Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Better Flowsheeting with Modern Process Mineralogy

    By Norman O. Lotter

    The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i

    Jan 1, 2011

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992

  • CIM
    The Hematite Process - New Concepts for Increased Throughput and Clean Hematite Production

    By T. C. Cheng, G. P. Demopoulos

    It is the object of this paper to discuss various options for improving the hematite process in terms of increased throughput hence lower capital cost and production of saleable quality hematite. With

    Jan 1, 2004

  • CIM
    Underground Wireless LAN Deployment at Agrium Incorporated

    By Adrian Rosen

    When one thinks of innovation and leadership in wireless communications, one would rarely consider a potash mine to be leading the way. Agrium Incorporated has proven that they are leaders and innovat

    May 1, 2006

  • CIM
    The Role of Applied Biotechnology in Decommissioning Mining Operations

    By Margarete Kalin

    "Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma

    Jan 1, 1998

  • CIM
    A Plant-Wide Control System for Flotation Level Control

    By D. G. Hulbert, J. H. Schubert, R. G. D. Henning

    "Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever

    Jan 1, 1995

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill Optimization

    By Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby

    "Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel

    Jan 1, 2004

  • CIM
    Environmental Regulation and Compliance - A Summary

    By S. W. Stogran

    "A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie

    Jan 1, 1992

  • CIM
    Low-gravity separation - Part 1

    By B. W. Clyburn

    "Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing all essential properties to provide metallurgical coal,

    Jan 1, 1985

  • CIM
    Red Dog Lead Regrind Circuit Optimization

    By Brigitte Lacouture, Yeen Shien Hwang, David Lin

    "A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote

    Jan 1, 2005

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    St. Andrew Goldfields

    By P. Massi

    "Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d

    Jan 1, 1992

  • CIM
    New Developments in Process Mineralogy of Platinum-Bearing Ores

    By Louis J. Cabri

    "Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum

    Jan 1, 2004

  • CIM
    Metallurgical Testing of Gold Ores

    By T. Salman

    Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)

    Jan 1, 1975

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Lake Sediment: A Medium for Regional Geochemical Exploration of the Canadian Shield

    By R. J. Allan

    "CANADA HAS A GREATER LAKE AREA than any other country. Discountin the Great Lakes, this fresh-water area, mainly in the Canadian Shield, is listed as approximately 300,000 sq. mi. Densities of lakes

    Jan 1, 1971

  • CIM
    Recommended Practices for Application, Installation and Calibration of a Weightometer

    By D. G. MacBeth

    Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the

    Jan 1, 1975

  • CIM
    Energy Savings and Improved Recovery with Small Grinding Media

    By Michel Brissette

    "To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th

    Jan 1, 2009