Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fluorspar -Flux to Fluorocarbon

    By C. M. Bartley

    Fluorspar, in addition to its familiar uses as a metallurgical flux and as a source of the electrolyte for aluminum production, has become important as an essential raw material in the rapidly growing

    Jan 1, 1962

  • CIM
    A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, Nunavut

    By K. Muehlenbachs, J. U. Stemler

    "Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary

    Jan 1, 2006

  • CIM
    Hydrometallurgy for Copper Concentrates?

    By John Dasher

    The analyses reported on in this paper indicate that there are hydrometallurgical routes from sulphide concentrates to copper that are potentially competitive with smelters which are not permitted to

    Jan 1, 1973

  • CIM
    Stirling Mine Operations

    By J. G. A. Stevenson

    GENERAL Location of Property THE Stirling zinc-lead-copper deposit is in Richmond county, Cape Breton, about a quarter of a mile southwest from Stirling P.O., and some 45 miles southwest from Sydn

    Jan 1, 1937

  • CIM
    Concentration of PGMS from Spent Automobile Catalyst by Combining Heating-Quenching and Selective Grinding

    By G. F. Liu, S. Owada

    Platinum Group Metals (PGMs), Pt, Pd, Rh, have been widely used as a three-way catalyst to clean discharged gas from automobiles and therefore a considerable amount of the spent catalysts is generated

    Jan 1, 2015

  • CIM
    Investigation into Long-Term Strength of Brittle Rocks Based on Micromechanics

    By Z. S. Shao, X. Z. Li

    "Sub-critical crack growth plays an important role in long-term creep failure in brittle rock. Based on micromechanics established by using relationship between micromechanical wing crack growth model

    Jan 1, 2015

  • CIM
    Canadian Mining in the Seventies

    By A. E. Boone

    "The paper presents critical areas in which improved coordination of effort by industry, government and sup-pliers will be essential to continue the growth record of the Canadian mining industry into

    Jan 1, 1970

  • CIM
    Crushing and screening circuits

    By D. W. Zandee

    "IntroductionHaving mined an economic mineral bearing rock which is of insufficient grade to warrant direct smelting, upgrading or beneficiation is required to make it an economically viable ore. The

    Jan 1, 1989

  • CIM
    Experimental Study on Comminution and Mineral Liberation of a Copper Ore by Interparticle Breakage

    By J. Y. Liu

    In Comparison to the application of HPGR (high-pressure grinding rolls) in the cement industry and in iron ore processing, the introduction of this energy-efficient comminution technology to processin

    Jan 1, 2016

  • CIM
    Multi-Point Concurrent Tracking and Surveying in Construction Field

    By S. Mao

    Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends

    Aug 1, 2013

  • CIM
    Overview of the Dragon Lake Uranium Prospect, Maybelle River Area Northeastern Alberta, Canada

    By C. Cutts, K. Wheatley

    The Dragon Lake Zone (uranium prospect) comprises a N160º trending vein that is approximately 110 m long, up to 5 m wide and from 1 to 40 m high. The zone is mostly within altered sandstone of the Fai

    Jan 1, 2013

  • CIM
    Undercut-and-Fill Mine of the at the Frood-Stobie Mining International Nickel Company of Canada, Limited

    By J. A. Pigott, R J. Hall

    The International Nickel Company of Canada, Limited operates five underground mines on the rim of the Sudbury Basin in the northern part of the Province of Ontario. Four of the mines, the Frood-Stobie

    Jan 1, 1961

  • CIM
    The Underground Phase of the Geco Project

    By P. C. McLeod

    THE GECO OREBODY, located north of lake Superior in the Thunder Bay district of northern' Ontario, was discovered in 1953. Diamond drilling in the following year indicated a 15,000,000-ton ore-bo

    Jan 1, 1958

  • CIM
    Organic Centre-Lake Sediments-Application in the Geochemical Exploration for Gold in the Canadian Shield of Saskatchewan

    By William B. Coker, Vladimir J. Sopuck, J. S. Fox

    "Preliminary investigations indicate that organic lake sediments offer some potential for gold exploration within the Canadian Shield of northwestern Saskatchewan. It is also apparent that certain pre

    Jan 1, 1982

  • CIM
    Slag Fuming Process Intensification at Trail Operations

    By K. J. Heale, G. G. Richards, D. J. Rioux, R. L. Stephens

    Slag fuming has remained a key process for the recovery of Zn, Pb, and minor elements in the integrated flow sheet at Teck Cominco's Trail Operations for more than 75 years. Since the start-up of

    Jan 1, 2008

  • CIM
    Recrystallization of AZ31 Magnesium Alloy during High Speed Rolling and Subsequent Annealing

    By Abu Syed H. Kabir, Mehdi Sanjari, Steve Yue, Jing Su, In-ho Jung

    AZ31 magnesium alloy sheets were produced by high speed rolling (HSR) at 1000 m/min at a low temperature of 100 ?. A high reduction of 72% can be achieved in single pass. At the reduction of 30%, the

    Jan 1, 2015

  • CIM
    Direct Contact Heat Transfer between Steam and Aqueous Slurries

    By D. T. White

    "Metallurgical extraction processes often call for the heating of aqueous slurries. Indirect heat exchangers are generally not feasible for service with high yield stress slurries because of low heat

    Jan 1, 2012

  • CIM
    Arrested Cupellation: A Step Change in Fast in-Line Fire Assay That Enables Gold Analysis at Low Concentration

    By B. Hohenstein, B. McBain, B. de Jong

    "The automated fire assay system (Fast In-line Fire Assay or FIFA) has not found acceptance in the Au mining industry as the lower measurable limit of 0.20 ppm did not allow Au tailings to be measured

    Jan 1, 2017

  • CIM
    Separation of Zinc from Nickel Sulfate Solution with Solvent Extraction Method: Nickelboussingaultite Crystallization in the Raffinate by Ammonia

    By Davood Moradkhani, Maryam Rasouli

    "The present study reports solvent extraction and separation of zinc from concentrated nickel sulfate solution. In our previous study, Zn and Cd in cold filter cake (CFC, 45-55% Zn, 11-16% Cd, and 2.5

    Jan 1, 2017

  • CIM
    Planned Maintenance at Brunswick

    By F. W. Tregarthen

    "This paper gives a brief description of the methods used to form and implement the present planned maintenance program. The system is designed to assist plant personnel in their task of controlling a

    Jan 1, 1971