Search Documents

  • CIM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimization on a Milling Circuit

    "In mining operations, it is widely accepted that strategies to drive operational goals must revolve around improving plant availability, reliability and process efficiency. In this paper, an integrat

    Jan 1, 2014

  • DFI
    Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes

    By Mathew Avery, Colby Barrett

    In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou

    Jan 1, 2018

  • DFI
    Dynamic Testing For Bored Pile Bearing Capacity - Summary

    By Jörn M. Seitz

    Dynamic load testing is employed with ever increasing frequency to estimate the strength and elastic settlement behavior of piles of all types. For dynamic loading ram masses up to 20 Mg have been use

    Jan 1, 1987

  • NIOSH
    IC 6871 How To Use Permissible Explosives Properly - Introduction

    By D. Harrington

    Probably over 95 percent of the coal production of the United States depends upon the use of explosives before it can be placed in the railroad car at the mine, and up to the present time it has been

    Jan 1, 1936

  • AUSIMM
    Understanding Damage Source Mechanisms in a Caving System Using Virtual Reality Scientific Visualisation

    By B K. Hebblewhite, F T. Suorineni, J D. Tibbett

    Block caving is an underground mining method that can provide high production capacities at low operating costs. This enables the profitable extraction of massive, low-grade orebodies and attracts ind

    May 9, 2016

  • RMCMI
    The Kyoto Protocol: What It Means To You!

    By Constance Holmes

    President Lien presented Mrs. Holmes with the first of speaker appreciation gifts presented by his firm Amax Coal West, Inc. These were books by Rand-McNally entitled The Executive Golfer Guide. F

    Jan 1, 1998

  • SAIMM
    On the Reduction of Algorithmic Smoothing of Kriged Estimates

    Utilizing a very large database from a mined-out area on a South African gold mine, the relative efficacy of a method to mitigate the smoothing effect introduced by the algorithmic constraints imposed

    Jan 1, 2014

  • SME
    Issues Impacting Coal Ash Utilization – Preprint 97-114

    By D. Dodgen, L. Larrimore

    Electric utilities depend heavily on coal as a major fuel source for power generation, annually producing more than 85 million tom of ash, boiler slag and FGD (flue gas desulfurization - "scrubber") m

    Feb 24, 1997

  • AUSIMM
    Optimum scale of an open pit operation: discount rate and risk

    For a large scale open pit mining and concentrating operation, on a low-grade disseminated ore body, it is possible to set an approximate lower bound on economically feasible operating scales and an a

    Jan 1, 1986

  • AIME
    Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood

    By B. H. Caudle, L. G. Loncarie

    Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar

  • IOM3
    Hydraulic sorting of co-disposed coarse and fine coal wastes

    By P. H. Morris

    Nineteen field trials of the co-disposal of fine coal tailings and coarse coal wastes were conducted at the dual Goonyella-Riverside mine in Queensland and at the Hunter Valley No. 1 and Warkworth min

    Jun 19, 1905

  • CIM
    The Past 70 Years of Flash Smelting

    By M. Lahtinen, P. Latostenmaa, I. Kojo, E. Peuraniemi, M. Lindgren, S. Jyrkönen, M. Jåfs

    The year 2019 marks the 70th anniversary of Flash Smelting. The technology was operated on industrial scale for the first time at the Outokumpu Harjavalta copper smelter in Finland in 1949. Since then

    Jan 1, 2019

  • SAIMM
    Mechanical Behaviour of Surrounding Rock Mass and New Lining Structure of Air-tight Pressure Cavern

    By M .. Hori, H. Onishi, Y. Goda

    The split-lining structure was newly developed for the air-tight lining of the underground compressed air storage cavern. This structure consists of separated reinforced concrete (RC) segments and air

    Jan 1, 2003

  • NIOSH
    Three-dimensional time-lapse velocity tomography of an underground longwall panel

    By Kray Luxbacher, Mario Karfakis, Erik Westman, Peter Swanson

    Three-dimensional velocity tomograms were generated to image the stress redistribution around an underground coal longwall panel to produce a better understanding of the mechanisms that lead to ground

  • AUSIMM
    The Hydraulic Transportation of Sands

    Factors leading to the necessity for some individual testwork in solving most specific hydraulic transportation problems are listed and a description is given of a method used in determining critical

    Jan 1, 1959

  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • AIME
    Minerals Beneficiation - Exothermic Hardening of Cu-Ni Sulfide Agglomerates

    By F. Petkovich, M. P. Sudbury

    Development of a new method of treating flotation concentrates for the preparation of feed suitable for direct charging to blast furnaces or converters is described. The method takes advantage of the

    Jan 1, 1961

  • SME
    Subsidence Potential In The Eastern Kentucky Coal Field

    By C. A. Johnson, K. F. Unrug

    The identification of the major subsidence areas in the Eastern Kentucky Coal Field has been made to distinguish the subsidence phenomena on the basis of geographical location. Further, this identific

    Jan 1, 1986

  • CIM
    World’s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation (26e1b765-3ec1-447d-8206-6ab79dbb100f)

    By Rajiv Kalra, Ji Jiangang

    "This paper reviews the following aspects of the world’s largest manufactured Grinding Mill’s in terms of diameter and power, along with the world’s biggest shop assembly and trial run of the mills de

    Jan 1, 2012

  • AUSIMM
    Normal Fault Hosted Quartz-Scheelite Lodes and Associated Vein Swarm, Glenorchy, NW Otago

    Lower greenschist quartzo-feldspathic schists within the N-S trending Earnslaw Synform of the Upper Wakatipu area are pervaded by late-stage quartz filled extensional and extensional shear fractures,

    Jan 1, 2001