Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Present Situations and Key Technologies of Exploration and Development of Coalbed Methane in Huanglong Jurassic Coalfield of China

    By Du Xinfeng

    The resource quantity of the low rank coalbed methane (CBM) accounts for 47% of the total resource quantity of CBM in China. Compared with the exploration and development of the high rank CBM in Qinsh

    Aug 1, 2013

  • CIM
    Potential of Laser Welding and Friction Stir Welding for Joining AA1100-16 VOL.% B4C Metal Matrix Composite

    This work illustrates the potential of two welding processes for joining AA1100-16 vol.% B4C metal matrix composite: laser welding process using a 4 kW Nd:YAG laser and Friction Stir Welding. A compar

    Jan 1, 2011

  • CIM
    Design of Hydraulic Backfill Bulkheads at South Deep Gold Mine

    By A. S. Nortjé

    At South Deep Gold Mine longhole stopes are backfilled using a cemented Cyclone Classified Tailings in its hydraulic state. The need to contain the hydraulic fill until cured requires a barricade. Due

    May 1, 2007

  • CIM
    On the use of Weight Loss to Determine Corrosion Rates of Stainless Steels in Hot, Concentrated Sulphuric Acid

    By J. R. Rodda

    Stainless steels are widely used to handle concentrated sulphuric acid (H2SO4) solutions produced in the manufacturing process, The majority of corrosion rate data published for stainless steel in pro

    Jan 1, 2010

  • CIM
    Ductile Fracture of AA2198 Aluminum-Copper-Lithium Alloys in the Aeronautical Industry

    By J. Q. Chen

    The elastic-plastic behavior and the fracture mechanisms of two 2198 Al-Cu-Li thin sheets are investigated. The first material (2 mm thick) is in a recrystallized state after cold rolling. The second

    Jan 1, 2011

  • CIM
    Development of BIM Based Rehabilitation and Maintenance Process for Roads

    By R. Heikkilä

    The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up to

    Aug 1, 2013

  • CIM
    Use of Radioactive Tracers to Support Mass Balances in Secondary Grinding Circuits

    By L. Vinnett, T. Ledezma, F. Contreras, F. Díaz

    "Mass balances in secondary grinding are subject to critical constraints mainly because of the unknown load distribution from the SAG mills, the uncertainties in the hydrocyclone split estimations and

    Jan 1, 2016

  • CIM
    The New Sidbec-Dosco Six-Strand Billet Caster

    By H. W. Leon, F. J. Ellis

    "This paper covers the new six-strand curved-mould billet casting machine at the Contrecoeur Works of SidbecDosco. It commenced production of 3 Yz-in. square billets at the beginning of January 1972.

    Jan 1, 1973

  • CIM
    L'exploitation minière du Mont-Wright

    By Gaston Gendreau

    CETTE PRÉSENTATION traitera des différentes phases des opérations de la mine du Mont-Wright depuis ses débuts jusqu'à présent. A une brève description de la géologie du gisement, suivra un exposé

    Jan 1, 1977

  • CIM
    Recovery of Magnetite from Spiral Tailings at Labrador City

    By T. C. Murphy, W. Taciuk

    In 1966, the Iron Ore Company of Canada commissioned a wet magnetic scavanging plant for the recovery of fine magnetite values p.resent in spiral tailings discharged from a spiral gravity separation p

    Jan 1, 1972

  • CIM
    Silver Standard Mine

    By Alexander Smith

    "The Silver Standard mine is 6 miles by road northwest of New Hazelton, B.C., a small town on the northern line of the Canadian National Railways some l 75 miles northeast of Prince Rupert. The deposi

    Jan 1, 1949

  • CIM
    Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", Poland

    By W. Swidzinski

    "Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola

    Jan 1, 2007

  • CIM
    Improving Flotation Circuit Performance with a Large Mechanical Flotation Cell

    By R. Grau

    "After commissioning and start-up of the first 500m3 TankCell® flotation cell in 2014, the over 300m3 mechanical flotation cells have earned their place in large-scale flotation operations. These 500

    Jan 1, 2019

  • CIM
    Development of BIM and Automation Based Total Process For Infra Construction ? The State of the Art in Finland

    By R. Heikkilä

    A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the developme

    Aug 1, 2013

  • CIM
    Metamorphogenic-Hydrothermal Nickel Mobilization and Remobilization: An Evaluation of these Processes in the Southern Quebec Serpentinite Belts

    By François Baillargeon

    Two types of ore deposit provide the bulk of the world nickel production. They are the hypogene magmatic massive sulfide deposits and the supergene lateritic deposits. Platinum group elements (PGE) ar

    May 1, 2003

  • CIM
    Retimbering No. 2 Shaft at Sigma Mines (Quebec) Limited

    By G. E. Peacock

    SIGMA MINES is situated in the township of Bourlamaque, Abitibi County, Quebec. It is a gold producer, and presently treats an average of 1,200 tons of ore per day, at a grade of approximately 0.18 oz

    Jan 1, 1962

  • CIM
    Kennecott Utah Copper Smelter Rebuild Over 11 Million Tonnes of Concentrate Smelted

    By D. Janney

    Kennecott's Utah Smelter commenced operations in June 1995 utilizing Outokumpu Flash Smelting (FSF) and Kennecott-Outokumpu Flash Converting (FCF) technology. After some initial teething and equi

    Jan 1, 2007

  • CIM
    Dragline Gold Dredging

    By Glenville A. Collins

    IN 1932, Horace Onyett at Oroville, California, built a practical floating washing plant along the general lines as now known, using a 24 in. by 12 ft. trammel; it was fed with a ½ yard dragline bucke

    Jan 1, 1945

  • CIM
    c) SO2 Air Cyanide Destruction Process:

    By G. Agar

    "E. Joe We have been working for some years on the elimination ofCANMET thiosulphates from solutions as a means of protecting ground water and fish streams. Alot of these thiosulphates result from the

    Jan 1, 1984

  • CIM
    Salt Deposits at McMurray, Alberta

    By J. A. Allan

    OCCURRENCES of salt in Alberta have been mentioned and described by the writer in 1929 (l) and by Cole in 1930 (2). Brine springs occur at a number of places along the valley of Athabaska river north

    Jan 1, 1937