Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Assessment of In Situ Stresses at Depth Using Borehole Breakouts

    By Richard Simon

    This paper presents an ongoing study on the use of borehole breakouts to estimate in situ stresses at depth in a Canadian underground mine. Breakouts were identified using an acoustic televiewer (ATV)

    Jun 1, 2012

  • CIM
    Drilling of EM Anomalies Caused by Overburden

    By D. C. Fraser, W. J. Scott

    "Airborne electromagnetic surveys were flown during 1965 in the Moose River area of Ontario. The systems used were INPUT Mark II and the Canadian Aero Otter. Anomalies indicated by both systems were l

    Jan 1, 1973

  • CIM
    Stress Regime of the Godavari Valley Coalfield, India

    By A. Manohar Rao

    Underground mining in general and more so the coal mining is a hazardous venture as it is a struggle against nature and natural forces. The stability of roadways has a direct impact on production and

    Aug 1, 2013

  • CIM
    Development of the System for Furnace Integrity Monitoring Based on Real-Time Continuous Acoustic Emission Data Acquisition and Analysis

    By A. Saki, P. Gebski, W. Ying

    Industrial smelting furnaces are subjected to significant structural changes and deterioration caused by the conditions under which they operate. The current methods for the structural assessment of f

    Jan 1, 2011

  • CIM
    New Solutions in the Area of Belt Conveyor Elements Increasing Energy Efficiency of Mine Transportation Systems

    This paper presents the results of research aimed at proposing new solutions in the area of belt conveyor elements. Many factors, such as energy consumption costs, and operating costs of belt conveyor

    Aug 1, 2013

  • CIM
    Error Associated with the use of Triaxial Rock Strength Criteria when Assessing the Stability of Underground Openings

    By J. P. Harrison, R. Roostaei

    "In this paper we investigate the consequences of using conventional triaxial peak strength criteria in the polyaxial stress conditions that occur around the end of a long circular underground opening

    Jan 1, 2015

  • CIM
    ISO Management Standard for Energy Management - WIIFM (What's In It For Metallurgy?)

    By A. Taylor, E. Thorn Corthay, R. Storey

    In response to requests from its stakeholders, the International Standards Organisation is engaged in development of an international standard for Energy Management Systems (EnMS) which will become "I

    Jan 1, 2010

  • CIM
    Economic Recovery of Uranium from Low-Grade Pulps via Resin-In-Pulp

    By D. Auerswald, M. Kotze, V. Yahorava, T. Udayar

    Uranium can be recovered from lower grade uranium ores (<800 mg/kg U3O8), leach residues, and waste dumps cost-effectively via resin-in-pulp (RIP). Using this technology, no solid/liquid separation or

    Jan 1, 2014

  • CIM
    A New Era in Pressure Hydrometallurgy

    By Fathi Habashi

    A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the

    Jan 1, 2014

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada

    By R. S. James, S. P. Goff, A. E. Armitage

    "Abstract - Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn La

    Jan 1, 1996

  • CIM
    Lac Otelnuk Iron Project Nunavik, Québec

    By Frank Condon

    ?Location ?Background ?Drilling Program ?Mineral Resources ?Geology ?Economic Assessment ?Strategic Partner ?Located in Nunavik, Québec ?160 km northwest of Schefferville ?240 km south of K

    May 1, 2011

  • CIM
    Increase of efficiency and decrease of power consumption in SO3 recycling from the off-gas of pyrometallurgical processes

    By Y. G. Yaroshenko, V. Y. Baldin, Y. M. Gordon

    The manufacture of sulphuric acid from the off-gas of pyrometallurgical processes in the production of heavy metals is one of the common methods of effective recycling of sulfuric anhydrite. The new I

    Jan 1, 2004

  • CIM
    Well Improvement Techniques 1n the Peace River Area

    By W. Hunka

    PACIFIC PETROLEUMS, Ltd. first discovered commercial quantities of gas in the Peace River area in 1952. Development of gas wells in this area is quite ex-pensive due to low penetration rates. To impro

    Jan 1, 1958

  • CIM
    The Effect of Heat Treatments on Precipitation Behavior of Dispersoids in Al-Mg-Si-Mn Alloy

    By X. -G. Chen, K. Liu, N. Parson

    "Precipitation-strengthening 6xxx alloys are widely used for building and construction and automobile industries due to their high strength, good weldability and corrosion resistance. However, their e

    Jan 1, 2018

  • CIM
    Improving the Economics of Gold-Copper Ore Projects Using SART Technology

    By R. W. Lawrence, O. Lopez

    Many gold deposits in the world have not been developed clue to the presence of copper and other base metals which can cause metallurgical and environmental challenges clue to the formation of base me

    Jan 1, 2011

  • CIM
    Impounding Influence of Slope and Foundation to High Arch Dam

    By L. Cheng, Y. W. Pan, Y. R. Liu

    "Impounding deformation of slope and foundation is significant during and post dam construction. Reservoir impoundment is accompanied with various phenomena, including material degradation, effective

    Jan 1, 2015

  • CIM
    Research on Bionic Unit Diameter and Arrangement Affecting the Performance of Bionic Drill Bits

    By Chuan-liu Wang

    The bionic non-smooth surface has the characteristics of anti-wear, and reducing resistance. Based on bionic non-smooth surface?s characteristics, a bionic drill bit was developed. When the bionic dri

    Aug 1, 2013

  • CIM
    Rio Tinto Oyu Tolgoi Mine, Mongolia Mine Conveyance Safety Fall Arrest System for #1 Shaft

    By Andre du Preez

    Emergency Fall Arrest System Rio Tinto?s Primary Objective: ?To achieve repeatable controlled safe deceleration rates during emergency fall arrest activation (Ontario OHSA Regulations) ?Must op

    May 1, 2013

  • CIM
    Gold Mineralization in Archean Banded Iron Formation, Third Portage Lake Area, Northwest Territories, Canada (407bbb63-2364-4223-b699-c887fb23f7b7)

    By R. S. James, S. P. Goff, A. E. Armitage

    "Oxide-facies banded iron formation in the Third Portage Lake area is hosted by ultramafic and calc-alkaline volcanic rocks and related sedimentary rocks of the Archean (2.8 Ga) Woodburn Lake Group, 8

    Jan 1, 1996

  • CIM
    Development and Construction of the Antamina Surface Water Management Facilities

    By Matt Schuett

    Antamina Mine Facts • Surface Water Design Principles • Drainage Areas • SEDCAD Modeling • Impacted Runoff Collection • Clean Runoff Collection • System Flexibility • Outfall Construction

    May 1, 2004