Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Challenger Gold Mine

    By M Sandy, P Bamford

    The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f

    Jan 1, 2008

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011

  • AUSIMM
    Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue Valley

    By P Hawke, J Hurst, B KrapeP

    Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy

    Aug 12, 2013

  • AUSIMM
    Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

    By A Ross, B De Rivaz

    The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by u

    Sep 17, 2014

  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Scaled depth of burial application to increase blast efficiency in PT. Indo Muro Kencana

    By A Suwandhi, H Utama

    PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (

    Jun 22, 2022

  • AUSIMM
    Technical Note: Carbon Dioxide in the Southern Coalfields N.S.W - A factor in the Evaluation of Natural Gas Potential?

    By Smith J. W, Hart G. N

    Compositional and isotopic analyses of coal seam gases in the Southern Coalfields have shown that these gases frequently contain abnormally high concentrations of magmatically derived carbon dioxide.

    Jan 1, 1981

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • AUSIMM
    Monorail Technology - A Rapid and Cost-Effective Method of Decline Development

    By B Besa

    Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also

    Jan 1, 2008

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic Separators

    By A Horn

    Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g

    Jul 11, 2011

  • AUSIMM
    HIT – a Portable Field Device for Rapid Testing at Site

    By T Kojovic

    "The index A*b, determined from the Julius Kruttschnitt Mineral Research Centre (JKMRC) drop weight tester (DWT) results, has become well-known in the mining industry as a reliable measure of ore hard

    Oct 10, 2016

  • AUSIMM
    Urban Geology and its Relationship to Intraplate Earthquake Risk - Lessons from the 1989 Newcastle Experience

    For the past five years the University of Queenslandhas, through its various workshops, been preaching to Australia that there was a potentially hazardous situation from earthquakes for urban Australi

    Jan 1, 1990

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    Present Practices And Future Trends In World Dry Bulk Handling Operations

    Over a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and

    Jan 1, 1973

  • AUSIMM
    The Use of Unique Admixture Technologies in Mine Backfill-Technology Description and Case Histories (037359e3-5adb-49ba-a78e-a0ed2db408e1)

    By Karlson R, Rispin M

    Chemical admixtures are not commonly included in the variety of backfill mixes used in the mining industry. This may be attributed to several reasons including, but not limited to: the perceived hig

    Jan 1, 1998