Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Recent Developments In Physico-Chemical Characterisation And Modelling Of Ferroalloy Slag Systems
By S. Sun
Recent studies on the physico-chemical properties of molten slags and oxide solid solutions of interest is reviewed. The review covers redox and phase equilibria in slags, viscosity, diffusivity, elec
Jan 1, 2004
-
Key Aspects of Bench Flotation as a Geometallurgical Characterization Tool
By V. Ross
"Bench-scale flotation tests play a major role in the geometallurgical process value chain. Despite their apparent simplicity, these tests pose pitfalls in terms of operation, as well as the interpret
Mar 1, 2019
-
Distributed Compositional And Temperature Nature Of Melts In Submerged And Open Arc Furnaces In High Carbon Ferrochrome Production
By S. J. Frank
The development of feedforward semi-empirical control models for furnaces and the evaluation of mass balances are based on plant data. The models can only be as good as the data and it is
Jan 1, 2004
-
Current And Potential Applications Of Fluid-Bed Technology In The Ferroalloy Industry
By G. Denton, P. den Hoed, A. Luckos
The potential application of fluidized beds in several sectors of the ferroalloy industry is promising. They can be used in the direct reduction of iron ores to produce a feed for steelmaking, in the
Jan 1, 2007
-
Laser Surface Melting Of 304 Stainless Steel For Pitting Corrosion Resistance Improvement
By T. S. Seleka
Laser surface melting has been conducted on a 304 stainless steel (SS) with the aim of enhancing pitting corrosion resistance of the material. This process involves rapid melting of the material?s sur
Jan 1, 2007
-
CaF2 solubility in NaC1-KC1 salt flux for aluminium recycling
By E. Milke, A. Arnold, B. Friedrich, A. Sydykov
CaF2is often used as a fluoride addition to the chloride salt flux in the melting of aluminium scrap. The solubility of CaF2in the chloride salt system is limited. Dissolved CaF2is considered to impro
Jan 1, 2004
-
Grinding Control Strategy On The Conventional Milling Circuit Of Palabora Mining Company
By B. J. du Plessis
Automation of the conventional grinding circuits of Palabora Mining Company (PMC) required that adequate instrumentation and a control system had to be put in place, after which extensive testing had
Jan 1, 2001
-
Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal Mine
By B. Unver
Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe
Jan 1, 1999
-
Shaft Sinking Scheduling/Planning - Introduction (545beb62-d4f4-42b2-aefa-514c1419aba6)
By P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts. (99e42c4d-99aa-4cc4-8f39-b9fd16895c17)
By D. M. Walters
To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary cooling, must be provided. These requirements are considered for sinking vertical, sub-vert
Jan 1, 2009
-
Development and testing of a vehicle collision avoidance system based on GPS and wireless networks for open-pit mines
By A. Nieto
A vehicle proximity warning–collision avoidance system is being developed using GPS and wireless local area networks to improve safety of off-highway trucks in open pit mines. After two-and a-half yea
Jan 1, 2003
-
The Development And Implementation Of The Lonmin Mechanized Breast Mining (5e0f07f6-c4e0-42f3-af0a-2aaa336e9e56)
By R. G. B. Pickering
Over the last few years Lonmin Platinum and Sandvik have embarked on a unique partnership of collaboration through a systematic approach to developing equipment to mechanize and automate narrow reef p
Jan 1, 2007
-
A Comparative Study Of Valuation Methodologies For Mineral Developments
By E. V. Lilford
Valuators of mineral properties are faced with a range of valuation methodologies, the most important of which are grouped under the headings of the market approach, the cost approach and the income a
Jan 1, 2005
-
Process Performance Of Bacterial Leaching Reactors: The Contribution Of Mathematical Modelling
Bacterial leaching represents an unusual problem in biochemical engineering, because the substrate for bacterial growth is not supplied directly, but is a product of another reaction, the leaching of
Jan 1, 2000
-
Predicting Accident Susceptibility: A Logistic Regression Analysis Of Underground Coal Mine Workers
By J. Maiti
This study examined the group differences in accident susceptibility among underground coal mine workers accounting for their personal and workplace characteristics. A logistic regression model was us
Jan 1, 2001
-
Dealing with Expansive Rocks in the Los Quilos and Chacabuquito Water Tunnels Andes Mountains of Central Chile
By S. O. Castro, R. E. González, L. E. Velasco, J. M. Van Sint, P. V. Lois
Abstract Several zones with expansive rocks were encountered during construction of two tunnels of the water conduction system for the Chacabuquito Hydropower Plant, located in the Aconcagua river
Jan 1, 2003
-
Development Of An Empirical Model Of A Nickeliferous Chromite Leaching System By Means Of Genetic Programming
By D. J. Greeff
By making use of genetic programming, empirical models for metallurgical processes can be evolved that are more cost-effective than models determined by means of classical statistical techniques. Thes
Jan 1, 1998
-
Annual Report - For The Year Ended 30th June, 2003
Council for 2002/2003 President S.J. Ramokgopa President-elect T.R. Stacey Vice-presidents Senior F.M.G. Egerton Junior W.H. van Niekerk Immediate Past-president A.A.B. Dougla
Jan 1, 2003
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)
By D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
Activities Of Cu, Fe And Ni In Cu-Fe-Ni-S Mattes
By S. Sun
The equilibrium distribution of Cu, Fe and Ni between Cu-Ni-Fe mattes and Pt alloy was measured as functions of the sulphur partial pressure (pS2), oxygen partial pressure (pO2),temperature and Fe con
Jan 1, 2004