Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Applications of seismic hazard assessment methods in mines
By G. van Aswegen
Large structures in mines (faults, dykes, pillars, abutments) fail when the load exceeds the strength. If the loading system stiffness (LSS, also referred to as the ‘local mine stiffness’) is lower th
Jan 1, 2003
-
The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales
The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of
Jan 1, 1930
-
The application of underground support liners reaches maturity
By I. Hague
Support liners for underground applications include steel and timber sets, meshing and lacing, screen/mesh, shotcrete and thin support liners (superskins). Over the past few years, major advances have
Jan 1, 2003
-
A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia
By R. B. Alke
Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o
Jan 1, 1984
-
Investigations for a New Flowsheet and Plant at Wattle Gully Gold Mines N.L.
By Woodcock J. T, Jackson N
Wattle Gully Gold Mines N.L. of Chewton, Victoria, has decided to replace its present battery plant by a new mill to treat a free milling gold ore, after fine grinding, by concentrating coarse gold in
Jan 1, 1959
-
Development of a slimhole downhole nuclear magnetic resonance tool for iron ore – some applications and limitations
By T A. J Hopper, B J. Birt, K K. Trofimczyk
Nuclear magnetic resonance (NMR) has been utilised in the oil and gas industry for over 60 years. The technology was recently identified as having potential value in iron ore, where latent bound moist
Jul 24, 2017
-
The San Cristobal Gold District, Antofagasta, Chile
By S Kasaneva
TheSan Cristobal gold district is located 110 km east of the port of Antofagasta, Chile. It contains the San Cristobal gold mine, where Niugini Mining Ltd. commenced a heap leach operation, with initi
Jan 1, 1995
-
Mining - Basic Considerations for Long-Distance Solids Pipelines in the Mineral Industries (MINING ENGINEERING. 1961, vol. 13. No. 8. p. 976)
By R. Costantini
The author discusses the promising future of the use of pipelines for transportation of ore slurries over long distances, citing existing installations. Various criteria and factors affecting the use
Jan 1, 1961
-
New Ideas on Gippsland Basin Regional Tectonics
By Colwell J. B, Constantine A. E
A unique, regional grid of deep (12 - 14 second record length), seismic reflection and refraction data has been recorded by the Australian Bureau of Mineral Resources (BMR) across the offshore Gipps
Jan 1, 1992
-
Cadia Hill Gold Mine ù One Year Down the Track
By Cadia Geology Team
The Cadia Hill Gold Mine, located near Orange in Central Western New South Wales, is owned and operated by Cadia Holdings Pty Ltd, a wholly owned subsidiary of Newcrest Mining Limited. Construction in
Jan 1, 2000
-
Improving Cooling Tower Performance with Innovative Horizontal Outflow Design
By T Hirsi, M Weatherseed, T Ritasalo
Cooling tower design has not advanced significantly in the last decade. Recognising this, Outotec has developed an innovative horizontal outflow cooling tower with increased performance compared to co
Sep 7, 2015
-
The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes Process
WHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi
Jan 1, 1925
-
Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue
By D Craw
Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing
Jan 1, 2000
-
OFR-94-78 Development Of Noise Control For Secondary And Tertiary Crushers In Surface Non-Coal Mining Plants And Mills
By G. Boehler
The purpose of this program is to demonstrate the feasibility and practicality of noise control for secondary and tertiary crushers in surface non-coal mining plants and mills. It is a part of the bro
Jan 1, 1977
-
Disturbance Assessment at the Wall of a Vertical Blasted Shaft in Marls
By J. P. Piguet, Y. Wileveau
ABSTRACT : An experimental programme for damage assessment was performed in the vicinity of the main shaft of Andra’s Underground Research Laboratory, currently under construction in the East of Franc
Jan 1, 2003
-
Hydrologic and Environmental Changes in the Gippsland Basin
The Gippsland Basin, southeastern Australia, has an Upper Cainozoic history of episodic change of hydrology and the related environment, reflected in the geomorphology and surficial deposits of the
Jan 1, 1992
-
Aspects of Mining at Ok Tedi
By Zwaan J, Kepa J
Ok Tedi mine has become one of the major copper producers in the world. In the process of becoming of age, it overcame the challenges of operating in a locality which is young in geological terms,
Jan 1, 1991
-
RI 4064 Metallurgical Research Program of Bureau of Mines Relating to the Nonferrous Metals
By S. S. Dean, B. Silkes
"INTRODUCTION The metallurgical-research program of the Bureau of Mines .for the past 15 years has emphasized the production of high-purity nonferreus metals through the utilization of our available r
May 1, 1947
-
Long Rockbolt Support at New Broken Hill Consolidated Limited
Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working
Jan 1, 1974
-
Guidelines of Overburden Casting
Since the ecrly 1970's several factcrs have changed. In the East the larger tracts of coal mined with large eauipment are being dePleted, The cost of moving the larger equipment from small tract to s
Jan 1, 1989