Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Ultimate Shaft Friction, Displacement Response and Set-Up for Axially Loaded Piles in Clay

    By Kjell Karlsrud

    "Abstract New semi-empirical design procedures for the determination of ultimate shaft friction and load-displacement response of axially loaded piles in clay are proposed. Hereunder also prediction o

    Jan 1, 2014

  • DFI
    Apportioning Risks On An Urban Deep Foundation Project

    By Michael P. Balducci

    Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr

    Jan 1, 2008

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Performance Based Seismic Retrofit Design of Brooklyn Basin Wharf

    By Sam Yao, Ali Naeem, Sara Barrett

    Brooklyn Basin Project is a multi-billion-dollar development of the former Port of Oakland 9th Avenue Terminal located along the Oakland Estuary of California. A centerpiece of the development is the

    Jan 1, 2018

  • DFI
    Application Of PCC Piles On Soft Ground Improvement Of Expressways

    By Hanlong Liu

    The construction process and load-bearing behaviors of Cast-in-place Concrete Thin-wall Pipe Piles are analyzed based on its application on Yan-Tong Expressway project. The low strain test, static loa

    Jan 1, 2006

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • DFI
    Caisson Design And Construction Challenges On The New Tiger Stadium Project - Summary

    By Fritz J. Klingler

    From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc

    Jan 1, 1999

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    A Contribution To The Behaviour Of Piled Raft Foundations

    By H. L. Jessberger

    In recent years piled raft foundations of multi-storey buildings on weak soils have generated much interest and discussion. By taking account of the effects of each component of the system - the pile

    Jan 1, 1991

  • DFI
    Micropiles And Anchor Piles - The Liberty Bridge

    By Daryl W. Wurster

    The Liberty Bridge in Greenville, South Carolina is a curved, cable-stayed, pedestrian bridge with primary support provided by two towers. The bridge is part of the Falls Park redevelopment. The bridg

    Jan 1, 2006

  • DFI
    Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.

    By Alexander J. Verstraeten

    The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev

    Jan 1, 1987

  • DFI
    Predicting ACIP Pile Settlement Using Case Histories ? Introduction

    By Christopher M. Kenney

    Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr

    Jan 1, 2001

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub

    By Lisa R. Papandrea, David Chen, Walter E. Kaeck

    "Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su

    Jan 1, 2016

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Underwater Cable Anchors - Salvage Of Barge 45, Niagara River ? Background

    By Colin C. West

    On August 7, 1986, Barge 45, while being towed near the mouth of the Niagara River, was swept downstream and pinned against one of the central piers of the Peace Bridge. The barge rested against the p

    Jan 1, 1987

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction

    By R. G. Horvath

    In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h

    Jan 1, 1987