    Organic Management Structure – Its Advantages in a Mining Consultancy

    By G Pitkin, D Sorley

    The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga

    Jun 22, 2016

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • AUSIMM
    Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, Australia

    By A Finch, C Pridmore

    The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west

    Aug 18, 2014

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine

    By D Willis, A Shanahan, C Jacobs, T Luxner

    The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin

    Sep 17, 2014

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Improving fine sulfide mineral recovery in Independence Group’s Jaguar Mine zinc circuit

    By B Lumsden, R Smiles

    Independence Group’s Jaguar Mine treats a polymetallic ore producing a copper concentrate and zinc concentrate. Effective separation of the sulfides requires relatively fine grinding with flotation fe

    Aug 29, 2018

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper Concentrator

    By M L. Muller, A R. O’Donnell

    The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants

    Aug 29, 2018

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011