Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Block Modelling and Structural Geology: Their Intergration

    By Hall C. E, Chrisholm J. M

    Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the minera

    Jan 1, 1993

  • AUSIMM
    Ventilation Planning Study of the El Teniente Block Caving Mine in Chile

    By McPherson M. J

    This paper describes a major ventilation study for the expansion of the El Teniente mine operated by Codelco, Chile. El Teniente is one of the world's largest under- ground mines. The design e

    Jan 1, 1988

  • AUSIMM
    History of Mining and Metallurgy Along the Pacific Rim

    By Lacy JC

    Human habitation of the Pacific Rim began when mankind began migrations out of its place of origin in the Rift Valley of Central Africa c. 4million years ago. This migration was erratic and largely co

    Jan 1, 1990

  • AUSIMM
    Advanced Modelling for Flotation Process Simulation

    By W T. Pate, A V. Potapov, J K. Lichter

    Even though flotation is one of the most important unit operations of mineral processing, accurate modelling of this process for plant performance prediction has remained elusive. In the last four to

    Jan 1, 2005

  • AUSIMM
    Composition of Fluid Inclusions from the Hellyer and Mt. Chalmers VHMS Deposits, Australia: Implications for Source of Ore-Forming Fluids

    By Ryan CG, Both RA, Mernagh TP, Large RR, Hunns SR, Gemmell JB

    The Hellyer and Mt. Chalmers deposits are mound-style volcanic-hosted massive sulphide (VHMS) deposits in Australia. Textural, petrographic and microthermometric investigations of fluid inclusions in

    Jan 1, 1995

  • AUSIMM
    Paper No. 188. A Graphic Method of Computing Mine Values.

    THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having

    Jan 1, 1911

  • AUSIMM
    Blast Driven Mine Optimisation

    By Little T. N, Bettess D

    For many mining operations the challenge of equalling World Best Practices has become the key motivator for increasing mine productivities and for lowering total costs. In most instances this will o

    Jan 1, 1995

  • AUSIMM
    Characterizing Multiple Operating Points in Mine Ventilation Systems

    By Mutmansky J. M, Hartman H. L

    Multiple operating points for mine fans are a problem that fan and mining engineers must constantly be aware of in mine/fan systems. In a single-fan system, unstable conditions can be avoided by r

    Jan 1, 1988

  • AUSIMM
    CO<sub>2</sub> Geosequestration ù The Challenges of Capturing and Storing CO<sub>2</sub> From the Process Industries

    By B Hooper

    Deep cuts in CO2 emissions will be required to stabilise and, in the long term, decrease CO2 concentrations in the atmosphere. Technologies for capturing CO2 from major stationary sources (power stati

    Jan 1, 2004

  • AUSIMM
    Research and Development in the Micron Research (W. A.) Solvent Procedure for Gold Elution from Carbon

    By Hinchliffe WD, Griffin A

    The desorption of gold from activated carbon is promoted by adding organic solvents to aqueous cyanide solutions. At 65-80¦ the elution of gold is fast and is not affected by water quality. The Micron

    Jan 1, 1984

  • AUSIMM
    Gold Deposits of Victoria: A Major Province within a Palaeozoic Sedimentary Succession

    The Palaeozoic succession of Victoria contains one of the world&apos;s major gold provinces with a total production of 2500 tonnes of gold. Larger deposits, including Bendigo (over 800 tonnes Au), a

    Jan 1, 1991

  • AUSIMM
    Cave Mining - State-of-the-Art

    Caving is the lowest cost underground mining method, provided that drawpoint spacing, drawpoint size and ore handling facilities are designed to suit the caved material and that the drawpoint horizo

    Jan 1, 1995

  • AUSIMM
    Process Information Management System at Mount Isa

    The implementation of a process information management system (PIMS) is to provide a single online, real-time information system. This system provides a unique and completely open view for everyone, b

    Jan 1, 2005

  • AUSIMM
    The Geology of the Mesel Sediment-Hosted Gold Deposit, North Sulawesi, Indonesia (29cafc7f-df45-41c9-a3e9-70dac885efa7)

    By Lauricella P. F, Hendri D

    In the Mesel sediment-hosted disseminated gold deposit, the spatial distribution of hydrothermal alteration is controlled by steeply dipping faults and shallowly dipping lithologies. Hydrothermal alt

    Jan 1, 1995

  • AUSIMM
    Uncovering the Mineral Wealth of New South Wales - The Discovery 2000 Initiative

    In July 1994 the Premier, John Fahey MP, announced that the New South Wales Government would make available a total of $40 million over six years in new funding for the Department of Mineral Resour

    Jan 1, 1995

  • AUSIMM
    Qualitative and Quantitative Evaluation of Iron Ore Sinters Through Digital Microscopy

    By S Paciornik, G Schinazi, M H. de Pinho Maur-cio, M B. Vieira, O da Fonseca Martins Gomes, D T. Wagner

    Vale (previously CVRD û Companhia Vale do Rio Doce) evaluates the microstructure of sinters in order to understand their characteristics and behaviour in the agglomeration process, and the correlation

    Jan 1, 2008

  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Control Networking Aids Process Efficiency

    By Getliffe RK

    It is becoming more and more difficult to operate mineral and metal processes profitably, as operating costs rise, quality demands in-crease, international competition becomes more fierce and Governme

    Jan 1, 1985

  • AUSIMM
    Two Approaches to Truck and Shovel Mining at Leigh Creek

    By Swift D. G

    For some time the Electricity Trust of South Australia (ETSA) has been investigating the application of new mining methods and equipment to minimise the cost impact of the steadily increasing depth

    Jan 1, 1989

  • AUSIMM
    Outsource or Owner Operate

    The decision to contract or owner mine should be independent of, and should be made before, definitive estimated cost comparisons could be available. There is substantial potential risk of estimated c

    Jan 1, 2003