Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction
By Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Soil Inclusions In Jet Grout Columns
By Timothy D. Stark
Jet grouting has increasingly become one of the ground improvement technologies used to address seepage concerns and to provide strength improvement of soils. The technique of jet grouting uses high p
Jan 1, 2009
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting
By Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles
By Sridhar Krishnan
This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p
Jan 1, 2006
-
Macropiles: Ultra-High-Capacity Micropiles For Foundation Support
By John R. Wolosick
MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr
Jan 1, 2006
-
The Application Of The Caisson In China
By Chen Xizhe
The caisson is adapted to the foundation of concentrated heavy building. As there are the flowing sand, boulder or cobble and other serious obstruction, the open caisson can't sink, the caisson c
Jan 1, 1991
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques
By Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Diaphragm Wall Construction In Hong Kong
By Arturo Ressi di Cervia
The utilization of diaphragm wall construction in Hong Kong began in 1974 with the construction of the New World Center, the first diaphragm wall job built in the British Colony. That landmark job
Jan 1, 1993
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall
By D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
Static And Dynamic Tests For Evaluation Of The Vertical Load Bearing Capacity Of Piles - Summary
By Madan B. Karkee
The understanding and the development of sound theoretical basis concerning the pile foundations has been phenomenal during the past few decades, considering the thousands of years the piles have evid
Jan 1, 1997
-
Earth Retention Systems In The Urban Environment - Special Considerations
By George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska
By Mohammed Sakr
The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development
Jan 1, 2009
-
Drilled Pier Foundations In Expansive Soils ? Synopsis
By F. H. Chen
the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri
Jan 1, 2010
-
Improvement Of The Cost-Effectiveness Of H-Bearing Piles By Using High-Strength Histar Steels. - Summary
By Lucien P. Weber
Over the last few years, increased customer demands as well as strong competition from substitute materials have accelerated the development of advanced technologies to improve both the performance an
Jan 1, 1997
-
Field Trials for Deep Mixing in Land Remediation: Execution and Early Age Monitoring, QC and Lessons Learnt
By Ziyad Abunada, David O’Connor, Abir Al-Tabbaa
"Abstract Contaminated land remediation using soil mix technology (SMT) is a relatively recent development which has been shown to be a cost effective and versatile system with numerous environmental
Jan 1, 2014
-
Deep Foundation Design For Liquefaction Induced Lateral Spreads
By Zia Zafir
Design of the deep foundations for the loads imposed by lateral spread include the estimate of the pressure applied by the liquefied material as well as amount of anticipated displacement. In the abs
Jan 1, 2006
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)
By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Construction Of Deep Open Foundations For Airoli Road Bridge On Thane Creek In New Bombay - Synopsis
By A. R. Jambekar
City of Bombay has been developed out of former 7 islands. Landmass of 434 sq.km. of Bombay, started looking inadequate for further growth and expansion of Bombay City. In order to develope twin city
Jan 1, 1996
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction
By Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
Augered Cast-In-Place Pile Manual (Model Specification with Commentary)
"Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst
Jan 1, 2016