Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Better Flowsheeting with Modern Process MineralogyBy Norman O. Lotter
The problem of quantifying the full performance potential of an ore body in a concentrator, and how to configure a flowsheet to achieve that potential, either for a new operation or an existing one, i
Jan 1, 2011
-
Optimization and Increasing Throughput at JacobinaBy Alexandra Kozak, Rodrigo Costa, Bob Fukuhara
"The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje
Jan 1, 2008
-
UNIMAX SD100 Depressant - A Cyanide ReplacementBy T. Schmidt, J. Merza
"This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse
Jan 1, 1992
-
The Hematite Process - New Concepts for Increased Throughput and Clean Hematite ProductionBy T. C. Cheng, G. P. Demopoulos
It is the object of this paper to discuss various options for improving the hematite process in terms of increased throughput hence lower capital cost and production of saleable quality hematite. With
Jan 1, 2004
-
Underground Wireless LAN Deployment at Agrium IncorporatedBy Adrian Rosen
When one thinks of innovation and leadership in wireless communications, one would rarely consider a potash mine to be leading the way. Agrium Incorporated has proven that they are leaders and innovat
May 1, 2006
-
The Role of Applied Biotechnology in Decommissioning Mining OperationsBy Margarete Kalin
"Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma
Jan 1, 1998
-
A Plant-Wide Control System for Flotation Level ControlBy D. G. Hulbert, J. H. Schubert, R. G. D. Henning
"Froth depth, along with reagent addition and aeration rate, is one of the crucial factors that can be used to control a flotation circuit. Sub-optimal setpoints and disruptions in levels have a sever
Jan 1, 1995
-
Meeting Recruiting Challenges - Victor ProjectProject Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;
May 1, 2006
-
Geometallurgical Modeling - The New Approach to Plant Design and Production Forecasting/Planning, and Mine/Mill OptimizationBy Dave Bulled, Chris Bennett, Glenn Kosick, Glenn Dobby
"Mining companies around the world are embracing geometallurgical modeling at a rapid rate, as senior executives realize that inputs must be properly measured if the output is to be managed effectivel
Jan 1, 2004
-
Environmental Regulation and Compliance - A SummaryBy S. W. Stogran
"A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie
Jan 1, 1992
-
Low-gravity separation - Part 1By B. W. Clyburn
"Coals from the Corporation's Lingan and No. 26 mines are classified as high-volatile A bituminous, with a very low inherent ash and containing all essential properties to provide metallurgical coal,
Jan 1, 1985
-
Red Dog Lead Regrind Circuit OptimizationBy Brigitte Lacouture, Yeen Shien Hwang, David Lin
"A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote
Jan 1, 2005
-
Backfill Practice at Copper Cliff North Mine (CCNM)By Ike Isagon
Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi
May 1, 2011
-
St. Andrew GoldfieldsBy P. Massi
"Wholly owned by the Coniagas Mining Company, the oldest continuously listed mining company on the Toronto Stock Exchange, St. Andrew Goldfields is located on Hwy. 101 approximately 30 miles east of d
Jan 1, 1992
-
New Developments in Process Mineralogy of Platinum-Bearing OresBy Louis J. Cabri
"Mineralogical evaluation of ores containing platinum-group elements (PGE) is fraught with difficulties because of the low grades (often 1-3 g/t PGE), dispersal of PGE (usually as finegrained platinum
Jan 1, 2004
-
Metallurgical Testing of Gold OresBy T. Salman
Most authorities agree that the dissolution of gold from an ore takes place according to the Elsner equation first stated in 1846. The main requirements for the dissolution reaction to proceed are:(1)
Jan 1, 1975
-
Ore Handling for the McArthur River and Cigar Lake ProjectsBy Chuck Edwards
"The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec
Jan 1, 1997
-
Lake Sediment: A Medium for Regional Geochemical Exploration of the Canadian ShieldBy R. J. Allan
"CANADA HAS A GREATER LAKE AREA than any other country. Discountin the Great Lakes, this fresh-water area, mainly in the Canadian Shield, is listed as approximately 300,000 sq. mi. Densities of lakes
Jan 1, 1971
-
Recommended Practices for Application, Installation and Calibration of a WeightometerBy D. G. MacBeth
Most belt scales on the market are factory calibrated to minimum accuracy figures of 0.1% - 0.2% at several load points. However, if the same belt scale is not properly installed and maintained on the
Jan 1, 1975
-
Energy Savings and Improved Recovery with Small Grinding MediaBy Michel Brissette
"To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th
Jan 1, 2009