Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Controlling Thermal Stresses in Barrier Walls
By Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Small-Strain Behaviour of Artificially Cemented Sand in Deep Mixing Application
By Stephen Darmawan, Mahdi M. Disfani, Arul Arulrajah, Alireza Mohammadinia
Deep mixing using cementitious compounds is an in-situ method of ground improvement for improving the strength, compressibility of loose sand. Artificial light cementation can increase the stiffness o
Jan 1, 1900
-
Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai
By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu
"This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber
Jan 1, 2015
-
UB Digs Deep and Builds Over Adjacent Subway for New Medical Building Hub
By Lisa R. Papandrea, David Chen, Walter E. Kaeck
"Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro su
Jan 1, 2016
-
Cutter Soil Mixing and Augered-Cast-In-Place Piling Close to the Gulf of Mexico
By Justin Simmons, Michael Arnold, Bob Faulhaber
"In order to remodel an existing beach resort on the Gulf of Mexico, an existing three story structure, founded on stepped tapered piles, was to be replaced by a ten-story building with service rooms
Jan 1, 2017
-
East Boston Branch Sewer Relief Project: Support Of Excavation Case Study
By Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)
By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
Foundation Contracts And Law - Part -1: Relevan[i] Law
By Kirty Dave
Foundations in any contract are the most uncertain parts of the contract and most of the "Construction-Contract-Disputes" are either directly related to foundations or arise as 'Side-effects of c
Jan 1, 1996
-
Best Practices for Soil Mixing Near Sensitive Structures
By Joseph A. Mann
"Soil mixing is a proven solution for the construction of ground improvement adjacent to sensitive structures due to the use of computer controlled and monitored equipment. The precision to which geom
Jan 1, 2015
-
Pile Shaft Capacity from Cone Penetration Test (CPT) Records; Considering Scale Effects
By Abolfazl Eslami, Sepide Lotfi, Mohammad M. Eslami
"Via direct CPT methods for pile capacity prediction, correlation coefficients smaller than unity are used to relate cone tip resistance (qc) and sleeve friction (fs) to pile toe capacity (rt) and sha
Jan 1, 2015
-
State-Of-Art Working Platform For Heavy Equipments Used For Deep Foundation Construction
By Arunsiva R., Sivaranan S., Venugopal B., Kumaran M.
Being a rapidly developing country, India is undergoing a massive infrastructure phase change remarkably. The construction industry is already set to boom, but the time and space constraints necessita
Sep 1, 2022
-
Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building
By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros
"This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p
Jan 1, 2016
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris Project
By Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, California
By Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Strength Behavior of Soilcrete Improved by Cement and Metakaolin
By Guo Qian, Du Guangyin, Deng Yongfeng, Liu Songyu, Wang Ningping
"Metakaolin (MK) can efficiently enhance the strength and the impermeability of concretes and mortars. However, it has rarely been attempted in admixtures of cement-stabilized soils until presently. A
Jan 1, 2015
-
Evergreen Line Rapid Transit Project: Analysis and Design of Deep Soil Mix Panels to Mitigate Seismic Lateral Spreading
By E. Naesgaard, Brian E. Hall, A. Amini, Advanced Geosolutions, A. Azizian
"A 2 km section of the Evergreen Line Rapid Transit Project is supported on improved ground consisting of cement deep soil mix (CDSM) panels because of highly variable and challenging soil conditions,
Jan 1, 2015
-
High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven Methods
By Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda
The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re
Oct 1, 2022
-
Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft
By Stephen Buttling
The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc
Nov 1, 2022
-
Level Crossing Removal Project – Package 1
By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900