Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Further Notes on a Field-Test for Gold

    By G. Vibert Douglas

    IN a previous paper by Douglas and Gillies (1), a simple field test was given for gold. Later work by the present writers, and by others who have kindly written to us, shows that the test is not as sa

    Jan 1, 1938

  • CIM
    Economic Analysis of Pit Slope Design

    By Young C. Kim

    A proper economic analysis of pit slope design must reflect the trade-off between the benefits and the increased risk of slope failure inherent in steeper slope angles. However, no formal framework fo

    Jan 1, 1979

  • CIM
    Geology of the NICO Au-Co-Bi Deposit & Sue-Dianne Cu-Ag Deposit, Southern Great Bear Magmatic Zone, Northwest Territories, Canada

    By Robin E. Goad

    ?Located 160 Km northwest of Yellowknife, NWT, Canada Current winter road access ?New all-weather road planned ?Power within 22 km ?Hwy to Edmonton 80 km south Close to existing infrastructure

    May 1, 2006

  • CIM
    Ecological Engineering in a Mining Context: Past Progress-Future Promise

    By Margarete Kalin

    Mine Waste Management ?Reduction of Sulphideoxidation or inhibiting weathering of rocks Geologist - broken or ground rocks Hydrologist - sources of contaminants Mining engineer - waste sites C

    May 1, 2013

  • CIM
    Financial and Geomechanical Optimization for Mine Pushbacks

    By M. Grenon

    OBJECTIVE ?To link slope stability and financial assessment algorithms into a commercially available mine design software packages to provide integrated global pit optimization.

    May 1, 2013

  • CIM
    The Quinsam Coal Project

    By Doug Barnstable

    "Quinsam Coal Ltd. is assessing the potential of developing a thermal coal deposit near Middle Quinsam Lake on Vancouver Island. The coal reserve outlined is classified as a high-volatile, bituminous

    Jan 1, 1980

  • CIM
    Sustainable Comminution? Giving Mining Clients What They Need, Expect and Deserve

    By J. Starkey

    A comminution circuit in recent history, is one of the most difficult parts of a mineral processing plant to design with confidence. It is usually the most costly part of a plant to build, and it can

    Jan 1, 2018

  • CIM
    Structural control of ore deposits in the Canadian Shield between Great Slave and Great Bear Lakes, Northwest Territories

    By J. F. Henderson

    Stable mining operations commenced in the Northwest Territories in 1933. Pitchblende from Great Bear lake and gold from the Yellowknife district are the main minerals produced. The value of pitchblend

    Jan 1, 1954

  • CIM
    Minimizing Failures of Truck Hoist Cylinders and Frames

    By J. L. Blaylock

    Normally, the hydraulic system and structures are considered to be unrelated items. In reality, the two cannot be separated because one affects and depends on the other to function properly. This pape

    Jan 1, 1979

  • CIM
    The Flooding of the Cominco Potash Mine and its Rehabilitation

    By Fritz F. Prugger

    In August, 1970, during routine shaft grouting, a major water source was intersected. Water and quicksand under very high pressure entered the shaft at a rate of 65 m3 per minute. The mine and both sh

    Jan 1, 1979

  • CIM
    Selected, State-of-the Art Mechatronic Systems in Polish Underground Mining Industry

    By K. Stankiewicz

    Projects as regards state-of-the-art mechatronic systems aiming at increase of safety in the mining industry and at improvement of coal production technologies, which have been completed at the KOMAG

    Aug 1, 2013

  • CIM
    The Oxygen Meter at MacLeod Cockshutt Gold Mines Ltd.

    By W. A. Grell

    "The oxygen meter has been in use at MacLeod Cockshutt Gold Mines for over a year, At MacLeod about 200 tons per day of reground concentrate containing roughly 10% pyrrhotite and 20% pyrite is cyanide

    Jan 1, 1964

  • CIM
    Compaction Localization in High Porosity Sandstones with Various Degrees of Heterogeneity: Insight from X-Ray Computed Tomography

    By L. Louis

    High resolution X-ray computed tomography imaging (with voxel size 48 µm) was conducted on various sandstone samples with different initial degrees of heterogeneity. All samples were imaged intact, an

    May 1, 2009

  • CIM
    Extensions to the Demonstration of Gy’s Formula

    Abstract-This paper discusses the fundamental question, "what is an adequate sample size?" in the light of recent developments regarding parameters of Gy’s well-known formula for predicting sampling v

    Jan 1, 1998

  • CIM
    Cobalt Removal from Zinc Sulfate Solution by Cu-Sb Activated Cementation with Zinc Dust – A New Understanding

    By J. Lu, D. B. Dreisinger, G. Houlachi

    "Zinc metal is primarily produced by electrowinning from sulfate solution. Zinc electrowinning is very sensitive to impurities such as Co and Ni. These impurities have to be removed to produce high-qu

    Jan 1, 2016

  • CIM
    A new hydrocyclic system for mineral separation

    By Alireza Sarafi, Alijan Aftabi

    "A hydrocyclic system used for mineral separation at the laboratory scale results in the separation of more than 90% of micas. The system functions only by water and might offer advantages where other

    Jan 1, 1994

  • CIM
    Targeted Geoscience Initiative III Geoscience? ?to help sustain the reserves of base metals in established mining communites? (Budget 2005)

    By Simon Hanner

    November 2005 Memorial University Newfoundland and Labrador Mines and Energy Review of Activities Exploration and Mining New Brunswick ?Université du Québec a Montréal McGill University 2005 Mani

    May 1, 2006

  • CIM
    Complex Processing of Phosphor Production Slag with Rare Earth Metals Recovery and Deriving of Silicon-Containing Solution

    By Ata Akcil, Z. B. Karshigina, Ye. G. Bochevskaya, Z. S. Abisheva

    "Phosphorus slag is the most heavy-tonnage waste of yellow phosphorus production, which is stored in the dump fields for many years creating ecological problems in the regions. Despite of the actions

    Jan 1, 2016

  • CIM
    Engineering and Production Practice of Double Bottom-Blowing Continuous Copper Smelting Process with "Three Connected Furnaces" Arrangement

    By Bing Li, Kai Liu, Yongcheng. Zhao

    With the ongoing development of copper smelting technology, the improvement of environmental emission control and achieving an automated continuous copper pyrometallurgical process have become the key

    Jan 1, 2019

  • CIM
    Environmental Geochemistry of Kimberlite Materials: Diavik Diamonds Project, Lac de Gras, Northwest Territories, Canada

    By J. L. Jambor, M. J. Baker, M. J. Logsdon

    "Abstract - Prior to the development of the Diavik Diamonds Project, baseline studies were conducted to determine the geochemical characteristics of four kimberlite orebodies as an aid in the design o

    Jan 1, 2001