Organic Management Structure – Its Advantages in a Mining ConsultancyBy G Pitkin, D Sorley
The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga
Jun 22, 2016
-
Reducing Mining and Mineral Processing Plant Fatality RatesBy N Cann
In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali
Aug 8, 2011
-
Quantifying the quality of cable bolt installation by acoustic testingBy M Hawkes, Z Ji Gang, Z Ming, R Hassell
As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif
Mar 15, 2021
-
Improving compliance in mining through an effective geoscientific information management frameworkBy S Mundell, A Atkins, S van de Water
Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ
Nov 8, 2021
-
30 years of seismic system design, implementation and interpretationBy J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022
-
Dynamic Interpolation – Estimation in a Folded Environment at the Cosmo Deposit, Northern Territory, AustraliaBy A Finch, C Pridmore
The Cosmo Project falls within the Archaean to Palaeo-Proterozoic Pine Creek Orogen, one of the major mineral provinces of Australia.The Cosmo Deposit is interpreted to be a series of steep north-west
Aug 18, 2014
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
Tunnel Boring Machine Usage Speeds up Development at Stillwater MineBy D Willis, A Shanahan, C Jacobs, T Luxner
The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin
Sep 17, 2014
-
Mt Isa copper concentrator cleaner circuit redesignBy P Radulovic, V Lawson, M Muller, J Wallace
The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill
Sep 11, 2017
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and StructuresBy L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
Blast design and execution drives mine site profitsBy J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
Getting underground: design and construction of a portal in a pit with moving wallsBy J Player, P Evans, G Sweby
Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c
Mar 15, 2021
-
Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditionsBy S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli
The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req
Nov 8, 2021
-
The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope DesignBy A Muhairini, M Eggers, J Smith, H Baxter
Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au
Jul 13, 2015
-
Improving fine sulfide mineral recovery in Independence Group’s Jaguar Mine zinc circuitBy B Lumsden, R Smiles
Independence Group’s Jaguar Mine treats a polymetallic ore producing a copper concentrate and zinc concentrate. Effective separation of the sulfides requires relatively fine grinding with flotation fe
Aug 29, 2018
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Selectively targeting hydrophobic gangue minerals at the Mount Isa Mines Copper ConcentratorBy M L. Muller, A R. O’Donnell
The Mount Isa Mines (MIM) Copper Concentrator has an extensive history of reagent trials, with different reagents coming in and out of favour over the years. The research and use of carbon depressants
Aug 29, 2018
-
Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence"Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-
Mar 8, 2016
-
Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in MelbourneBy I Lamb
Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline
Mar 8, 2011