Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Observed Driving Performance of Open-Ended Steel Pipe Piles with and Without Plugged Toes

    By Chu E. Ho, Paul Napoli

    This paper presents the performance of nineteen open-ended steel pipe piles driven through highly variable overburden soils into glacial till and schist bedrock. The piles were 16 inches in diameter a

    Jan 1, 2019

  • DFI
  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • DFI
    Errata - Performance Of A Large Diameter Drilled Pier

    By A. J. Partos

    Table 4, Page 311 Table 4 Experimental Parameters from Straight Line Interpretation of Mohr Failure Envelope [ ]

    Jan 1, 1991

  • DFI
    Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea Bissau

    By Frédéric Rocher-Lacoste

    On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da

    Jan 1, 2008

  • DFI
    SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction Event

    By Richard T. Stain

    "In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred

    Jan 1, 2005

  • DFI
    High Capacity Micropiles in Weak Dolomitic Limestone for Crane Foundation Support – A Case History in Temporary Foundations

    By Brian D. Barkauskas, Terence P. Holman

    A major combined nuclear and coal-fired power plant, located in on the western coast of Florida has undergone multiple upgrades in recent years to increase power output and enhance environmental contr

    Jan 1, 2017

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • DFI
    A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design Specifications

    By Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.

    In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re

    Oct 1, 2022

  • DFI
    Systematic Evaluation of Driving Criteria and Performance of Tapered Piles in Glacial Sand

    By Terrence M. Carroll, Chu E. Ho, Dimitrios Niarchos

    "Construction of the new extension to Terminal 4 at John F Kennedy International Airport in Queens, New York involved the application of tapered piles for foundation support. Initial design based on p

    Jan 1, 2017

  • DFI
    Specialty Geo-Engineering in a Caisson Town

    By William H. Walton, Joel Dellaria, Jeffrey R. Hill

    The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The

    Jan 1, 2019

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • DFI
    Cost and Technical Comparison of Non-Destructive Test Methods for Drilled Shafts

    By Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt

    Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented

    Jan 1, 2019

  • DFI
    Foundation in Simsima Lime Stone for an Underground Reservoir

    By Chandramohan P. V., Ravi Kishore

    "An underground reservoir was to be constructed at Doha in Qatar. Simsima lime stone is present at the bottom. When the reservoir is empty, there will be uplift at the bottom but this will change to d

    Jan 1, 2017

  • DFI
    Evaluation of Elongation Criteria and Friction Loss in Ground Anchors

    By John P. Turner, Benjamin J. Turner

    "This report describes a research project for evaluating the applicability of the widely accepted 80 percent criterion for elongation of ground anchors to anchors with unbonded lengths exceeding 100 f

    Jan 1, 2017

  • DFI
    Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods

    By Ali Azizian, Brian Hall

    "Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir

    Jan 1, 2016

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2013

  • DFI
    Anchored Hollow Bar Tangent Pile System For Underpinning

    By Marco D. Boscardin, Benjamin H. MacKinney, Kenneth R. Allard, Kenneth A. Pidgeon, Adriane G. Boscardin

    This paper presents a case history for a unique application of a system of vertical micropiles with horizontal soil nail bracing and shotcrete facing for underpinning. The system was used to support a

    Oct 1, 2022

  • DFI
  • DFI
    Optimization of Design of Drilled Shaft Foundations by Lateral Load Testing (94ee84ca-5eda-40d1-bba2-d7742a925002)

    By Donald R. Clark

    "Drilled shafts are being used as foundation support for parabolic solar troughs at the Genesis Solar Project being constructed near Blythe, California. Three types of drilled shaft foundations are re

    Jan 1, 2017