Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • TMS
    Analysis of the Welded 100-Meter Heavy Rails for Passenger Dedicated Lines Being Broken during the Straightening Process

    By Min Zhu, Yu Ji, An-chao Ren

    "After being welded in the weld plant, the 100-meter heavy rails with the specification of 60kg/m are found broken during the straightening process in four planes. Failure analysis is made using the o

    Jan 1, 2013

  • TMS
    Use Of Alternating Current For Leaching Of Intermediate Products From Copper And Nickel Production

    By A. V. Tarasov

    In order to improve technical, economic and environmental performance of hydrometallurgical processing of intermediate products containing copper and nickel, the Gintsvetmet Institute and the IMET Ins

    Jan 1, 2003

  • TMS
    Practical Applications of Microscopy in Mineral Processing

    By Robert B. Haagensen

    While light optical microscopy has long been employed by the mineral processing industry, there has been a tendency to shy away from its use for all but the most exacting purposes. Despite the usefuln

    Jan 1, 1981

  • TMS
    Acidic Leaching Of Turkish Lateritic Nickel Ore

    By Fatma Arslan

    The lateritic nickel ore sample subjected to this experimental study was taken from Çalda ore deposit (Turkey) and contains 1.43% Ni and 0.105% Co. Mineralogical investigations showed that the ore sam

    Jan 1, 2006

  • TMS
    Preparation Of Porous Ceramic Pellets By Multiphase Double Emulsion Method

    By Chai Liyuan

    This paper focused on the preparation of porous ceramic pellets for microorganism carriers. A new method for the process was developed using simple gel-casting and bubble-in-water-in-oil type of multi

    Jan 1, 2006

  • TMS
    Copper Extraction From Smelter Flue Dust By Lime-Roast/Ammoniacal Heap Leaching (College of Mines and Earth Resources University of Idaho)

    By Zhi-biao Yin

    Copper smelter flue dusts often cannot be directly recycled to the smelting process and accumulate as hazardous wastes requiring environmentally acceptable disposal. Because of the limited amount of f

    Jan 1, 1992

  • TMS
    Development of Electric Power Saving Process for Ferronickel Electric Furnace

    By Akio Ohta

    The Hyuga smelter has been producing ferronickel by a rotary kiln-electric furnace process in Miyazaki, Japan. Several approaches to improve our operation have decreased the electrical energy consumpt

    Jan 1, 1992

  • TMS
    Effect Of Temperature In Extraction Of High Purity Amorphous Silica From Rice Husk For Silicon Production

    By I. U. Onyenanu, C. E. Ilochonwu, E. I. Nwonye, C. O. Nwajagu

    This work shows how pure silica was derived directly from rice husks ash (RHA) in different temperatures for reduction to Silicon (Si). The processes to form Si materials are usually complex, costly a

    Jan 1, 2015

  • TMS
    Raman Investigation Of Sulfide Leaching

    By Gretel Parker

    In situ Raman spectroscopic investigations of copper iron sulfides in leach solutions have been undertaken. Coupling potentiodynamic techniques to Raman spectroscopy produces a powerful tool for study

    Jan 1, 2003

  • TMS
    Accurate, Responsive Melt Rate Control During Vacuum Arc Remelting

    By Rodney L. Williamson

    Vacuum arc remelting (V AR) is an industrial metallurgical process widely used throughout the specialty metals industry to cast large alloy ingots. Part of the V AR control problem consists of adjusti

    Jan 1, 2003

  • TMS
    Characterization Of Precipitates In Structural Titanium Microalloyed Steel By Transmission Electron Microscopy And High Resolution (HRTEM)

    By L. Béjar-Gómez

    The aim of this research work is to study and characterize precipitates in structural microalloyed steel by transmission electron microscopy and analysis by high resolution (HRTEM). Microalloyed steel

    Jan 1, 2006

  • TMS
    Effect Of Applied Pressure On The Tribological Behaviour Of Dual Particle Size Rutile Reinforced Lm13 Alloy Composite

    By O. P. Pandey, Rama Arora, Gurmel Singh, Suresh Kumar

    The tribological behavior of Dual Particles Size (DPS) rutile reinforced LM13 alloy composite was investigated under varying applied pressure from 125 kPa to 625 kPa at a constant sliding speed of 1.6

    Jan 1, 2015

  • TMS
    An Empirical Equation For The Recovery - Enrichment Ratio Curve (AREV Model)

    By M. A. Vera

    This paper proposes a simple two-parameter model for the typical inverse relationship between recovery and flotation concentrate grade. The model is based on the mineralogical limitations imposed by t

    Jan 1, 1999

  • TMS
    Recovery Of Yttrium And Neodymium From Copper Pregnant Leach Solutions By Solvent Extraction

    By J. Brent Hiskey, Rebecca Grace Copp

    The solvent extraction of yttrium and neodymium from copper pregnant leach solutions (PLS) using Primene JM-T, a primary aliphatic amine, has been studied. Effect of contact time, pH, sulfate concentr

    Jan 1, 2016

  • TMS
    Removal of Toxic Metals from Dilute Effluents by Ion Flotation

    By Kandipati Sreenivasarao

    Ion flotation is a promising separation process for continuously removing toxic metal ions from dilute process effluents. After treating the effluent with appropriate surfactant(s), the metal- bearing

    Jan 1, 1993

  • TMS
    Copper Extraction From Complexing Solutions

    By R. F. Hammen

    Copper is one of the most widely used metals in industrial processes and is also present in most mining operations. Extraction of copper from solutions often proves difficult due to the presence of co

    Jan 1, 1994

  • TMS
    Comparative Study on Cyanide and Acid Leaching for Gold, and Silver Dissolution From Deer Trail Mine Oxide and Tailings Ore

    By Edgar Blanco

    At the Deer Trail Mine, interest in recovering noble metals from oxide ore and tailings oxide ore with 6.0/1.0 g/t Au and 200/140 g/t Ag respectively has led to metallurgic studies focused on finding

    Jan 1, 2009

  • TMS
    Recovery of Zinc and Cadmium from Lead Smelter Furnace Dusts at Met-Mex Penoles by a Solvent Extraction Process

    By I. Sofia Fernandez del Rio

    This paper describes a process for the treatment of the dusts generated during the operation of blast and reverberatory furnaces in the lead smelter, to remove zinc, cadmium, arsenic and halides from

    Jan 1, 2000

  • TMS
    Integrated Momentum and Energy Storage for Mini-Satellites

    By Ki Bui Ma

    Momentum wheels with superconducting bearings can integrate both attitude control and energy storage functions, with attendant savings in the total volume and weight of hardware, and power consumption

    Jan 1, 2002

  • TMS
    Rare-Earth Elements Recovery from Nd-Fe-B Hard Magnets by Hydrometallurgical Processes

    By Haydar Güneş

    In this study, a hydrometallurgical process was evaluated for the recovery of Nd from a Nd-Fe-B magnet. Each leaching test was performed at the solid (weight) to liquid (volume) ratio of 1:50 and was