Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The R67 Refrigeration Plant at Enterprise Mine, Mount Isa ù The WorldÆs Largest Bulk Air Cooler

    The 3.5 million tones per annum Enterprise mine is the newest underground copper mine at Mount Isa in northern Australia. At a depth of up to 2000 metres, it is the hottest and deepest mine in Austral

    Jan 1, 2002

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016

  • AUSIMM
    Understanding the side-blown furnace slag system at Glencore Nordenham’s lead plant – from theory to industrial application

    By C Zschiesche, alam, A Abadias Llamas, A K

    Lead has the ability to collect and carry valuable metals such as copper, bismuth, antimony, tin and precious metals for their downstream recovery. Therefore, lead metallurgy is key for the raw materi

    Jun 17, 2024

  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024

  • AUSIMM
    Optimising Flow in the Mining Value Chain

    By A Dunne, R Kruger, H Coleman, P G. Laurens

    External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc

    Jul 13, 2015

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI

    By J Butler, N Patel, S Narendranathan, S Rastogi

    The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o

    Aug 2, 2023

  • AUSIMM
    Performance and Acceptance Testing of Mine Refrigeration Plants

    There is an increasing demand for refrigeration as mines progress deeper. Mine refrigeration plants have special requirements in terms of their duty and application. There are no national or internati

    Jan 1, 2005

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Potential of the Overburden Cast Blasting Technique in Indian Surface Coalmines – A Modular Approach and its Financial Implications

    By M D. Uttarwar, R R. Yerpude

    India is the world’s third-largest producer of coal and is endowed with the fifth-largest coal reserves in the world. Surface mining straddles the entire domain of the Indian coal mining industry, yie

    Aug 24, 2015

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Queensland Mines Should Consider Climate Change Impacts for Decommissioning

    By M C. Evans

    "Mine decommissioning is the final phase in a mining project. Planning for decommissioning must commence for a proposed mine even before the government approves it. Queensland mining approvals require

    Jul 16, 2014

  • AUSIMM
    Wireless System for Monitoring Cave-back Propagation

    By S Steffen, S Talu, J Poulsen, G Watt, A van As, J S. Ooi

    The economic success of cave mining projects is significantly influenced by the secondary fragmentation size distribution of the caved orebody and making the fragmented ore available for extraction. I

    May 9, 2016

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    Determination of the Complete Sampling Distribution for a Particulate Material

    By G J. Lyman

    The theory of sampling has progressed slowly over the last century. The concepts of correct sampling were known to mining engineers such as D W Brunton in the 19th century. It was recognised early in

    Jul 29, 2014

  • AUSIMM
    A Day in the Life of a Mine Worker in 2025

    By V Srinivasan, P Knights, C T. Farrelly

    By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.

    Jan 1, 2008

  • AUSIMM
    Injection of Coal-Oil Mixture into Blast Furnace

    By Tamura S, Maekawa M, Nagai C, Deguchi M

    Heavy fuel oil has been injected into blast furnaces in order to reduce the coke rate, to improve productivity and to control the furnace heat condition. However, in the first oil crisis at the en

    Jan 1, 1981

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    A Dynamic Ore Reserve Calculation and Accounting System for a Stratiform Orebody

    By Jaczkowski B

    The lower orebody (LOB) at Chingola Divi- sion of Nchanga Consolidated Copper Mines Limited (NCCM) accounts for approximately 30 per cent of the total copper production for the company. The uniform

    Jan 1, 1977