Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Environmental and Resource Investigations for Mine Planning and Design

    Environmental information is an essential part of successful mine design and approval. In order to be most effective in its application and availability, this information needs to be collected in prog

    Jan 1, 1987

  • AUSIMM
    BATMIN - Business Analysis Tools for Mining

    BATMINÖ, BATMINEÖ, BATMINDÖ are an abbreviation for Business Analysis Tools for Mining, Mine Evaluation and Mine Design respectively. BATMINP are proprietary tools customised to suit individual clien

    Dec 6, 2010

  • AUSIMM
    Findings from a transient electromagnetic trial for heat-affected coal

    By H J. Stedman

    A Transient Electromagnetic (TEM) geophysical survey was trialled in Bowen Basin Permian coal measures overprinted by Cretaceous intrusion. The trial’s intention was to compare whether TEM could asses

    Sep 20, 2017

  • AUSIMM
    Preconditioning E48 Cave Extension Adjacent to an Active Cave

    By J Samosir, L Snyman

    Northparkes was the first mine in Australia to use block cave mining method which relies on gravity and natural rock stresses to fragment and recover the ore. It was also the first hard rock mine to u

    May 9, 2016

  • AUSIMM
    Pilbara creek diversions – resilience gained through increased ore recovery and an integrated approach to design

    By M Rafty, A Markham, S Atkinson, M Heyting

    Over recent years there has been a significant increase in the number of miners in the Pilbara region of Western Australia targeting channel iron deposits (CID) located in valleys, intersected by ephe

    Jul 24, 2017

  • AUSIMM
    Tailings Management at Macraes Gold Mine

    An important consideration in any mining operation is waste disposal management. Tailings management at Macraes gold mine allows for the disposal of tailings into fully engineered embankment dams and

    Jan 1, 1992

  • AUSIMM
    Volcanogenic Massive Sulfide Deposits in New Zealand

    By R L. Brathwaite

    In New Zealand, volcanogenic massive sulfide (VMS) deposits are found in three main geological environments associated with: 1.   ophiolitic basalts of Oligocene age in Northland and East Ca

    Jan 1, 2005

  • AUSIMM
    An Integrated Study of Bubble-Particle Attachment Mechanisms

    An Integrated Study of Bubble-Particle Attachment Mechanisms

    Sep 13, 2010

  • AUSIMM
    Where New Zealand Fits Internationally

    New Zealand depends on foreign investment for economic development. This also applies to the development of New Zealand's mineral resources. For this foreign investment to happen there must be so

    Jan 1, 2000

  • AUSIMM
    Alliance Type Contracts

    When it comes to structuring major mining contracts, the two most widely adopted formats are æmeasure and valueÆ and æcost-plusÆ. A problem with both of these formats is the difficultly of aligning th

    Jan 1, 2007

  • AUSIMM
    New Bio-Adsorber with Activated Carbon and Nano Tube Carbon for Separation of Nickel and Cadmium

    New Bio-Adsorber with Activated Carbon and Nano Tube Carbon for Separation of Nickel and Cadmium

    Sep 13, 2010

  • AUSIMM
    Application of Genetic Algorithms for Reliability Assessment of Two Mine Hoisting Systems

    This paper discusses the application of a computerised model based on genetic algorithms (GAs), called GenRel, for reliability assessment of underground mine hoisting systems. The purpose of this pape

    Dec 6, 2010

  • AUSIMM
    Recovery of Pentlandite and Chalcopyrite from Tailings by Bi-Cyclone Powerful Flotation Column

    Recovery of Pentlandite and Chalcopyrite from Tailings by Bi-Cyclone Powerful Flotation Column

    Sep 13, 2010

  • AUSIMM
    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    The Role of Mineral Processing in the Development of Cement with Low Carbon Emissions

    Sep 13, 2010

  • AUSIMM
    Recent Advances from the United Kingdom Tunnelling Industry - The A3 Hindhead Project

    By T Rock

    This paper looks at recent advances in the United Kingdom (UK) tunnelling industry with particular reference to the A3 Hindhead Project. A 1.8 km long twin bore tunnel is the centrepiece of the A3 Hin

    Jan 1, 2008

  • AUSIMM
    Bio-Mineral Processing - Its Potential to Revolutionise the Industry

    Bacteria can play a key role in the processing of 'difficult' ores. Bioleaching opens the way to potentially extract copper from vast amounts of otherwise hard to process refractory low-grad

    Sep 13, 2010

  • AUSIMM
    Review on Some Research Methods of Mineral Crystal Chemistry and Computer Simulation on Flotation

    Review on Some Research Methods of Mineral Crystal Chemistry and Computer Simulation on Flotation

    Sep 13, 2010

  • AUSIMM
    Geological Constraints in Applying Bioremediation to the Decontamination of Polluted Soil

    By B M. Guerin

    In this paper, some of the constraints to applying bioremediation to the decontamination of polluted soils are introduced. Particularly, attention has been given to those associated with the geology o

    Jan 1, 1992

  • AUSIMM
    Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes

    Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin

    May 1, 2010

  • AUSIMM
    Mine Closure and Aftercare - The Waikato Experience

    This paper reviews rehabilitation, closure, and post-closure management of the Tui, Golden Cross, and Martha Mines, all of which are located in the Waikato Region of New Zealand. There was no requirem

    Jan 1, 2003