Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Macraes Gold Mine Implementation of a Zero Accident Programme

    The theme of this conference is æRediscover OtagoÆ and the conference occurs during a resurgence of economic activity in New Zealand, and in particular at a time when the Macraes Gold Project has had

    Jan 1, 1992

  • AUSIMM
    Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia

    By H Firdausi, I Pasek, T Chenier

    The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start produ

    May 9, 2016

  • AUSIMM
    Mining and the Resource Management Act 1991: Is the Playing Field Level?

    By A P. Brown

    Comparison of legal permits required for mining (as opposed to prospecting or exploration) inNew Zealand, under the Mining Act 1971 and the Resource Management Act/Crown Minerals Act 1991. Mining gene

    Jan 1, 1995

  • AUSIMM
    Fault and Shear Characterisation in Archean Banded Iron Formation Bedrock - A Comparison between Core and Televiewer Data Collection Techniques

    By M Eggers, H Baxter

    This paper discusses the geotechnical condition of bedding shears and small- and large-scale faults and shears in Archean banded iron formation (BIF) bedrock, based on observations of core and televie

    Aug 12, 2013

  • AUSIMM
    Understanding Epithermal Ore Deposits from New Zealand Geothermal Systems

    By P R. L Browne

    Study of geothermal systems in the Taupo Volcanic Zone (TVZ) has significantly advanced our understanding of the processes of epithermal mineralisation. The three main lessons learnt are:

    Jan 1, 1997

  • AUSIMM
    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Sep 13, 2010

  • AUSIMM
    Development and Economic Application of Knelson Concentrators in Low Grade Alluvial Gold Deposits

    By R Edwards

    Greater efficiency of capture of minus 6 mm to fine micron size particles of free gold is achieved with the Knelson Concentrator. The development, principles of operation and recent innovations relati

    Jan 1, 1990

  • AUSIMM
    Effect of Temperature on Removal of Phosphorus from Australian Goethitic Iron Ores

    By B M. Washington, R R. Lovel, G J. Sparrow, M J. Fisher-White

    "Work in CSIRO with several Australian ores has shown that?by heating a high-phosphorus goethitic iron ore and then leaching with caustic or acid, the phosphorus levels in the ore can be lowered to a

    Aug 12, 2013

  • AUSIMM
    Background Geochemistry Downstream from Mines: USA Case Studies and NZ Significance

    Background geochemistry of streams in mineralised terranes is affected by (a) natural sulphide oxidation and associated metallic discharges; and (b) previous mining history and associated discharges.

    Jan 1, 1999

  • AUSIMM
    Development of the All-Flotation Process at Zinc Corporation Limited, Broken Hill

    The ore milled from the Lead Lode of The Zinc Corporation leases consists of a fairly granular mixture of galena, marmatite, chalcopyrite, tetrahedrite, pyrrhotite, pyrite, and lollingite with a gangu

    Jan 1, 1941

  • AUSIMM
    The Importance of Mineral Processing Technology for Establishing a Sustainable Society with an Environmentally-Sound Material Cycle

    For establishing sustainable material cycle process in human system, a brand new concept should be created, which could recycle the waste materials, which are land-filled and discarded under present e

    Sep 13, 2010

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • AUSIMM
    Pressing-Drill Method - A Representative Method for Taking Analysis Samples from Recycled Materials

    Pressing-Drill Method - A Representative Method for Taking Analysis Samples from Recycled Materials

    Sep 13, 2010

  • AUSIMM
    U-Th Isotopes and the Generation of Magmas along Destructive Plate Margins

    By E Heath, F McDermott, S Turner, P van Calsteren

    U-Th isotope studies of recent volcanic rocks may be used to evaluate the depths and rates of melt generation beneath midocean ridges and ocean islands. Island arc rocks exhibit a similar range in Th

    Jan 1, 1995

  • AUSIMM
    Development of an On-Site Mineralogy Solution for Metallurgists

    By D van der Wal, R Dobbe, K Moeller

    "Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s

    Jul 15, 2013

  • AUSIMM
    The Extraction of Metals from Geothermal Fluids

    Spectrum Resources commenced operations as a public listed mining company in August, 1983, with a variety of precious metal projects in New Zealand. At that time the outlook for most mineral commoditi

    Jan 1, 1986

  • AUSIMM
    Managing Stress and Seismicity in an Inclined Sublevel Cave

    By K A. Bunker, A D. Campbell, E Ah Mu, A R. Penney

    The Ernest Henry mine is a transverse sublevel cave (SLC), which is relatively unique due to the 45 degree inclination of the orebody. To economically recover ore, each sublevel is horizontally offset

    May 9, 2016

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    Results from Physical Models of Block Caving

    By D Cumming-Potvin, S W. Jacobsz and E Kearsley, J Wesseloo

    This paper describes a physical modelling program that recreated block cave propagation in a geotechnical centrifuge. A brief description of the design of the test along with the sample material and m

    May 9, 2016

  • AUSIMM
    Advances in the New Zealand Coal Industry

    By T King

    This paper reviews the changes in the coal industry over the past 30 years and attempts to predict the trends over the next ten years. The last 30 years have seen a steady concentration of production

    Jan 1, 1997