Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracyBy D Reid, J McKibben, M Noppe
International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo
Mar 22, 2022
-
Bulk sensing for effective ore sorting – learnings over 35 yearsBy H Kurth, L Balzan
The potential for bulk diversion was identified and quickly implemented following the development of bulk sensing technologies applied to conveyed flows. In the early 1980s real time analysis of ash i
Nov 10, 2020
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG MillBy R A. Pax, B Cornish
"Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly
Oct 10, 2016
-
Fluorine Removal From Ok Tedi Copper/Gold ConcentratesBy J W. Glatthaar, M Mavotoi
The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho
Jan 1, 2003
-
Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?OperationBy R Wynn, R A. Pax, S Mann, B Cornish
The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u
Sep 1, 2014
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
The Application of Safescape Ladders at the Cracow and Golden Grove OperationsBy B Hawkins, S Durkin, V Lawrence
The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva
Mar 24, 2014
-
Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation ObjectivesBy A A. Puhalovich
The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca
Jul 10, 2012
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Drift and Fill - The High Value, High Recovery Mining SystemBy M English, M Yumlu
At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of
Jan 1, 2008
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Optimisation of the Prominent Hill Flotation CircuitBy P Woodward, T Ly, N Muhamad
OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial
Jul 15, 2013
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
Geometallurgy in Mineral Sands Deposits – Linking Geological Artifacts to Metallurgy and Mine PlanningBy G Williams
Somewhat to the surprise of many heavy mineral sands (TiO2 and zircon) producers, there are important geological structures within their typical placers and aeolian sands deposits that affect plant me
Oct 5, 2011
-
Unique Coal Mine Drift Construction MethodBy C Donnelly
Redpath Australia is using a unique mining method for the Australian underground coal industry at Kestrel Mine Extension in the Bowen Basin, Central Queensland.The project involves completing two sepa
Mar 21, 2011
-
Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022