Search Documents

  • ISEE
    High-wall Control at Anglo Gold Ashanti, Navachab Mine

    By Charles Pretorius, Henk Ludik

    Navachab Mine experiences difficulties with pit wall stability in certain areas of the mine. The main reason for the instability is the fact that the geology comprises many joints and faults. Blasting

    Jan 1, 2006

  • AUSIMM
    Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western Australia

    By Morabito J, Harrop D. W

    Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the

    Jan 1, 1981

  • SME
    Justifying API Bentonite Rheological Behavior Through Its Forming Size Fractions Mining, Metallurgy and Exploration (8673045d-721a-4112-8198-a3a9a24151ef)

    By A. A. El-Midany, R. M. Farag, A. M. Salem, S. E. El-Mofty

    Bentonite represents one of the main players in the stability of the drilling mud. Its particle size and particle size distribution affect the physical properties of the drilling mud especially the rh

  • AUSIMM
    Filtration of coal washery slurries using a horizontal belt filter

    By Slechta J. J

    An evaluation of a pilot scale Delkor horizontal belt filter at Bellambi's South Bulli Colliery showed high productivities and low moisture contents for a range of feed slurries. When treating fl

    Jan 1, 1986

  • CIM
    Automatic Control at the Strathcona Concentrator for Presentation to the Canadian Mineral Processors

    By D. M. Doyle

    "The Strathcona Concentrator operations, the application of control systems in the crushing, flotation and tailing fill sections, and current and future computer control concepts are described in this

    Jan 1, 1974

  • CIM
    The Business Case for LHD Automation at Kidd Creek ? the World?s Deepest Base Metal Mine

    By Zachary Mayer

    Agenda ? Kidd Mine ? Background ? Problem & Opportunity ? Challenges associated to depth - Production Rates - Productive Work Time - Operational Delays - Transfer Levels - Mucking Time - Impa

    Aug 1, 2013

  • NIOSH
    IC 7194 Mining And Milling Methods And Costs At The Yellow Pine Mine, Stibnite, Idaho - Mining Methods And Costs - Introduction And History

    By John D. Bradley

    Stibnite is 76 miles east of Cascade, Idaho, which is 78 miles due north of Boise. The altitude at Stibnite is 6,500 feet, and between Cascade and Stibnite the Forest Service road crosses two summits

    Jan 1, 1942

  • CIM
    Ensuring Safety of Autoclave Plants with Emergency Shutdown Systems

    By Murray Pearson, Jack Murray

    "The danger of autoclaves lies in the high temperatures and pressures that exist in autoclave vessels. The usage of autoclaves will continue to expand in the mining industry because of their efficienc

    Jan 1, 2009

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • NIOSH
    IC 6914 Mining And Milling Methods And Costs, Hog Mountain Gold Mining & Milling Co., Alexander City, Ala. ? Introduction

    By N. O. Johnson

    This is one of a series of-Information Circulars dealing with mining and milling methods and costs at mines in various districts in the United States. The Hog Mountain gold mining district is of th

    Jan 1, 1936

  • AUSIMM
    The Continuous Miner and its Application to Pillar Extraction

    By Monger N. R

    Factors leading to the decision to use Joy Continuous Miners for pillar extraction in the Burwood Colliery are outlined. A detailed description is given of the Joy 1-CM-2 Continuous Miner, including t

    Jan 1, 1957

  • SME-ICGCM
    Evaluation And Design Considerations For Pillar/Roof Separation In An Operating Coal Mine (3e69124f-30b4-40c5-9503-bd59304b248f)

    By Mike Amick

    As virgin coal reserves dwindle, more and more mines are being opened in areas with previous mining. As addressed in this conference before, there are solutions available for designing mines extracti

    Jan 1, 2009

  • SAIMM
    Plan compliance process for underground coal mines - Synopsis

    By A. A. Angelov

    This paper presents a unique method of monitoring the effectiveness of the planning process as well as the execution of mine plans. The method primarily determines the degree of deviation from the ori

    Jan 1, 2010

  • SAIMM
    Development Of A Vibration-Absorbing Handle For Rock Drills

    By J. P. D. Strydom

    The transmission of excessive vibration to the human body can cause physical stress that may result in crippling pain or permanent disability. Rock drills are known to transmit high levels of vibratio

    Jan 1, 2002

  • AUSIMM
    Magnesia from magnesite by calcination/carbonic acid leaching: Effect of magnesite/dolomite ratio

    By Moorrees C, Koh P. T, Tsambourakis G

    Calcination of samples from the Savage River region of Thsmania containing varying magnesite/dolomite ratios under conditions optimized for the magnesite component, followed by carbonic acid leaching

    Jan 1, 1987

  • DFI
    History Of Timber Piles And Preservation Techniques - A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982

    By Bruce Haldeman

    Timber has been used as pile support for structures for 6,000 years. Some means of preservation of wood go back almost that far. Timber piles support all types of structures ? some are buried below th

    Jan 1, 1984

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • ISEE
    Blast Master Plan: the Key to efficiency and optimization. Case study at Ellatzite copper mine.

    By Grigor Mishev, Georgi Petrov, Benjamin Cebrian

    Before designing a single blast or all the blasts on a pit level, it is critical to assess the main goal on each. To do this, a series of constraints must be taken into account: wall protection, vibra

    Jan 1, 2016

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • IIMP
    Technical software in mining: role, selection and future directions

    By Jean-Michel Rendu

    Computer systems are an integral part of the mining industry. Before a new operation is started, software requirements, and the need for hardware and communications must be determined. The personnel r

    Jul 17, 2000