Search Documents

  • DFI
    Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge Abutment

    By Samer R. Rabab?ah

    As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)

    Jan 1, 2011

  • AUSIMM
    Preparation of MgO Nano-Particles with Magnesite

    Preparation of MgO Nano-Particles with Magnesite

    Sep 13, 2010

  • NIOSH
    OFR-84-77 Improved Truck Driver Alertness Technology

    By Bruce McDonald

    This report contains the Phase I findings of a study to select and test devices for preventing lack of alertness in haulage truck drivers. The extent of the problem was determined by visiting surface

    Jan 1, 1977

  • CIM
    Fine Grinding Applications Using the Metso Vertimill® Grinding Mill and the Metso Stirred Media Detritor (SMD) in Gold Processing

    By Graham Davey

    "Low speed stirred milling has been employed for many years in the metalliferous and industrial minerals industries. High speed stirred milling is a relatively new method of grinding in the metallifer

    Jan 1, 2006

  • TMS
    Pyrometallurgical Refining Of Copper In An Anode Furnace

    By H. Antrekowitsch

    The decreasing quality of the input materials in copper recycling leads to a higher content of impurities in the anode copper. An improvement of the pyrometallurgical refining process is therefore nec

    Jan 1, 2005

  • AUSIMM
    A Case History of Geochemistry and Prospecting in North-West Queensland

    By Branagan D. F

    The geology of the area studied is briefly described, together with the prospecting methods used in the search for copper, lead, zinc and uranium ore bodies.Four prospects, Mt. Corella, Yanasinga, Law

    Jan 1, 1960

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • DFI
    Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska

    By Mohammed Sakr

    The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development

    Jan 1, 2009

  • IIMP
    Sistema de gestión operativa

    By Marco Muñoz

    La mina Porvenir, perteneciente al Grupo Milpo, está ubicada en Cerro de Pasco, destacándose por la corporación de equipos de alta tecnología minera adecuada a sus operaciones. En ese sentido, el pre

    Jul 17, 2000

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • CIM
    Distinguishing ore types at the Lac des Iles PGE-gold-copper-nickel mine, Ontario: Implications for resource modelling, mining and processing

    By M. J. Michaud, M. J. Lavigne

    "A cornerstone of any successful mining project is an understanding of the mineral assemblage and metal distribution comprising the deposit. Knowledge of the precise mineral/ metal zoning enables an o

    Jan 1, 2003

  • NIOSH
    The Introduction Of Roof Bolting To U.S. Underground Coal Mines (1948-1960): A Cautionary Tale

    By Christopher Mark

    Perhaps the most significant development in coal mine ground control during the last century was the introduction of roof bolting during the late 1940’s and 1950’s. From an engineering standpoint, ro

  • AUSIMM
    Case study – an analysis of reliability and efficiency: ultrasonic versus annubar technologies

    By M J. Shearer

    An investigation into the reliability of the data being collected at the Mount Isa Mines site operated by Glencore in Queensland allowed on-site ventilation personnel to scrutinise pressure and volume

    Aug 28, 2017

  • SME
    Mining Foundation of the Southwest Honors 2002 Inductees

    The 20th annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Westin La Paloma in Tucson, AZ, on Saturday, Dec. 7, 2002. This y

    Jan 1, 2002

  • SME
    Ground Condition Mapping: A Case Study

    By H. Lawson

    The Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03in April of 2008, providing formal guidance on using programs that model the redistribution of stress during

    Jan 1, 2012

  • AUSIMM
    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface

    Effect of Anionic Surfactant on Silica Particle Attachment at the Oil-Water Interface Controlling particle attachment is crucial where powdered solids come into contact with oil and water. Particles

    Sep 13, 2010

  • SME
    NAT Attendees Get A Glimpse Of The Future Of Underground Space Use

    In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi

    Jan 1, 2008

  • AUSIMM
    Residual Aeolian Placers - A New Style of Gold Deposit in New Zealand

    Residual aeolian placers (RAPs) are formed by the wind, by preferential entrainment and removal of small and low-density detritusfrom a pre-existing, typically sedimentary sequence containing heavy mi

    Jan 1, 2004

  • CIM
    In Situ Synchrotron Radiation Diffraction during Compression of a ZKQX Alloy

    By K. U. Kainer, A. Stark, D. Tolnai, M. Hehenberger, C. L. Mendis, N. Schell, N. Hort

    Samples of an as extruded Mg-6Zn-0.6Zr-0.4Ag-0.2-Ca (wt.%) alloy was compressed at room temperature and at 250°C. The in situ deformation tests were performed at the P07 (HEMS) beamline of PETRA III,

    Jan 1, 2014

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011