Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mineral Resource Throughput Management: From An Iron Ore Mine To Steel In India (b7c708d0-4ac4-4078-9cb8-41844cba4156)
Mineral Resource Throughput Management is based on the extraction of the maximum potential value from an ore reserve with the emphasis to generate maximum ROI and ROR (return on reserve). A stee
Jan 1, 2007
-
Shaft Excavation Using the Borehole Rising Method
This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of
Jan 1, 1959
-
RI 8083 Recovery of Mercury From Cinnabar Ores by Electrooxidation - Extraction Plant Amenability Tests
By E. S. Shedd
Amenability studies were conducted by the Federal Bureau of Mines on an electrooxidation technique for the extraction of mercury from cinnabar ores, particularly those that are too low in grade to be
Jan 1, 1975
-
The Formation Of Misty Band Near The Substrate During Contact Angle Measurement
By Linli Wu
During the measurement of contact angle, a misty band was observed near the substrate. Hsien-Nan Ho and Shinn-Tyan Wu thought this was because the oxygen atoms on the interface migrate to the droplet
Jan 1, 2006
-
Advantages of Design in Drilled Displacement Type Piles in Tropical Porous Soil Deposits
By Jean R. Garcia, Paulo J. R. Albuquerque, Renato P. Cunha, Osvaldo Freitas Neto
"Abstract Results obtained from in-situ load tests carried out on drilled displacement piles sunk in a porous, lateritic and unsaturated soil deposit, are analyzed in this paper. Three slow-maintained
Jan 1, 2014
-
The Selection Of Excavation Methods For The Detroit Upper Rouge Tunnel Cso Control Project
By Jean Habimana
Complex and distinct geological units spread along the 7-mile long 30-ft inside diameter Upper Rouge Tunnel CSO Control Project in Detroit, Michigan. Its construction is divided in two tunnel construc
-
Expansion And Modernization Of An Iron Ore Pelletizing Plant In Northern Sweden
By M. Ahrens
The paper describes the main drive systems of an iron ore pelletizing plant and related important design aspects. It is shown how today?s drive systems provide the desired flexibility for the process
Jan 1, 2008
-
Secondary Recovery and Pressure Maintenance - Oil Recovery in Five-Spot Pilot Flood
By B. H. Caudle, L. G. Loncarie
Pilot flooding is one method of evaluating a proposed secondary recovery project. However, the amount and rate of oil recovery from an unconfined pilot area is not usually the same as from an equal ar
-
Innovative Approaches to ‘Wicked’ Problems – Resource Development and Communities in Western Australia’s Mid West
By A Buckley
Many policy issues facing the mining industry and affected communities are at a level of complexity that they can be called ‘wicked’ problems. The term ‘wicked’ in this context is used, not in the sen
Nov 22, 2011
-
IC 6119 Method And Cost Of Mining The Thick Freeport Coal In A Western Pennsylvania Mine
By J. W. Paul
This report is one of a series of papers on coal mining methods and costs which are being prepared through the sponsorship of the U. S. Bureau of Mines for the purpose of bringing to the industry a kn
Jan 1, 1929
-
Pneumatic Injection Of Solids Into Pyrometallurgical Processes: Past, Present, And Future
By J. Kirsch
Keywords: Pyrometallurgy, pneumatic transport, pneumatic transport Dense-phase pneumatic injection has begun to replace more traditional furnace-feeding systems. The paper describes the technology
Jan 1, 2006
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
OFR-17(3)-77 Conceptual Design Of An Automated Longwall Mining System - Volume I - Final Report ? Executive Summary
This report provides concepts for two automated longwall mining systems; one for operation in a 42 to 57-inch thick section of the Lower Kittanning coal seam, the other in a 57 to 72-inch thick sectio
Jan 1, 1976
-
Crown pillar risk assessment - planning aid for cost-effective mine closure remediation
By T. G. Carter, R. I. Miller
First, the influence of variation in the
Apr 1, 1995
-
How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste
By Don Welch
Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc
May 1, 2010
-
Patents and Litigation as Viewed by an Engineer
By William E. Greenawalt
IN these days of special legislation for the benefit of various industries one might well consider one branch of human endeavor intimately associated with engineering-that of patents and patent litiga
Jan 1, 1937
-
Improved Methodology For Contact Angle Measurements On Coal (Heterogeneous) Surfaces
By J. Drelich, M. Pawlik
An improved experimental procedure to measure contact angle has been consolidated with coal surface preparation involving polishing with abrasive paper, alumina powder, and a cloth, followed by ultras
Jan 1, 1999
-
Blasting Mitigation Measures Used to Control a Highwall Failure Risk
By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon
Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The
-
Experiences in Using Gas Dispersion Measurements to Understand and Modify Metallurgical Performance
By Jose R. Hernandez-Aguilar, Chris J. Martin, Rob Thorpe
"This study presents an approach to establishing relationships between metallurgical performance and the characteristics of the bubble population (gas dispersion) inside flotation cells. Bubble size D
Jan 1, 2006
-
Tunnel Excavation Grand Coulee Third Power Plan
By D. J. Duck
INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos
Jan 1, 1997