    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration Standards

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)

    By Tracy Brettmann

    Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2004

  • DFI
    Wharf Reconstruction At Gasps Sandy Beach - Historic

    Port Gaspé is located on the back side of Gaspé bay and is protected by a natural sand barrier with a length of 2,5 km, from which it got its name, Gaspé Sandy Beach (1). Since 1904 the Gaspé regi

    Jan 1, 1987

  • DFI
    Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction

    By R. G. Horvath

    In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h

    Jan 1, 1987

  • DFI
    Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis

    By A. M. Hanna

    This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp

    Jan 1, 2010

  • DFI
    Wave Equation Analysis And Dynamic Monitoring - A Presentation At The Deep Foundations Institute?McGill University Symposium Montreal, September 1983

    By Bengt Fellenius

    The conventional wave equation analysis without control of the representativeness of the parameters to the actual conditions does not provide accurate results. However, the representatives can be vast

    Jan 1, 1984

  • DFI
    Thermal Integrity Profiling Of Drilled Shafts

    By Gray Mullins

    The construction of drilled shafts as well as other cast in place foundation alternatives relies heavily on good practices from the contractor, engineer, and inspector in order to produce a quality fo

    Jan 1, 2010

  • DFI
    Use Of Auger Pressure Grouted (APG) Piles Inside An Existing Operational Structure

    By Lawrence P. Goldfarb

    The City of Alexandria, Virginia, Public Safety Center (PSC) is a 64,000 square foot facility that houses the Police Department, Office of Sheriff and the Office of Magistrate. In addition, the center

    Jan 1, 2009

  • DFI
    Presentation #4 - Reflections On Pile Integrity Testing

    By Joram M. Amir

    Even when they are cased! [ ] In bored piles, as well as in drilled shafts, and in caissons too, defects will occur! [ ]

    Jan 1, 2001

  • DFI
    Some Problems Encountered During Pile Installation - Synopsis

    By [D. N. ] Naresh

    During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som

    Jan 1, 1996

  • DFI
    Augered Cast-In-Place Piles Deep Foundations Institute (DFI) 1988 Annual Meeting - Ritz-Carlton Hotel In Atlanta (Buckhead), Georgia

    By James J. Neate

    The augered cast-in-place pile system came into use in the late 1940's where various techniques were tried using pressure grouting methods. In the early development stages some piles were install

    Jan 1, 1988

  • DFI
    A Case History Studying On Displacement Controlling In Deep Excavation

    By Feng Yongxuan

    Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me

    Jan 1, 1991

  • DFI
    Experiences With Deep Foundations In Shanghai - Synopsis

    By Y. X. Tong

    The simplicity off Ø=0 analysis has been taken advantage of to evaluate the geotech­nical problems of open caissons, slurry trench walls and piles in Shanghai. Undrained shear strengths obtained by va

    Jan 1, 2010

  • DFI
    A New Method Of Analysis Of Pile Displacement In Soil With Respect To Time

    By M. England

    A method for the analysis and prediction of single pile displacement behaviour is described. It is the displacement in time, under constant load, based on the use of hyperbolic functions to characteri

    Jan 1, 1993

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Base Grouted Piles - Mr. P. M Cashman, Independent Consultant

    By W. J. Kingwell

    My comments and questions are addressed to Mr. Troughton. It seems to me that the tests were very well tailored to determine long term effects on performance of bearing piles as groundwater pressures

    Jan 1, 1991

  • DFI
    Re-Use Of Foundations And The Role Of NDE Techniques

    By Huw Williams

    It is becoming increasingly common practice to re-use existing foundations for new projects, especially on urban sites where geotechnical conditions are congested. A knowledge of the foundation dimens

    Jan 1, 2006

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at