Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Analysis of Multiple Seam Stability

    By Christopher Mark

    Multiple seam interactions are a major ground control hazard in many U.S. underground coal mines. The two most common types are: ? Undermining, where stress concentrations caused by previous ful

    Jan 1, 2007

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    Coal Mine Ground Control in Western Europe; Past, Present and Future

    By D. N. Bigby

    This paper concentrates on ground control innovation in Europe since the first Morgantown conference, mainly from a UK perspective. In particular, it describes the rock engineering and ground control

    Jan 1, 2006

  • SME-ICGCM
    Development of Mains in Challenging Ground Conditions

    By Kot F. v. Unrug

    The present combination of coal market prices and reserves, situated in the Central Appalachian Coal Field, is such that mining of smaller coal reserve blocks has become economically attractive. In

    Jan 1, 2006

  • SME-ICGCM
    Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry

    By Peter Fischer

    Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi

    Jan 1, 2006

  • SME-ICGCM
    Ground Control and Safety Implications of Blast Damage in Underground Mines

    By Stephen Iverson

    The National Institute for Occupational Safety and Health (NIOSH) is currently performing research to help mine operators minimize the amount of loose or damaged rock surrounding a blasted opening. I

    Jan 1, 2007

  • SME-ICGCM
    Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield Pillars

    By M. P. Nesterov

    The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.

    Jan 1, 1998

  • SME-ICGCM
    Seismic Tomography, an Ideal but Immature Tool for Coal Bump Prediction

    By Erik Westman

    Coal bumps remain one of the industry?s most devastating but least understood phenomena. If changes to the internal conditions of the rock mass could be observed there is hope that bumps could be fo

    Jan 1, 2008

  • SME-ICGCM
    Ultra-Close Multiple-Seam Mining ? Analysis and Verification

    By Daniel W. Su

    This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int

    Jan 1, 2012

  • SME-ICGCM
    A Method For Determination Of Strength Of Coal Mass

    By Guo Junfeng

    The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst, and its prediction method. Up to now, there has not been a method for determi

    Jan 1, 1992

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • SME-ICGCM
    Indian Experiences Of Mechanised Coal Pillar Extraction (b04565f5-fd0b-4a80-a8aa-fcb98125fe52)

    By Arun Kumar Singh

    Wide variation in the nature of the coal seams and the surrounding rock mass of the Indian coalfields and very little information about the associated stress fields were observed to be the major hurdl

    Jan 1, 2009

  • SME-ICGCM
    Field Verification of the Roof Fall Risk Index: A Method to Assess Strata Conditions

    By Anthony T. Iannacchione

    The Roof Fall Risk Index (RFRI) is a new method introduced by the National Institute for Occupational Safety and Health (NIOSH) to assist the underground stone mine operator in 1) assessing defects t

    Jan 1, 2006

  • SME-ICGCM
    Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)

    By Brian R. A. Wood

    Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t

    Jan 1, 1992

  • SME-ICGCM
    STRATA III ? A Full-Spectrum Roof Control Concept

    By John H. Perry

    Strata III is a full-spectrum roof control system which provides the mine operator the ability to upgrade his roof control in place. The procedure is easily adaptable with current roof bolting techniq

    Jan 1, 1987

  • SME-ICGCM
    Coal Pillar Loading Mechanisms and Progress in Pillar Design

    By David Hill

    The Australian underground coal mining industry is increasingly operating in an environment that challenges traditional concepts of coal pillar design, against a background of heightened expectations

    Jan 1, 2008

  • SME-ICGCM
    The Use of Strata Management Techniques for the Optimisation of Secondary Support in Longwall Installation Roadways at United Colliery, NSW, Australia

    By Kieran Black

    The immediate roof lithology at United Colliery is extremely variable and provides a challenge for the design of secondary support. Support design in recent longwall installation roads at the mine has

    Jan 1, 2007

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006

  • SME-ICGCM
    Evaluation of the Effect of Length on Strength of Slender Pillars in Limestone Mines Using Numerical Modeling

    By Dennis Dolinar

    In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a

    Jan 1, 2007

  • SME-ICGCM
    Relationship between Mining Subsidence and Mining Depth in Strip Pillar Mining

    By Wenbing Guo

    Strip pillar mining method is one of the most important techniques for mining subsidence control in China. Mining depth is one of the most important factors that affect subsidence in strip pillar mi

    Jan 1, 2007