Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Characterisation and Modelling of the Behaviour of Gold-Silver Competitive Co-Adsorption in CIL/CIP Circuits

    By K. Barbetti, J. Avraamides

    "The processing of gold ores with high silver contents can provide operational challenges, such as high cyanide consumption, retardation of gold leaching and competition during adsorption stages of ca

    Jan 1, 2016

  • CIM
    Age Dating and its Geodynamic Implications for the Gangdese Porphyry Cu-Mo belt, Tibet

    By Gaoming Wang

    Outline 1. The Gangdese porphyry Cu-Mo belt 1.1 Regional geological background 1.2 Cu-Mo-bearing porphyries 1.3 Mineralization and alteration 2. Dating methods and results 2.1 Qulong porphyry 2

    May 1, 2004

  • CIM
    Management Of Liquid Radioactive Waste From Uranium Conversionat The Siberian Chemical Plant

    By I. A. Menshikh, S. A. Kotov, N. L. Shinkarkin

    All the cycle for conversion of natural and reprocessed uranium of ROSATOM’s “TVEL” Fuel Company is concentrated at the Siberian Chemical Plant. Conversion capacities are located on two sites, i.e. th

    Jan 1, 2020

  • CIM
    Sinking of Shafts in Water-Bearing Strata Characterised by Low Strength ? By Providing as an Example the 1-BZIE Shaft Sinking Project in Poland

    By Marek Mika

    This Paper has been prepared to be presented at the 23rd World Mining Congress & Expo ? Montreal 2013. It presents the idea how to carry out the shaft sinking operation, going through highly water-bea

    Aug 1, 2013

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • CIM
    Ultrasonic Processing of Materials

    By Q. Han

    Irradiation of high energy ultrasonic vibration in metals and alloys generates oscillating strain and stress fields in solids, and introduces nonlinear effects such as cavitation, acoustic streaming,

    Jan 1, 2014

  • CIM
    Trends in concentrate dewatering operations in mills of the Noranda Group

    By K. V. Konigsmann

    "Concentrate dewatering operations have a significant influence on the economics of base metal beneficiation. The expenditures f or energy and labour per tonne of product are high. The relatively low

    Jan 1, 1984

  • CIM
    Controlling sulphide dust explosions in development blasting

    By Ron Jessulat

    "IntroductionBrunswick Mining and Smelting Corp. Ltd. is a IO 500 tid base metal producer. Development is carried out by Jarvis Clark MJM-21 3-boom development jumbos, using Tamrock E400, 410 and 550

    Jan 1, 1993

  • CIM
    A future for flow-through?

    By Robert B. Parsons

    "There is a widespread concern that certain of Finance Minister Michael Wilson's Tax Reform proposals will likely lead to a significant decline in flow through funding after 1988. This does not b

    Jan 1, 1987

  • CIM
    Ecological Engineering in a Mining Context: Past Progress-Future Promise

    By Margarete Kalin

    Mine Waste Management ?Reduction of Sulphideoxidation or inhibiting weathering of rocks Geologist - broken or ground rocks Hydrologist - sources of contaminants Mining engineer - waste sites C

    May 1, 2013

  • CIM
    Development of the Drumbo Mine: A new gypsum mine in Ontario

    By R. C. Hartviksen

    "The Drumbo Mine is a new gypsum mine located at exit No. 32 of Highway 401 between Woodstock and Kitchener, Ontario. The flat-lying 6-foot (1.8-metre) bed of gypsum is near the base of the Silurian S

    Jan 1, 1983

  • CIM
    A Transportation Challenge

    By R. E. Lawless

    The transportation challenge began with the need to move millions of tons of coal annually from Western Canada to Ontario. The paper will discuss the options which were available, the final mode selec

    Jan 1, 1979

  • CIM
    Selenium and Molybdenum Removal from Key Lake Mill Process Effluent

    By Arthur Lieu

    Outline Removal mechanisms of Se and Mo in the Key Lake Bulk Neutralization circuit Bulk circuit Detail process modification in the Key Lake BN circuit Process performance after commissioning Ob

    Nov 1, 2011

  • CIM
    Analytical Model for Fully Grouted Rock Bolts with Multiple Joints

    By Debasis Deb, Ankur Narang, G. P. Raja Sekhar, Kamal C. Das

    "The stability of underground structures made (especially) in jointed rock mass is of the utmost important to designers, engineers and operators. Rock bolting is generally being practised to reinforce

    Jan 1, 2015

  • CIM
    High Voltage Electric Pulse Energy In Comminuting – Case Study on Sandvik’s Mittersile Tungsten Ore, Austria

    By H. R. Manouchehri, A. Weh

    "High voltage electric pulse comminution (SELFRAG) relies on inducing electrical breakdown that occurs when the resistivity of a dielectric is insufficient to completely block all transfer of electric

    Jan 1, 2016

  • CIM
    Inorganic constituents of coal and their impact on coal quality

    By F. Goodarzi

    "The nature and distribution of the inorganic components and the concentration of certain environmentally sensitive elements, such as, As, Sb, B, Hr, Cd, CI, F, Mo, Pb, S, and Se, or elements detrimen

    Jan 1, 1994

  • CIM
    Innovative liner support trials in underground hardrock mines

    By Chri Langille, Dougal McCreath, Samantha Espley

    "In 1993, trials of two innovative applications of liner support involving the replacement of bolts in the ground support system were undertaken at Inco mines. The first trial involved an evaluation o

    Jan 1, 1995

  • CIM
    Independent project management: total management for frontier mineral development

    By J. E. Marshall

    "The concept of employing a project management team to coordinate all aspects of the construction of a new resource development has gained wide acceptance. This team can be formed from within the staf

    Jan 1, 1980

  • CIM
    Tile catenary idler as a means of energy absorption and spillage prevention

    By Douglas G. Jay

    "Transfer points on belt conveyors have long been a source of problems for both designers and users. Conveyors are generally given a low priority in new equipment layout, thus designers are often forc

    Jan 1, 1982

  • CIM
    A blast design model using the inherent fragmentation of a rock mass

    By Brian C. Maynard

    "Blast design is becoming more and more important as industrial limitations change in regard to economical and physical restraints. Certainly there are ways to alter the nature of the blast by using d

    Jan 1, 1990