Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
New Blasting Techniques to Eliminate Subgrade Drilling, Improve Fragmentation, Reduce Explosive Consumption and Lower Ground Vibrations
By R. Frank Chiappetta
A new blasting technique has been developed by International Technologies, LLC. to eliminate subgrade drilling, lower ground vibrations, improve fragmentation and reduce explosive consumption. The new
Jan 1, 2004
-
Reliability of Timing Sequence Network for Multiple Blast Holes
By Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
"Sanfo": The "Missing Link" in Explosives Technology
By R J. Johnson
The development of "SANFO" has provided the Mining Industry with a LOW COST HIGH GAS VOLUME, VARIABLE DENSITY, Blasting Agent which can be blended "On Site" in a simple Agitator mixing and charging sy
Jan 1, 1996
-
Non-Electric Shock Tube Initiation Systems Applications and Hookups
By John Watson, Tom Treleaven
This guide presents nur-nerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide Quick reference by number of decks or bunc
Jan 1, 1995
-
A Practical Guide for the Blasting of Armour Stone or Riprap
By Alastair Grogan, Ron Elliott, Dale MacLean
Blasting for armour stone presents many unique challenges. Often, blasters get themselves into trouble when they assume that they can simply modify a production blast design to produce the required fr
-
Sappington Bridge: An Opportunity for Strengthening Research and Demolition Training
By J. Baird
The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford
Jan 1, 2003
-
Methods of Evaluating and Predicting Fragmentation
By Claude Cunningham
The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage
Jan 1, 1995
-
Production Blasting with Electronic Delay Detonators at Peak Quarry
By H G. Bosmare, G Bedser, C V. B Cunningham
Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl
Jan 1, 1998
-
Improving Safety of Drill Steel Diameter Changes on Rotary Drills
By Zach Ellis, Dusty Fisher
The Office of Surface Mining, Reclamation, and Enforcement (OSM) cited a large surface coal mine for a series of flyrock incidents that occurred when blasting close to the mining lease perimeter. The
Jan 1, 2015
-
Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power Station
By N. Jayaraman, V. Srikant, A. Radhakrishna
Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra
Jan 1, 2003
-
The Impact of Blasting on Pit Slope Stability
By Pefer F. Stacey
This paper considers some of the trends in slope design technology that are emerging as we approach the 21st Century. While the ability to design stable slopes has unproved greatly over the past 20 ye
Jan 1, 1994
-
Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems
By Bruce Vandenberg, R. Frank Chiappetta, John Foley
Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of
Jan 1, 2000
-
Soil Cap Density Distributions Resulting from Buried Explosions in Saturdated Sand
By L C. Taylor, H U. Lesiste
This paper describes a method for estimating the density distribution in the soil cap as a function of distance from its top at the time of impact with the target. It provides an estimate of the densi
Jan 1, 2011
-
Critical Delay Timing in Multi-Level Mass Stope Blast Design
By Dale Preece, Stephen Chung, Qian Liu
Stoping is one of the widely adapted methods in underground mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sub- level in the ore zone and blasted ring by
Jan 1, 2003
-
Concrete Bridge Pier Removal in an Environmentally Sensitive River
By Paul Kunze
When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.
Jan 1, 2014
-
The Influence of Damping on Computer Simulations of Rock Motion: Computer Modeling of Gas Flow and Gas Loading of Rock in a Bench Blasting Environment
By Steven D. Knudsen, Dale S. Preece
Computer modeling of the blasting process can aid in gaining an understanding of the physics controlling the process. The sequence of events in a blast occur so rapidly and in such a violent environme
Jan 1, 1992
-
Stratablast in Action
By C. Rutledge
The new mining method of multiple strata blasting, called StratablastTM, is described in a separate paper presented at this conference. The current paper presents three case studies where the techniqu
Jan 1, 2006
-
Explosively Loaded Vessel for Dynamic Experiments at Advanced Photon Source
By Christian J. Sorensen, Christopher Armstrong, Andrew Matejunas
A team consisting of junior and senior mechanical engineering students at New Mexico Tech worked on the design of an explosively loaded vessel, with a maximum load of 15 grams (0.53 oz) TNT equivalent
Jan 1, 2015
-
Momentum Theory – A New Calculation of Blast Design and Assessment of Blast Vibrations
By Robert Boehnke, Bernd Mueller
Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation
Jan 1, 2003
-
Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to Structures
By Mike Cammack, Logan Huppert, Gustavo Azpilcueta
During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin
Jan 1, 2018