE commercial development in Buffalo, New York serves to revitalize the former site of the Buffalo Memorial Auditorium, adjacent to Lake Erie. The Auditorium was constructed in 1940 and fou
Jan 1, 2018
-
Interlocking H-Sections For Cofferdams Resist High Pressure
By Marc Dondelinger
Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca
Jan 1, 1985