Search Documents

  • AUSIMM
    A Convenient Method for Survey of Stopes and Development

    THE most important part of the routine survey work on a mine is the keeping up-to-date of plans and sections showing progress of stoping and development work, and the direction of the latter for the p

    Jan 1, 1928

  • ISEE
    Airblast Control Techniques in Open Cut Mines

    By Alan: Moore Richards

    Effective control of airblast requires that significant factors be identified and satisfied by blast design and careful implementation. Significant factors include charge mass, distance, face height a

    Jan 1, 2006

  • SME
    COPPER 99 – Mine Closures Help Copper Prices Improve

    By William R. Yernberg

    The current state of the copper industry was the topic of discussion at the Copper 99 — Cobre 99conference held Oct. 10 to 13, 1999, in Phoenix, AZ. More than 700 copper-industry engineers, executive

    Jan 1, 2000

  • AUSIMM
    Some Technical Aspects of Treatment Operations at Mary Kathleen Uranium Ltd.

    By Hemingway P, Boag J

    Major operating aspects of the Mary Kathleen Uranium Ltd. treatment plant are discussed with partkular reference to those which are peculiar to this operation.Problems associated with the production o

    Jan 1, 1961

  • SME
    Equipment adds efficiency, safety to cross passage work

    From a vast army of workers to gargantuan machines to immense volumes of material being moved, almost everything about the Port of Miami Tunnel (POMT) project points to tunneling on a massive scale. A

    Sep 1, 2013

  • AUSIMM
    A Portable Assay Furnace

    In the early stages of opening up a mine, when there is some uncertainty as to its future career, necessitating caution in laying out works of a permanent character, the want is often felt of an assay

    Jan 1, 1904

  • SAIMM
    3-D Numerical Modelling Of Stresses Around A Longwall Panel With Top Coal Caving

    By N. E. Yasitli

    There is a considerable amount of lignite reserve in the form of thick seams in Turkey. It is rather complicated to predict the characteristics of strata response to mining operation in thick seams. H

    Jan 1, 2005

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • SME
    Tunneling Through Cobbles in Sacramento, California

    By Joel Nonnweiler, Rafael Castro, Ross Webb

    The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n

    Jan 1, 2001

  • AUSIMM
    Molybdenum Flotation Circuit and Flotation Cells

    By D Jensen, L Riffo, S Yu, F Traczyk, D Meadows

    With the steady increase of molybdenum demand worldwide and the favorable molybdenum market, many technological innovations on both process and equipment have been developed and applied in many modern

    Jul 15, 2013

  • AIME
    Coal - Shaft Sinking and Lining in the Southern Illinois Coal Field

    By J. W. MacDonald

    Review of equipment, performance, and shaft design plans including head-frames for sinking and forms for lining are given. Also included are comparative data for shafts of 11 x20 ft and 193/4 x 30 ft

    Jan 1, 1961

  • TMS
    Ultrasonic Characterization of Copper using Wavelet Analysis

    By S. Prasad

    The effectiveness of ultrasonic velocity measurements and attenuation of the propagating pulse was evaluated as a means of Non-Destructive characterization of cold worked and annealed copper. Commerci

    Jan 1, 2010

  • CIM
    Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinates

    By J. B. Boisvert, P. Oshust

    A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry

    Jan 1, 2008

  • AUSIMM
    Magnetite Recovery Using a Wet Drum Separator

    By Lyman G. J

    Magnetic separator operation in the recovery of magnetite in heavy medium circuits was studied by conducting a series of tests on a full size wet drum magnetic separator.The significant operational va

    Jan 1, 1983

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • SME
    Availability Of Coal For Efficient, Low-Cost Underground Mining In Illinois – Preprint 97-162

    By C. Treworgy, C. Chenoworth

    Geologic and technical factors such as coal seam thickness, stripping ratios, roof conditions, partings, faults, and size and geometry of the reserve block greatly impact the availability of Illinois

    Feb 24, 1997

  • SAIMM
    Effect of the strain rate and water stauration for the tensiles strength of rocks

    By I. Matsunaga, K. Aoki, W. -j. Jung

    Blasting is widely used in mining and basic construction because of its speed and economy to destroy the rocks. Blasting has the advantages of reduced excavation costs and shorted construction time wh

    Jan 1, 2003

  • AUSIMM
    Tungsten at Hatches Creek, Central Australia Mining and Treatment

    Local conditions at Hatches Creek are described, together with the mineralogy, mining and treatment of tungsten ores, with particular reference to procedures adopted by Pimer Mines, N.L.The Hatches Cr

    Jan 1, 1955

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011