Application Of Large Diameter Pile Foundations To Factory Building
By Wang Mingshu
The pile foundation is a kind of advanced foundations in the filled or soft soil. In this paper, through the actural engineering of coal dressing plant of Western Opencast Coal in Fushun built on the
Jan 1, 1991
-
Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine
By Stephan Fisch, Franz-Werner Gerressen
"The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining
Jan 1, 2017
-
Effect of Axial Compression on Lateral Pile Response: Laterally Loaded Test Pile Comparison
By David S. Graham, Joseph D. Bailey, Paul J. Axtell, Michael K. Muchard
"Two instrumented test piles were simultaneously subjected to a static lateral load test by jacking the piles apart. One of the piles was loaded in axial compression via kentledge during the lateral l
Jan 1, 2017
-
Hammer-Grout Piles At The Bronx-Whitestone Bridge
By Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data Collectors
By Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Case History: Innovative Load Test Program Optimizes Pile Capacity In Challenging Ground Conditions
By Emad Farouz
This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Plan
-
Wick Drain Guide Specification (Method)
"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Corroboration and Remediation Options
"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Blast Densification Of Fine Tailings
By Brian W. Wilson
A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a
Jan 1, 2010
-
The Keys to Success in Waikiki
By Alison Savage, Michael Terry
"For decades, the International Market Place (IMP) has been an icon in the heart of Waikiki in Honolulu, Hawaii. It was famous for Duke Kahanamoku’s restaurant where people flocked to hear Don Ho sing
Jan 1, 2016
-
Load Tests Of Bored Piles In Weathered Bedrock
By James C. Scott
Compression and tension load testing were performed on bored concrete piles installed to depths of 18 to 34 meters below excavation levels for a large mixed-use development in Kuala Lumpur, Malaysia.
Jan 1, 2007
-
Bluestone Dam Safety Assurance Program: An OPA Runner Up
By Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
A Collaborative Approach To The Design And Delivery Of The Most Heavily Loaded Piles Ever Constructed In The Uk
By Morris J. D, Baldwin Z., Wiltcher P. M
21 Moorfields is an oversite development in central London spanning Moorgate tube station. It required the installation of both the highest loaded bearing piles and the highest top loaded static pile
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp
By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
Cased Auger Piles (CAP): An Effective Piling Solution
By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
High Strain Testing Of Large Diameter, High Capacity Unlined Bored Piles ? Introduction
By Dhanvin B. Mehta
Pile testing is generally understood as static load test. It is our common experience that for high capacity, large diameter bored piles, static testing is expensive and time consuming. It is practica
Jan 1, 1996
-
Novel Methods Of Restraining Embedded Retaining Walls
By Abid Adekunte
Traditionally, designers and contractors provide additional external supports to retaining walls through the use of tie-back anchors or braces. Both approaches are known to have their shortcomings; br
Jan 1, 2010
-
D-Wall Extreme – Contrast Between Going Deep And Getting Small
By Alexander Blatt, Franz-Werner Gerressen
Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep groundwater barriers, named Cut-Off-
May 1, 2022
-
Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project
By Richard Hanke, Franz-Werner Gerressen
"The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re
Jan 1, 2015
-
Foundation Performance of Millennium Tower in San Francisco, California
By John A. Egan, Nathaniel Wagner, Micaela Largent, Jonathan P. Stewart, Debra Murphy, Jeremy Butkovich
The Millennium Tower is a 58-story reinforced concrete building that was constructed in San Francisco, California between 2005 and 2009. The Tower is founded on an embedded pile supported mat with pil
Sep 8, 2021