Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007

  • DFI
    Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil

    By Sangseom Jeong, Moonkyung Chung, Junyoung Ko

    "Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze

    Jan 1, 2014

  • DFI
    The Effect Of Drilling Fluid On Axial Capacity, Cape Fear River, NC

    By Dan Brown

    Two drilled shaft foundations were subjected to axial load tests in order to measure the influence of drilling fluid on performance. Other than the differing drilling fluids, the shafts were construct

    Jan 1, 2002

  • DFI
    The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station

    By H. F. Cowie

    Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of

    Jan 1, 1989

  • DFI
    Diaphragm Walls Seismic Design According to the Eurocodes

    By J. Matos e Silva

    "Abstract Although one can think that it is very low the probability of a seism occurrence during the execution of an excavation in an urban lot protected by a diaphragm wall curtain, reality shows th

    Jan 1, 2014

  • DFI
    Developments For Mitigating Measures From Deep Shafts Of North/South-Line Amsterdam

    By Klaus Pöllath

    This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions

    Jan 1, 2006

  • DFI
    Single Pile Settlement Prediction And Analysis For Driven Piles

    By David R. Beadman

    The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid

    Jan 1, 2006

  • DFI
    Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted Micropiles

    By Tom Szynakiewicz

    Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea

    Jan 1, 2008

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989

  • DFI
    A Cut And Cover In Stiff Clay In Eurre-France - Synopsis

    By R. Stenne

    This paper deals with a complementary soil investigation which being part of the contract helped understand the behavior of a softened clay and adjusted the design of a retaining structure accordingly

    Jan 1, 2000

  • DFI
    Large-Scale Earthquake-Induced Landslide Repair Following New Zealand’s Kaikoura Earthquakes

    By Mathew Avery, Colby Barrett

    In November 2016, a 7.8-magnitude earthquake caused more than 100,000 cubic meters of rock and debris to tumble down and bury the transportation infrastructure below Ohau Point in New Zealand. All rou

    Jan 1, 2018

  • DFI
    Approach To Reliability Based Design On Deep Mixing Improved Ground

    By Masaki Kitazume

    Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be

    Jan 1, 2004

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    Lateral Pile Load Testing Under Cyclic Loads

    By Dan Brown

    This paper presents a case study of a cyclic lateral pile load testing program performed on two 18-in square prestressed concrete piles (PSC) in Savannah, Georgia. The load test program was developed

    Jan 1, 2003

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002