Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Microseconds Matter in Monitoring

    By Gregory B. Poole

    Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on

    Feb 1, 2020

  • ISEE
    Dual Delay Detonators: a Practical Solution to Blasting Problems

    By John T. Watson, Jim Bailey

    Increasing public awareness is probably the single most important challenge faced by any blasting contractor today. This increased awareness usually results in an outcry for tighter regulations and r

    Jan 1, 1990

  • ISEE
    Controlled Explosive Fracturing

    By Ulrich Leiste

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    Blasting in Tunneling

    By Midori Sakamoto, Nobuaki Sakuma, Tsuyoshi Murashita

    Recently, tunnel blasting works near the residential area and existing building are increasing and environmental problems caused by vibration have become serious public concern. In order to solve thes

    Jan 1, 1998

  • ISEE
    Missouri Quarry Productivity Improvement - Casework

    By Lawrence Mirabelli, William Hissem, Gary Veltrop

    Capital Quarries Company, Inc., Jefferson City MO produces aggregate products for road base, asphalt, concrete and concrete block. With their production quantities small in comparison to those produce

    Jan 1, 2009

  • ISEE
    How to Achieve 100% of Advance in Tunnel

    By Alan Diaz Butron, Eng. Thierry Bernard

    "In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by

    Jan 1, 2017

  • ISEE
    Reducing Coal Damage And Loss With A New Blasting Technology

    By Tapan Goswami, Lloyd Hain, Geoff Brent

    For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have pro

    Jan 1, 2008

  • ISEE
    Controlled the Blasting Performance with Electronic Detonator near High Voltage Tower (SUTET) using Signature Hole and Scale Distance Regression Analysis (A Case Study: Coal Mining in Indonesia)

    By Raden Haris Handayana, Jihan Farhan Lubis, Milia Putri, Tengku Deli Hamonangan Hasibuan, Sani Salahudin

    An environmental issue that must be controlled from coal overburden blasting near the structure is ground vibration. Damaging ground vibration is the effect exerted from residual energy from blasting

    Feb 6, 2023

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance Intervals

    By Perry Sisk

    In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla

    Jan 1, 2013

  • ISEE
    Evaluation of Schedule IV-Type Containers

    By D Wilson, E Nagy, R A. Augsten, R R. Vandebeek, R L. Guilbeault

    The Canadian Explosives Research Laboratory (CERL), is evaluating the status of the Schedule IV explosives container as it presently pertains to the industry. The Schedule IV container serves the same

    Jan 1, 1990

  • ISEE
    Comparison of Micro-Inch In-Plane and Out-of-Plane Resoponse of Cracks to Blast Vibration and Weather

    By Jeffrey Meissner, Mike Waldron, Charles Dowding

    Most studies of crack response have focused on opening and closing of a crack in the plane of the wall in which the crack occurs. Crack movement also occurs perpendicular or normal to the plane of the

    Jan 1, 2010

  • ISEE
    Control of the Flyrock and Vibrations for the Protection of Electrical Installations

    By Jorge Cárdenas, Piero Mejía, Diego Gamarra

    The present case study details the solution to a complex situation in a mining operation, involving the challenge of expanding the tailings storage facility in high-criticality areas adjacent to elect

    Jan 21, 2025

  • ISEE
    Rational Methodologies for Setting Blast Vibration Limits for Houses

    By Adrian Moore, Alan Richards

    "It has been common practice to set blast vibration limits for structures using an “observational”approach whereby limits are set at a level based on observations of damage, or the lack ofdamage, comb

    Jan 1, 2013

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • ISEE
    JKVBOC Blast Movement Model Applications for Ore Control at Open Pit Mines

    By Constanza Bujes, Mark Jones, Graham Crook, Yansan Jamyanbaatar, Sedat Esen

    Tracking ore characteristics such as grade and hardness from its original position into the material handling and processing stages remains one of the key challenges in open pit mining of hard rock de

  • ISEE
    Journal: Old South Pole Demolition

    By John Horgan, Ethan Marcoux

    Explosives have been used to demolish many unsafe structures around the world. However, it is unlikely any demolition job has ever involved destroying buildings already buried 40 feet (12 meters) into

    Jan 1, 2015

  • ISEE
    Contour Blasting in Tunneling: the Role of Drilling Precision

    By Mauro Fornaro, Marilena Cardu, Renato Mancini, Daniele Castano

    Tunneling by explosive blasting in civil works isn't merely intended to break somehow a way through the rock, rather to drive a permanent, constant cross section, lined way. The current mechanical exc

    Jan 1, 1992

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019