Relating High-Resolution Tilt Measurements To The Source Displacement Of An M2.2 Event Located At Mponeng Gold Mine
By P. Share
As part of JAGUARS (JApanese-German Underground Acoustic emission Research in South Africa), high-resolution tiltmeters were installed during 2007 at Mponeng gold mine, South Africa, in an attempt to
Oct 1, 2013
-
FISH - State-Of-The-Art Technology In Final Diamond Recovery
By L. du Plessis
The name FISH (Fully Integrated Sort House) refers to a class of technology deployed at Jwaneng Mine final diamond recovery. The FISH concept is based on three pillars, namely: ?Improved sorting ef
Jan 1, 2003
-
Shear behaviour of graphite infilled joints based on Constant Normal Stiffness (CNS) test conditions
Due to the reduction in frictional resistance, the characteristics of joint infill have a major role to play on rock mass instability. This paper elucidates the laboratory behaviour of graphite infill
Jan 1, 2003
-
Variance Propagation In Toll Smelting Operations Treating Multiple Concentrate Stockpiles
By C. J. Cutler
Metallurgical accounting for toll treatment smelters pose a number of challenges. Multiple feed stockpiles have to be accounted for as part of the monthly recovery estimation. Moreover, multiple metal
Jan 1, 2006
-
The Effect Of Underground Mine Water On Performance Of The Mufulira Flotation Process
By D. E. Ng?andu
The experience of Mufulira concentrator, of the Zambia Consolidated Copper Mines Limited, with underground mine drainage water, which is used in milling operations is discussed. It is shown that the u
Jan 1, 2001
-
A Heuristic Sublevel Stope Optimizer With Multiple Raises
By X. Bai
A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def
Jan 1, 2014
-
Estimating the modulus of elasticity of the rock material from compressive strength and unit weight - Synopsis
By I. Ocak
The modulus of elasticity of rock material (Ei) is an important rock property that is used as an input parameter in the design stage of engineering projects such as dam and tunnel constructions, minin
Jan 1, 2008
-
Managing The Geotechnical And Mining Issues Surrounding The Extraction Of Small Pillars At Shallow Depths At Xstrata Coal South Africa ? Synopsis
By S. Z. Pethö
Pillar extraction at shallow depths with small pillars that were not originally intended for secondary extraction can provide a huge benefit to the coal mining industry in those areas where a signific
Jan 1, 2012
-
Preliminary Study Into A Mechanized Resue Mining Method For Deep Level Mining
By R. G. B. Pickering
Resue mining was practiced extensively in the East Rand in the first half of this century. The obvious benefits were that a higher grade of ore was trammed to the surface. The disadvantages were slow
Jan 1, 2000
-
Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite Mine
By Vinay Kumar Agrawal, Rama Nath Praharaj
IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh
Jan 1, 2007
-
Technical skills?a major strategic issue - Synopsis (fe76e3c8-f6c3-411a-a6dd-39c52c339bd0)
A shortage of technical skills in all areas of the mining industry is being experienced worldwide. This has significant consequences for design, operations, productivity and safety and, therefore, nee
Jan 1, 2008
-
Mine seismicity: prediction or forecasting? - Synopsis
By S. M. Spottiswoode
Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a sma
Jan 1, 2010
-
Development of a gravity flow numerical model for the evaluation of draw point spacing for block/panel caving - Synopsis
By R. L. Castro
Block caving methods, when operated under favourable rock mass conditions, can achieve higher production rates and lower operating costs than other various existing underground mining applications. Fo
Jan 1, 2009
-
Comminution Research At The University Of Cape Town
Comminution is a vital part of minerals extraction, and therefore of the South African economy. The high cost and throughput-limiting nature of comminution forms a strong motivation for research direc
Jan 1, 1998
-
New Opportunities - Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces
By M. Hopf, E. Rossouw
Keywords: Pyrometallurgy, furnace, copper coolers, freeze lining, monitoring, Saveway The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallu
Jan 1, 2006
-
Extending Empirical Evidence Through Numerical Modelling in Rock Engineering Design
Models are used in engineering to reproduce reality as faithfully as possible so that the expected response of a system for given actions or inputs can be determined. In the field of rock engineering,
Jan 1, 2014
-
A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop Colliery
By R. Lombard
"Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po
Jan 1, 2015
-
Technical skills?a major strategic issue - Synopsis
A shortage of technical skills in all areas of the mining industry is being experienced worldwide. This has significant consequences for design, operations, productivity and safety and, therefore, nee
Jan 1, 2009
-
Keynote Address: 6th International Symposium For Rock Fragmentation By Blasting
By D. Diering
Having agreed to perform this task, I naturally started to wonder what on earth I was going to talk about, and on reviewing the literature I was surprised at how little I knew and how much I?d forgott
Jan 1, 2000
-
A Twin-Cathode Dc Arc Smelting Test At Mintek To Demonstrate The Feasibility Of Smelting FeNi From Calcine Prepared From Siliceous Laterite Ores From Kazakhstan For Oriel Resources Plc
By H. Lagendijk, I. J. Reinecke
Mintek was contracted by Oriel Resources plc in 2004 to conduct a preliminary assessment study on smelting ferronickel from the large but relatively low grade Shevchenko nickel ore deposit in Kazakhst
Jan 1, 2007