Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Processing EAF Dusts And Other Nickel-Chromium Waste Materials Pyrometallurgically At INMETCO (281ed329-78d6-46e4-875a-6e8a7d6962de)By R. H. Hanewald
The processing of EAF baghouse dusts from both the specialty steel industry and low alloy producers will be reviewed. In addition, the INMETCO process has been modified so as to recover nickel, chromi
Jan 1, 1992
-
Aggregate Resources Vs Urban Development & Multiple Use Planning San Gabriel Valley, Calif.By G. V. Henderson
The San Gabriel Valley contains some of the richest and most extensive sand and gravel deposits in California. Operating quarries within the San Gabriel area mine more than 15 million tons of high qua
Jan 1, 1978
-
Seismic Tomography To Map Hazards Ahead Of The Longwall Face (babe4272-610a-49c3-87cf-1569c89015af)Anomalous geologic or stress conditions ahead of the longwall face can cause great harm to both the individual miner and the mining operation as a whole. The U.S. Bureau of Mines has been developing s
Jan 1, 1995
-
In Situ Grain Size Distribution Determination And Liberation Modelling Of Slow-Cooled Steelmaking Slags: Implications For Phosphorus RemovalBy E. Fregeau-Wu
To recycle steelmaking slags for their iron, manganese, and lime contents, removal of the phosphorus-bearing dicalcium silicate and calcium phosphate is essential. Slow-cooling of slags was necessary
Jan 1, 1992
-
Optimizing Complex Gold Mill Metallurgy For Cash Flow ImprovementBy M. I. Brittan
A technique has been developed that analyzes routine mill operating data to determine the key operating parameters responsible for gold losses to tails. These parameters represent the prime operating
Jan 1, 2010
-
Application and Effectiveness Measurement of Ground Consolidation Products in Longwall MiningBy Richard Campbell, MEHMET KIZIL, Ismet Canbulat, Serkan Saydam
The design and effectiveness of ground consolidation to regain stability of longwall faces vary widely and are often based predominantly on-site precedence or what were considered successful applicat
Jun 25, 2024
-
Geotechnical And Construction Aspects Of The Cerro Colorado On-Off Leach Pad, Mamina, Northern ChileBy D. C. Martin
Construction of the Cerro Colorado on-off leach pad in northern Chile required placement of approximately 3,000,000m3 of fill over a P1an area of approximately 600,000m in irregular terrain with relie
Jan 1, 1995
-
Construction Of The South Interceptor Montreal, Quebec, CanadaBy Jacques Mongrain, Serge Barbeau, Gary Brierley
The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels
Jan 1, 1987
-
Open-Pit Load & Haul Simulator: Exploring the Effects of Haul Truck Electrification on Mining ProductivityBy Josiah Pohl, Christopher Utter, Kyle Everly, Akshay Chowdu
Battery Electric Vehicles offer increased energy efficiency for open-pit load & haul operations at a potentially lower overall carbon cost. Electrifying a mine’s fleet, however, presents a unique set
Jun 25, 2023
-
Reserve Calculations: An Adventure In Geo-Fantasy?By N. B. Prenn
Many recent projects have been developed and mined based upon imaginary reserves. Imaginary or "geo-fantasy" reserves have cost many companies millions of dollars. The significant and varied technolog
Jan 1, 1992
-
Teleoperated Cutting And Haulage For Thin SeamsBy A. J. Kwitowski
Remote control for mining machines ordinarily means the operator is not seated on the machine, but is located within direct view of the machine and work area Thus, remote control operators are exposed
Jan 1, 1992
-
Use of Ammonia Salts in Selective Copper Extraction from Tailings "Mining, Metallurgy & Exploration (2020)"By Hasan Nizamoğlu, M. Deniz Turan, MÜCEVHER TURAN, RAMAZAN ORHAN
Tailings (flotation waste) that is formed during copper production may be considered in the class of valuable wastes due to the amount of copper it contains. Owing to the decreasing grade values in co
Jun 3, 2020
-
Teleoperated Continuous Mining Machine For Improved Safety (2215326c-a58c-417a-8ed1-68e2deab2686)By A. J. Kwitowski
Teleoperation is a technology that can provide significant health and safety improvements in mining, by relocating machine operators hundreds of meters away from the face area. The U. S. Bureau of Min
Jan 1, 1994
-
Advances in Industrial Ball Mill Media SizingBy T. P. Weldum, W. Conger
"These studies address the relationship between mill media sizing and its grinding efficiency. Starting with the results from a review of the literature, the issues of initial media sizing for a new b
Jan 1, 2018
-
Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021By Angus Maxwell, Jacob Grasmick
As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain
Jun 13, 2021
-
Microtunnelling In California: Using An Enlarged Shield To Excavate Multiple Tunnel DiametersBy Kimberlie Staheli
A new sanitary sewer was installed in Pleasant Hill, California using microtunnelling methods. The project consisted of 693 meters of 1372 mm and 1981 mm concrete pipe. A Herrenknecht AVN 1200 was use
Jan 1, 1995
-
Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c
Jun 13, 2021
-
Shale Gas Well Casing Deformation in Longwall Chain Pillars under Deep Cover – Field Measurement and Numerical ModelingBy Peter Zhang, Daniel Su, Mark Van Dyke, Heather Dougherty
The integrity of shale gas wells in longwall chain pillars under the influence of longwall mining is a safety concern for both coal and gas operators. Previous modeling studies of gas wells in longwal
-
Validation Of Seismic Tomography To Detect Stress In An Underground MineBy J. Jordan, D. K. Denton, D. Tesarik, D. F. Scott, T. J. Williams
Personnel from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health integrated the results of studies from a seismic tomographic survey, a finite-difference ana
Jan 1, 2004
-
Challenges in Metro Construction in IndiaBy Paul Nicholas, Raju Gottumukkala
"India’s economy is expanding with rapid urbanization. Improvement in infrastructure is a keystone to the Indian government’s economic plans, including expansion of transit systems. Most of these syst
Jan 1, 2016