Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    1880 - 1930 - The Golden Years of Mineral Processing Technology

    1880 - 1930 - The Golden Years of Mineral Processing Technology

    Sep 13, 2010

  • AUSIMM
    The Use of Direct Push Methods for Delineating Spatial and Temporal Variability in Groundwater Investigations

    By P J. Clark, A W. Fisher, R G. Ford

    Site characterisation of subsurface contaminant transport is often hampered by a lack of knowledge of site heterogeneity and temporal variations in hydrogeochemistry. The use of a regional-scale data

    Jan 1, 2004

  • AUSIMM
    Childe Harold: A Case Study in the Use of Multiple Bench Grade Control Techniques

    By Stuart M. S, Allen P. B

    The Childe Harold deposit was mined by the Granny Smith Joint Venture (GSJV) from late-March through to early-December 1993. This was a fast-tracked mining project whose history began with an offer

    Jan 1, 1994

  • AUSIMM
    Floatability of Streams Around the Cominco Red Dog Lead Cleaning Circuit

    By Frew J. A, Harris M. C, Manlapig E. V

    The recovery achieved in a flotation process is a function of both the characteristics of the feed stream and the operating conditions within the flotation cell. In this paper, the flotation charact

    Jan 1, 1997

  • AUSIMM
    Utilising New Technology

    Over the longer term, the adoption of new technology is an essential component in the endless tasks of reducing mining costs, improving safety and improving environmental standards. However the cho

    Jan 1, 1997

  • AUSIMM
    Sources of External Dilution in Underground Sublevel and Bench Stoping

    This paper describes several sources of external dilution affecting the stope walls during underground sub-level and bench stoping. Factors which control ground behaviour such as the geometry of the

    Jan 1, 1995

  • AUSIMM
    Applied Designs of Rubber Mill Liners for Different Conditions and Maximum Efficiency

    There is a difference in design aspects between steel linings and rubber linings for grinding mills. The basic design rules for rub- ber are described as well as the liner designs for different appli

    Jan 1, 1978

  • AUSIMM
    Multicommodity Exploration in the Murray Basin, Victoria, Australia

    By Preston JC, Richards DJ

    A multicommodity exploration programme was mounted in the 1970s by CRA Exploration Pty. Limited over a major part of the southern Murray Basin in Victoria. Commodities sought were brown and black

    Jan 1, 1986

  • AUSIMM
    Notes on the Delayed Method of Stope Filling at Mount Isa Mines Limited

    Introduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass De

    Jan 1, 1953

  • AUSIMM
    Geological and Grade Risk at the Golden Gift and Magdala Gold Deposits Stawell, Victoria, Australia

    By M Stewart, J Vann, A Bu, D Frederickson

    The Golden Gift is a recently discovered deep deposit below the main operating areas of the Stawell Gold Mine. At an early stage of the project, diamond drilling was used to define the mineralisation

    Jan 1, 2003

  • AUSIMM
    New Celebration Tailings Treatment Plant 18 Months Later

    By Delahey G, Dunne R

    At New Celebration Gold Mine the advent of treating primary sulphide ores resulted in decreased gold recoveries of four to ten per cent. The grind coarsened due to an increase in ore hardness and go

    Jan 1, 1993

  • AUSIMM
    Coke and its Influence on Blast Furnace Aerodynamics

    By Hyslop W

    It is shown that coke has a major influence on the pattern of operation and on the aerodynamics of the blast furnace and that the physical and chemical characteristics of coke, at each stage in the f

    Jan 1, 1975

  • AUSIMM
    Blast Vibration Control and Assessment Techniques

    By Moore A. J, Evans R

    Blast vibration control and assessment techniques have been developed which supplement traditional charge mass scaling methods. The improved techniques, which can be used to predict air and ground v

    Jan 1, 1994

  • AUSIMM
    Eco-Development and Mining in the 21st Century Near Delhi, India

    By Verma UK

    Mining for sand was active in South Delhi during the last four decades disregarding all norms of safety. The aim of the paper is to highlight what is proposed to be done for mining in Delhi. Apar

    Jan 1, 1986

  • AUSIMM
    The Impact of Landslides on the National Highway System in the Highlands Region

    The Highlands Region of Papua New Guinea has 3 major national highways. The locations of these national highways are shown in Figure 1. The Highlands Highway begins at Lae City on the coast and pas

    Jan 1, 1997

  • AUSIMM
    Mine Design with Special Reference to Shaft Pillars at Great Depths

    The paper poses certain questions relating to mine design aspects of deep shaft pillars. It then explores these questions in relation to Western Deep Levels (South) where a sub-shaft system is to

    Jan 1, 1986

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    Prediction of Precious Metal Heap Leach Behavior by use of Unsteady State Models

    By Hendrix J. L, Nelson J. H

    A model based on non-steady state has been developed for dissolution and diffusion in porous ore particles. Results from the particular model have been incorporated, as a rate term, into a global, h

    Jan 1, 1991

  • AUSIMM
    Sulfide Flotation at the Renison Tin Concentrator, Tasmania

    By Grano S. R, Kilgariff B

    The Renisun Tin concentrator treats an ore containing I's per cent till as cassiterite and 22 per cent sulphur in a range of sulphide minerals. predominantly pyrrhotite. The sulphide minerals a

    Jan 1, 1997

  • AUSIMM
    Grade Control for Gold Mining at Mt Magnet, Reedy, Rothsay and Youanmi in the Murchison District, W A

    In open cut gold mining at Mt Magnet and Reedy, grade control sampling is done with inclined RC drilling using one metre samples. In the small open cuts at Rothsay blasthole sampling was successfully

    Jan 1, 1990