Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Predicting Iron Ore Losses and Dilution Factors Using Conditional Simulations

    By D Roldpo, M Vidigal, J F. C L Costa

    The local cumulative distribution function (lcdf) of a selective mine unit (SMU) can be estimated by conditional simulations using the statistics derived from the sample points, generating multiple eq

    Jan 1, 2009

  • AUSIMM
    Iron ore tailings and value addition – a short review

    By G Senanayake, K Hazarika

    The demand for iron-ore is ever increasing with the industry directly employing 60 500 people in a range of highly skilled roles in Australia. In the year 2019, the global iron-ore production was 2.85

    Nov 8, 2021

  • AUSIMM
    Lessons for the safe implementation of automation in mining

    By R Burgess-Limerick, J Haight

    A review of mining automation experiences was undertaken on behalf of the National Institute for Occupational Safety and Health (NIOSH). The research included a review of literature and guidance mater

    Apr 16, 2024

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Applying Modular Transporters to Relocate Large Hydraulic Excavators

    By B Flynn, P Knights

    Low-loaders or 'floats' for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex

    Jan 1, 2009

  • AUSIMM
    Heat Load Estimation from Conveyor Systems in Mass Mines

    By R Moreby, J Kok, L van den Berg

    The high production rates achieved from mass mining methods such as block caving, sublevel caving and longwall mining require large conveyor belts, trucking loops (diesel/electrical) and rail systems

    Aug 31, 2015

  • AUSIMM
    Climate Related Adaptation from Terrain Evaluation Results (CRATER) - Interpretation of Pre-existing Data for Mine Site Flood Vulnerability and Management

    By M Grigorescu, J H. Hodgkinson, H Alehossein

    A new framework that collates and interprets pre-existing data to assess vulnerability and ultimately plan to avoid or minimise flood-related risk to infrastructure, people, downtime, environment and

    Nov 26, 2013

  • AUSIMM
    Metallugical Plant ù Have We Run Out of Developments?

    I have headed this paper with a question and for the impatient among you ûthe answer is no we have not run out of developments but, and it is a big æbutÆ, we need to be innovative and ahead of the gam

    Jan 1, 2002

  • AUSIMM
    Treasure Islands - Second Edition

    The Pacific Rim countries ofAustralia, New Zealand, Papua New Guinea, Indonesia, Fiji, Philippines and Solomon Islands will be reviewed from an equity investors perspective.   The following areas

    Jan 1, 1995

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore Substrate

    By S Hapugoda, J R. Manuel, M P. Ma, L Lu

    Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia

    Aug 12, 2013

  • AUSIMM
    The Fantastic Learning Experience that was the 2005 Atlas Copco Travel Scholarship

    This paper gives a first-hand account of what a graduate mining engineer can learn by visiting Atlas Copco in Sweden and gives reasons why all mining engineering students should apply for this excelle

    Jan 1, 2006

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    Paste Backfill for Enterprise Mine

    By D Morrison, P Goodman

    The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur

    Jan 1, 1998

  • AUSIMM
    Platinum Mining and Sustainability - Understanding the Environmental Costs of Future Technologies

    By G M. Mudd

    The growing popularity of platinum and platinum group metals (or PGMs, including palladium, rhodium and others) for a wide range of applications leads to some interesting issues for mining and sustain

    Jan 1, 2009

  • AUSIMM
    Use of Geometallurgy to Predict Tailings Leach Acid Consumption at Olympic Dam

    By E Macmillan

    For any processing plant there will be deleterious elements or minerals which affect production or quality, and a strategy to predict their occurrence and mitigate their impact is required. An early o

    Sep 5, 2011

  • AUSIMM
    Evaluation of a Single-Layer Desulfurised Tailings Cover

    By G W. Wilson, M Aubertin

    A desulfurised tailings cover was installed at the Detour Lake Mine in Ontario, Canada, to reduce oxygen penetration into the underlying sulfidic tailings. The cover ranges from one to 1.5 m in thickn

    Jan 1, 2003

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021

  • AUSIMM
    Spatial Modelling and Optimisation of Geometallurgical Indices

    By M J. Newton

    As part of the AMIRA P843 project Keeney and Walters (2008) describe how the principal components analysis (PCA) method can be used to identify classes of samples with similar metallurgical characteri

    Sep 5, 2011