Search Documents

  • SAIMM
    Quantitative Rockburst Hazard Assessment At Elandsrand Gold Mine

    By F. Essrich

    A quantitative rockburst hazard assessment procedure was introduced on Elandsrand Gold Mine at the end of 1994. It is currently used to evaluate the seismicity-related risk in production areas on the

    Jan 1, 1997

  • ISEE
    Burn Cut Pull Optimization through Varying Relief Hole Depths

    By Michael Allen, Paul Worsey

    In underground blasting, the pull of the initial cut is the limiting factor for the success of the rest of the round. By improving the pull of the first cut, a critical step is made towards improving

    Jan 1, 2015

  • NIOSH
    RI 7247 Preparation Of Tungsten Carbide By Electrodeposition

    By John M. Gomes

    The preparation of tungsten carbide by molten-salt electrolysis was investigated. Sodium tungstate in the electrolyte and carbon from the graphite anode were the source materials, Optimum results were

    Jan 1, 1969

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • DFI
    Installation, Design, And Quality Control Of Augercast Piles ? Introduction

    By William J. Neely

    Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd

    Jan 1, 1990

  • SME
    Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel Boxes

    By Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman

    Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro

    Jan 1, 2001

  • SME
    New Developments In Ground Support Technology For Open-Type Tunnel Boring Machines

    By Steve Chorley

    Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good

    Jan 1, 2011

  • NIOSH
    IC 8101 The National Safety Competition Of 1960 ? Summary

    By John C. Machisak

    The National Safety Competition is sponsored and conducted annually by the Bureau of Mines, U.S. Department of the Interior, to give greater impetus to the building of programs safeguarding the employ

    Jan 1, 1962

  • SME-ICGCM
    Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of Mining

    By Shosei Serata

    The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu

    Jan 1, 1986

  • DFI
    Case Study: Innovative Soil Nail Stabilization Of A 100 Foot High Urban Slope

    By Mike Fabius

    The Lakehead Region Conservation Authority is responsible for slopes along the Kaministiquia River, one of the largest tributaries to Lake Superior in Canada. After arresting toe erosion for a mile o

    Jan 1, 2006

  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • DFI
    Case History: Estimating Ground Vibrations Caused By Pile Driving

    By Tracy Brettmann

    A new method for estimating ground vibrations caused by pile driving was developed as a result of a vibration monitoring program performed for a large pile driving project. The method is accurate, rat

    Jan 1, 1999

  • AUSIMM
    Notes on the Takasima Coal Mines, Nagasaki, Japan

    The Takasima Coal Mines comprise four islands near the entrance to Nagasaki Harbour, and are owned and worked by the Mitsu Bishi Company.There are several unusual features in the occurrence and workin

    Jan 1, 1901

  • CIM
    Environmental Planning in Mine Waste Management - The Huckleberry Mines Experience

    By Henri F. Letient

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    May 1, 2002

  • NIOSH
    RI 2300 Underground Loading Devices in Metal-Mines

    By C. Lorimer Colburn

    "The diverting of men from industry to combat in the world's war focused the attention of the operators in this country upon mechanical means of doing things. The demand for man-power -was so insisten

    Oct 1, 1921

  • AUSIMM
    Electrowinning of Copper at High Current Densities

    The maximum current density at which conventional copper electrowinning plants will result in satisfactory, adherent, and dendrite·free cathodes is determined by the thickness of the diffusion bo

    Jan 1, 1972

  • ISEE
    Back to the Basics; Nonelectric Initiation Shock Tube Systems Part 2: Safety Considerations

    By Larry Schneider

    "0 ne of the incentives that led to the development of non-electric shock tube initiation systems was the desire within the industry to improve detonator safety. And to the extent that nonelectric ini

    Jan 1, 1995

  • ISEE
    Journal: Blast Vibration and Seismograph Section / Accuracy of Blasting Seismographs

    By Bob Turnbull

    The International Society of Explosives Engineers (ISEE), at its 1995 annual conference, established a Seismograph Standards Working Group to develop performance standards for blast vibration seismogr

    Jan 1, 2007

  • SME
    Managing The Drill And Blast Process

    By L. W. Berry

    Drill and blast planning is critical to successful mine production, both in timing and in results. However, typical planning, reporting, and information exchange usually involves large quantities of d

    Jan 1, 2011