Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Why Reinvent the Wheel when there are Established Methodologies to Aid the Design and Assessment of Restored Natural Ecosystems on Mined Land?By R N. Humphries
The aim of this paper is to question the need to develop bespoke monitoring and assessment methodologies and criteria, thereby ‘reinventing the wheel’, when designing and assessing the success of impo
Jul 16, 2014
-
BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and FutureBy M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken
"BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to
Sep 29, 2013
-
Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and DivestmentBy A Keogh, P Allen, P Stoker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an
Mar 18, 2015
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Environmental Risk Assessment System for Typical Staple Industrial Solid WastesBy X Sun, L B. Zhou, H Yi, X Tang, P Ning
The rapid industrialisation in China has consumed large amounts of various industrial raw materials, which has left behind large quantities of industrial solid wastes produced from the processes of mi
Jul 10, 2012
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Challenges and opportunities in accelerating electrification of underground heavy haulage equipmentBy J Webb
The mining industry is relatively niche and complex compared to other global industries in its safety and operating environment. Whilst some of the technology required to decarbonise the mining indust
Mar 29, 2023
-
The critical role of mine planners in the evolution of closure at BHPBy J Heyes, R Getty, M Sanapala
Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti
Sep 18, 2023
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsBy V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil
Sep 18, 2012
-
Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley OperationsBy S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans
A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success
Mar 15, 2021
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit MiningBy M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Managing Stress and Ground Condition Changes with Increasing Depth at Callie Underground MineThe Callie Underground Gold Mine (Callie) is owned by Newmont Asia Pacific and located 531 km north-west of Alice Springs in the Northern Territory. Historically, stopes have been mined util
Nov 25, 2010
-
Thermal phosphorus – it’s a hot commodity with a hot processBy R Atmuri, W Liang, R Prasad, Y Liu, E Wingate
Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the
Aug 21, 2024
-
MEMS – The Mine Event Management System: a process to assist with incident managementBy B Stewart
It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi
Apr 16, 2024
-
Managing continuous improvement of Mine to Mill begins with measurementBy J Loeb, R Ramanathan, H Ingham, P Cameron
Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd
Nov 8, 2021
-
Optimising Mobile Equipment Resources in Massive MiningMobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The
Jan 1, 2000
-
De-bottlenecking Iron Ore Transportation from Mine to PlantBy T Tan, C P. Holmes, C E. Hartford
Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin
Jul 13, 2015
-
Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity SettingBy B P. Wrench, M J. Gowan, P J. Chapman
Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat
Jul 27, 2015
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
The evolution of the Monty Geological model and the revolution of the on-site modelling and grade control processesBy P Willems, J B. Crow, R Dale
Open pit mining commenced at Lihir Island in 1997 and is undertaken using a conventional drill, blast, load, haul methodology. Unique challenges at the operation include an active geothermal system, a
Mar 22, 2022