Search Documents

  • DFI
    The Soilex Pile System

    By Erik M. Westerberg

    The Soilex Pile combines a slender shaft, for quick and easy installation, with an enlarged pile toe, for high capacity. The key component is the Expander Body, which is inflated by injecting cement g

    Jan 1, 2000

  • AUSIMM
    A Synopsis of the Geology of the Lyell District, Tasmania

    IT is not intended that this paper should be regarded as an account of the geology of the Lyell district. It is merely a synopsis of some of the conclusions recently arrived at in regard to the strati

    Jan 1, 1927

  • NIOSH
    IC 8265 Bibliography Of Investment And Operating Costs For Chemical And Petroleum Plants, January-December 1964 ? Introduction

    By Sidney Katell

    This report covers the period January 1964 through December 1964; it is a continuation of the series that began with the publication of Information Circular 7516 in October 1949. Also, it is the sixth

    Jan 1, 1965

  • SME-ICGCM
    Prediction of First Weighting Distance in Longwall Coal Mining By 3D Numerical Modeling ? A Case Study

    By Haile Manteqi

    In longwall coal mines, estimation of roof strata condition, sequence of loading, and supporting requirements are of a high degree of importance, and they are directly related to production and safety

    Jan 1, 2012

  • AUSIMM
    Concentration Practice in the Australian Beach Sand Industry

    Beaches contain the residue of eroded rocks which have resisted weathering, and it is common to find in all beaches some of the harder, heavy minerals. The natural sorting action of waves and winds te

    Jan 1, 1950

  • ISEE
    Blast Design & Diagnostics Using Portable Solid State, High-Speed Videography Systems

    By Laura Bastemante, Bruce Vandenberg, Fred Huettig

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to loo0 frames per second. Up to 8 seconds of data can

    Jan 1, 1997

  • SAIMM
    Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System - Synopsis (0b7ce52d-2bd9-4f5e-84a7-9ce2b2e08562)

    By M. Le Roux

    Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli

    Jan 1, 2012

  • AUSIMM
    Approximation of Surface Area of Fines in Blast Induced Fragmentation

    Approximation of Surface Area of Fines in Blast Induced Fragmentation The surface area of fragmentation, especially in the finer size fractions, is a useful property to characterise the mechanisms of

    Sep 13, 2010

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • SME
    Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close Proximity

    By Kentaro Kuraji

    INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi

  • NIOSH
    IC 8265 Bibliography Of Investment And Operating Costs For Chemical And Petroleum Plants, January-December 1964 ? Introduction (0fd69596-cb9d-4e8b-9441-658493c22e16)

    By Sidney Katell

    This report covers the period January 1964 through December 1964; it is a continuation of the series that began with the publication of Information Circular 7516 in October 1949. Also, it is the sixth

    Jan 1, 1965

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • AUSIMM
    Leaching of Some Australian Nickeliferous Laterites with Sulphuric Acid at Atmospheric Pressure

    Sulphuric acid leaching at atmospheric pressure of a number of Australian nickeliferous laterites was examined in detail. The results obtained indicate that nickel can be extracted from these ores, al

    Jan 1, 1978

  • SAIMM
    High-order additions to platinum-based alloys for high-temperature applications

    By G. O. Rading, B. O. Odera, M. J. Papo, R. Couperthwaite

    "Platinum-based alloys are being developed with microstructures similar to nickel-based superalloys for potential high-temperature applications in aggressive environments. Since the chemistries of nic

    Jan 1, 2015

  • DFI
    Woodrow Wilson Bridge Cofferdams (ef6ed0b3-5c8c-41f1-8337-00ee57bff823)

    By Roderic A. Ellman

    The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.

    Jan 1, 2013

  • SAIMM
    Thermal Conductivity Of Solidified Manganese-Bearing Slags - A Preliminary Investigation

    By J. D. Steenkamp

    Keywords: Thermal, conductivity, diffusivity, expansion, history, density, specific heat capacity, industrial rich high-carbon manganese slag The thermal conductivity of slag is an important para

    Jan 1, 2011

  • SME
    Design And Development Of A Mobile Mining Machine

    By G. L. Dollinger, J. P. Kindsvater, J. A. Gibson

    DESIGN AND DEVELOPMENT OF A MOBILE MINING MACHINE INTRODUCTION Until recently, developing tunnels in hard rock has been accomplished either by the drill and blast method or by using large tunnel bo

    Jan 1, 1985

  • AUSIMM
    Notes on the Working of the MacArthur-Forrest Process for Extracting Gold

    In redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,

  • NIOSH
    RI 7198 Earth Pressure At Rest And One-Dimensional Compression In Mine Hydraulic Backfills

    By David E. Nicholson

    The Bureau of Mines has constructed a special compression chamber for developing stress-strain relationships of mine backfill and simulating the high compressive ground pressures encountered in underg

    Jan 1, 1968

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004