Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation

    By A Mooney, J Marsden, H Grosser, G Dunstan

    Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho

    Mar 15, 2021

  • AUSIMM
    Evaluation of sustainability of copper production value chain from ore to metal using advanced simulation

    By A Remes, A Dennis, M Talikka, T Kotiranta, S Horn

    A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan

    Jul 25, 2018

  • AUSIMM
    The Frieda Kiss – Keeping It Simple

    By S J. Tear, L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Frieda River Project is located in the north-west of Papua New Guinea. The target commo

    Mar 18, 2015

  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk

    By A Jewbali, R Perry, R Inglis, L Allen

    "The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively

    Nov 24, 2014

  • AUSIMM
    Designing Flotation Circuits for High Fines Recovery

    By D C. Curry, M F. Young

    Many flotation operations need to improve liberation to increase recovery, yet often plant operators are concerned that finer grinding will produce æslimesÆ with low flotation recovery. Yet simple cir

    Jan 1, 2005

  • AUSIMM
    Application of Geographical Information System to Mineral Exploration - a 'Weights of Evidence' approach using Misima Island, Papua New Guinea as a Case Study

    By Bure R

    Approximately 2.4 million ounces of gold and 11.3 million ounces of silver have been produced from the Umuna Lode by Misima Mines Pty Limited between June 1989 and the end of Decemeber 1996. Reserv

    Jan 1, 1997

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    Characterisation of Low-grade Hematite Ore Ultra-fine Size Fraction Particles by Heavy Suspension

    By S McKnight, L Koroznikova, J Begelhole

    "This paper outlines a simple methodology for iron ore characterisation. Iron ores commonly contain a range of iron oxides with varying iron content along with generally minor quantities of lighter si

    Jun 15, 2016

  • AUSIMM
    Effect of Dynamic Pressure on Electronic Detonator Timing

    By R Ibarra, H Solis, G Teowee, B E. Papillon

    The authors have previously described a piezoelectric-based system to measure the dynamic pressure during actual detonation in the field. This technique is used in a water hammer test set-up where a d

    Aug 24, 2015

  • AUSIMM
    Hoist Ropes for Double-Drum Winders ù A New Concept

    By R Verreet

    In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used

    Jan 1, 2005

  • AUSIMM
    Quantifying Geotechnical Risk in the Mine Planning Process

    By T P. Medhurst

    In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi

    Jan 1, 2000

  • AUSIMM
    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    Your Career ù Are You an Overnight Dot.Com or a Long-Term Growth Option?

    The current boom being experienced by mining, coupled with a shortage of professionals, will mean those in the industry will have many choices. It may be easy to become carried away and run with the h

    Jan 1, 2004

  • AUSIMM
    Carbon kiln selection, operation and maintenance

    By J K. Claflin, S R. La Brooy, A M. Claflin

    Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad

    Aug 29, 2018

  • AUSIMM
    Practical waste rock management at the Roy Hill iron ore mine, Western Australia

    By J Pearce, B Miles, V de San Miguel

    Incorporating industry best practice waste rock management methods can be a relatively straight forward task when preparing management documentation, such as an acid and metalliferous drainage managem

    Jul 25, 2018

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018

  • AUSIMM
    Post Closure Management of the Mt Leyshon Gold Mine - Water the Integrator

    By T Baumgartl, D Mulligan, R Haymont

    Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the

    Jan 1, 2006

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007