Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Assessment Of Noise Controls Commonly Used On Jumbo Drills And Bolters In Western Underground Metal MinesBy E. R. Reeves
The mining industry has recognized the importance of engineering controls as a primary means of preventing hearing loss. The noise control treatments most commonly observed on drills and bolters durin
Jan 1, 2004
-
Study On Comprehensive Utilization Of Secondary ResourcesBy Liang Ruilu, Guo Lihua
In light of the properties on process mineralogy of the old tailings in a certain copper mine in the People's Republic of China, a new process of combined reagent and stepwise flotation is applie
Jan 1, 1995
-
Modeling Of Ball Mill Product Size Distribution With Impact Energy Spectra Data (c6bbb939-3379-47fe-9029-6c85253c16c5)By A. Datta
An appropriate scale-up methodology is very useful for ball mill design and optimization of the grinding circuit. To date, the scale-up is based on the selection and breakage function model using lab
Jan 1, 1999
-
Budgeting: The Planning and Control ProcessThis chapter looks at the development and use of the operating budget. This is management's plan of action in the short term, usually one year. The operating budget includes all expensed producti
Jan 1, 1999
-
The Evaluation Of Natural And Anthropic Hazards On The Stability Of The Hydrosalt Complex In Costiui, RomaniaBy S. Zaharia
The authors present the state-of-the-art regarding natural and anthropic hazards on the stability of the saliferous Costiui basin. The factors that may potentially result in sliding, piping and collap
Jan 1, 2008
-
Analysis of Tunnel Grouting and Water Pressure Tests in Rampur Hydroelectric Project (412MW), SJVN Limited, IndiaBy Ramesh Kumar Chauhan, Umakant Sharma, Manwendra Pratap Singh, Ashok Kumar Chadha
The power sector in India has an installed capacity of 267.637 GW as on March 2015. Out of this total installed capacity, the hydropower sector contributes 41,267.43 MW as renewable energy source. The
Jan 1, 2016
-
Selection and Sizing of Non-Sedimentation EquipmentBy M. Moss Stanley, Ronald P. Klepper
The objective of this chapter is to provide data that will assist in the selection and sizing of equipment utilized in the filtration method of separating solids from liquids. It should be recognized
Jan 1, 1986
-
Assessment Of Chemical Composition, Potential Mobility And Toxicity Of Elements In Water, Sediments And Evaporated Salts Of Mine Evaporative PansBy E. M. Cukrowska
The evaporative pan complex consists of two adjacent seasonal pans. These pans carry an exceptionally high salt (TDS) load due to over 50 years of effluent discharge via the pipeline from mines. The n
Jan 1, 2006
-
Stability Analysis Of A Room-And-Pillar Mine With Thinly Laminated Roof, Strong Pillar, And Weak FloorBy D. W. Park
Underground room-and-pillar mining operations in the Warrior Coal Field in Alabama frequently suffer instability due to soft floor and thinly-laminated immediate roof. The investigation covered by thi
Jan 1, 1991
-
Problems And Solutions In Surface Subsidence Monitoring Using A Total StationBy Y. Luo
Surface subsidence monitoring is the most effective means for investigating the nature of, and developing the techniques for predicting, the surface movement and deformation process. However, because
Jan 1, 1992
-
Environmental permitting considerations for true in situ copper mining in ArizonaBy R. E. Weeks, D. J. Millenacker
Utilization of true in situ technologies for mining copper in Arizona will involve a complex environmental permitting process. This process is a key factor in determining the feasibility, costs, and i
Jan 1, 1987
-
Technical Notes - Calculating optimum number of stages in continuous countercurrent decantation (CCD)By A. Zomosa
In the operation of continuous countercurrent decantation it is well known that an increase in the number of thickeners results in an increase of the fixed costs. But inversely it happens that the var
Jan 1, 1991
-
Numerical study of scale effect using a dynamic random lattice modelBy C. Yao, T. M. Yegulalp
The scale effect on rock properties has been discussed and studied since the introduction of the weakest-link idea by Weibull (1939). In this study, the capabilities of a dynamic lattice network model
Jan 1, 1999
-
Preliminary Design And Analysis Of Recovery Of Lithium From Brine With The Use Of A Selective ExtractantBy Vi-Duong Dang
Lithium requirements in the next few decades for batteries and controlled thermonuclear fusion reactors (CTR) may exceed the availability of the current mineral and brine reserves. It is thus prudent
Jan 1, 1978
-
3. Computer-Assisted Mineralization Modeling at Kennecott Copper Corporation ? IntroductionBy R. K. Davey
Before the introduction of computerized procedures, mineralization modeling (compilation of level maps), ultimate pit studies, ore reserve compilations, and long-range mine planning all were performed
Jan 1, 1979
-
The Design and Operation of an Underground Conveyor Utilizing Intermediate Booster Drives With DC Motors And ControlsBy Robert J. Wise, Mark Alspaugh
Underground longwall coal mines depend on conveyor haulage to transport large volumes of coal from the longwall face conveyor to the mine portal. In the last few years, the need for longer and larger
Jan 1, 1993
-
Statistical Control For The Production Of Assay Laboratory StandardsBy C. Widham
Introduction It is generally accepted as dogma that sampling contributes most of the error in gold fire assays. Differences in assay results on pulps from the same sample interval are frequently rega
Jan 1, 1997
-
Flotation Plant Material Balance Computation: A Step Towards Optimizing Fine Particle RecoveryBy T. Negeri, Y. Breau, M. Plante, A. Orumwense
As part of a joint project on fine particle processing, sponsored by the Consortium de Recherche Minérale (COREM), Natural Resources Canada (NRCan) and Hydro-Quebec, two flotation plant circuits were
Jan 1, 2003
-
Stability Analysis Of A Room-And-Pillar Mine With Thinly-Laminated Roof, Strong Pillars And Weak FloorBy Park. D. W., Y. M. Jiang, L. A. Morley, W. Keeton
Underground room-and-pillar mining operations in the Warrior Coal Field in Alabama frequently suffer instability due to soft floors and thinly-laminated immediate roofs. This investigation concerns a
Jan 1, 1993
-
Assessment of Potential Domain of Roof Fall in Coal Mine Entry with Probability-Based Dynamic Programming ApproachBy Felicia F. Peng, Victor Z. Sun, Syd S. Peng
A probability-based analysis method in conjunction with the finite element structure modeling technique to evaluate an entry system stability is developed. Variability of the rock properties and loadi
Jan 1, 1996