Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine
By P. Miranda, K. Le, G. Maes, R. Peters
"The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f
Jan 1, 2015
-
How to use Energy Management to Improve Mining Operation Productivity and Reduce Downtime: Canadian Utility Company Incentive Programs
By A. Tylczak, C. Norman, C. Shook, S. Loif
"There are a lot of good reasons to manage energy use at mining operations. Optimizing process energy use reduces operating costs. Tracking energy use can help identify unplanned process changes or m
Jan 1, 2015
-
Water Utilization by Oil Sands Mines in Alberta
By Leslie F. Sawatsky
Raw water import requirements for oils sands mines depends mainly on factors such as ore processing rate, ore material characteristics, tailings processing technology, tailings storage systems, proces
May 1, 2004
-
Sustainable Manufacture: A Dilemma or Window of Opportunity?
By M. H. Attia
The concept of sustainable development has been evolved into a working framework for sustainable manufacturing, in which the environmental requirements are introduced into product development at the d
Jan 1, 2006
-
All-Hydraulic Bucket-Wheel Excavators (A Synopsis)
By Walter Durst
On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at
Jan 1, 1979
-
Market Driven Performance Improvements at Brunswick
By L. Flett, S. Woods, C. Deredin
"Following a significant reduction in world Imperial Smelting Furnace (ISF) capacity from 2003 to 2008, a major optimization initiative was successfully carried out on the lead upgrading and bulk (zin
Jan 1, 2013
-
A Unique Gold Casting Alloy for Dental Applications.
By Paul J. Cascone
This paper will discuss the science behind the development of a unique gold alloy for dental prosthetic applications. The alloy (GOLDTECH BIO2000) contains 99.7% gold providing unquestioned biocompati
Oct 1, 2003
-
Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity
By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss
"Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid
Jan 1, 2004
-
Perspectives on the scientific and engineering principles underlying flow of mineral pastes
By Michael Li, Arie Moerman
"Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method
Jan 1, 2002
-
Kerr-Addison Mine
By J. W. Baker
"The Kerr-Addison mine is on the northeast shore of Larder Lake in the township of McGarry, District of Timiskaming, Ontario. It lies just south of the highway leading to the town of Kirkland Lake, 25
Jan 1, 1949
-
Are REE Exploration Companies Doing Enough and/or the Right Testwork to Avoid Plant Failure?
By B. Yu, N. Verbaan, A. Mezei
The recent 20 years witnessed a boom and bust in the nickel laterite industry. Most notoriously is the story of the first three Western Australian nickel laterite projects which all suffered major ram
Jan 1, 2014
-
Design of the Pierina Waste Dump
By P. Mark. Hawley
Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa
May 1, 2002
-
Z1600 Jameson Cell Test Rig – From Rental to Revenue
By A. Taylor, M. Blanchette, J. Doucet
"A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i
Jan 1, 2012
-
Content and Structure of a Plant Grinding Performance Management/Improvement System
By K. Bartholomew
The Functional Performance Equation for ball milling circuits provides plant staff with a new means to improve circuit performance. However, successful execution of a plant processing performance impr
Jan 1, 2015
-
Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation
By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe
"Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan
Jan 1, 2011
-
Are you at Risk? The Role of Environmental Auditing in the Liability Dilemma
By J. B. Brodie, C. Pelletier
"The vulnerability of Canadian and U.S. companies, their directors, officers and employees to onerous penalties associated with violations of environmental statutes and common law actions has provided
Jan 1, 1988
-
Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine
By Trevor Yeomans, David Yaschyshyn
"Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini
Jan 1, 2001
-
An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan
By J. Yue
"Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of
Jan 1, 2017
-
Magnetoflotation in Nickel Ore Processing
By Peter Wells, Adrian Sabau, Turgut Yalcin
"The nickel ores of Sudbury contain substantial amounts of the gangue mineral pyrrhotite (Fe7S&) which causes certain diflculties in the milling of these ores. This paper proposes a process called “ma
Jan 1, 1999
-
Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit
By Dave Rose, David G. Meadows, Mike Westendorf
"Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a
Jan 1, 2016