Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility
By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke
"The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
A study of copper smelting reverberatory furnace design and performance and methods available for increasing throughput
By M. A. T. Cocquerel, M. G. Burcher, J. G. Eacott
"This paper is based on work carried out to examine the feasibility of increasing the smelting rate of two oil-fired calcine-charged reverberatory furnaces . Various constraints prevented physical enl
Jan 1, 1980
-
An Internet Model for Continuing Education in Mining
By Simon W. Houlding
The mining community is geographically remote and widely dispersed. There is a growing requirement for formalized professional development of members by professional associations, and increasing recog
May 1, 2002
-
Radon Decay Products and their Application to Uranium Exploration
By Cardm Jeffrey W.
The decay of 222 Rn yields a series of short-lived decay products which become attached to the surface of a plate or wire exposed in a 222Rn-bearing atmosphere. The alpha-activity of two of the decay
Jan 1, 1979
-
Switched Reluctance Drive: The Ideal Feeder Drive
By Svato Prochazka
Content: ? commonly used drive systems ? drive system efficiency ? introduction to SR technology ? SR drive system advantages Commonly Used Feeder Drives Technologies ? VFD + induction motor ?
May 1, 2010
-
Antimony Milling at Consolidated Durham Mines and Resources Limited
By B. St. Pierre
"The alchemists' symbol for antimony is a diamond with a dot in the centre. The latin name ''stibium'' gives this mineral its chemical symbol ""Sb"" and the name to the principal ore containing antimo
Jan 1, 1977
-
Yield Stress Measurement of Cemented Paste Backfill with the Vane Method and Slump Tests
By A. S. Moghaddam
The transportation of cemented and non-cemented mine tailings in the form of paste through pipelines is one of the main stages of paste backfill operations. For the purpose of pipeline design, the rhe
May 1, 2007
-
Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience
By Colin Lindsay
"The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo
Jan 1, 2001
-
In situ testing in underground backfilled stopes
By Malcolm Scoble, Jean-Marc Robert, Luciano Piciacchia
"An approach to the in situ testing of mine backfills is outlined. It has been developed to provide a measure of the effective strength and stiffness of such materials after placement in stopes. This
Jan 1, 1987
-
Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation
By Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora
"This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support
Jan 1, 2010
-
Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines Limited
By G. Halverson, K. Blower
"Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per
Jan 1, 1987
-
Pipe Ore Processing Developments in the Thompson Mill
By P. G. Claridge, R. A. Tenbergen
"Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a
Jan 1, 1975
-
A Geomorphic Approach for the Design of Drainage Systems on Reclaimed Mine Areas
By Anil K. Beersing
Effective drainage systems are required for reclamation of mine-disturbed areas to control surface water runoff and avoid excessive erosion. For the conventional structural design approach, armouring
Apr 1, 2005
-
The use of wetlands for effluent polishing at Placer Dome, Campbell Mine
By Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
Condition Monitoring and Basic Maintenance?. One Without the Other?
? Founded In 1953 ? Mining growth of 83% since 2007 ? We produced over 1 million ounces of Au in 2012 ? We Forecast of 20% Au production in 2013-2015 ? We have paid a dividend 31 years consecuti
Aug 1, 2013
-
Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes
By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne
"The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers
Jan 1, 2003
-
Benchmarking Red Dog Ores using Modal Analysis and its Correlation with Observed Metallurgy
By David Lin
"Modal data from Red Dog Main Pit ores were collected and analysed on a size-by-size basis. The Main Pit data were compared to data from composite samples of Red Dog Aqqaluk ores. The data revealed th
Jan 1, 2002
-
Minimizing the economic unit cost of dragline-truck-shovel operations at Yatagan-Eskihisar open pit mine, Turkey
By C. O. Aksoy
There is a long history of coal production in Turkey with electric energy generated from power plants since the 1950s. However, the cost of power generation is high. Therefore, it has become necessary
Jan 1, 2005
-
Guideless Autonomous System for Underground Navigation
By Joseph N. Bakambu
It is currently recognized by mining society that autonomously guided underground mining vehicles may greatly increase the efficiency of mining production and improve human safety. Recent results in m
May 1, 2002
-
Electromagnetic Wire-Rope Testing --- Disparate LMA Results, an Ongoing Problem
By Marcel M. Djivre
Electromagnetic wire rope testing is the only practical non-destructive method to evaluate the current condition of wire ropes in general, and in the mining industry in particular. The method has been